Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fixed grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

WTG Energy Systems' Rotor: Steel at 80 Feet

The design, specifications, and performance of the 80 foot diameter fixed pitch rotor operating on the MP1-200 wind turbine generator installed as part of the Island of Cuttyhunk's electric power utility grid system are described. This synchronous generating system rated 200 kilowatts at 28 mph wind velocity, and produces constant 60 Hz, 480 VAC current at +/- 1 percent accuracy throughout the machine's operating range. Future R & D requirements and suggestions are included with cost data.

Barrows, R. E.↗

High-Resolution Mesoscale Simulations of the 6-7 May 2000 Missouri Flash Flood: Impact of Model Initialization and Land Surface Treatment

High-resolution mesoscale model simulations of the 6-7 May 2000 Missouri flash flood event were performed to test the impact of model initialization and land surface treatment on timing, intensity, and location of extreme precipitation. In this flash flood event, a mesoscale convective system (MCS) produced over 340 mm of rain in roughly 9 hours in some locations. Two different types of model initialization were employed: 1) NCEP global reanalysis with 2.5-degree grid spacing and 12-hour temporal resolution, and 2) Eta reanalysis with 40- km grid spacing and $hour temporal resolution. In addition, two different land surface treatments were considered. A simple land scheme. (SLAB) keeps soil moisture fixed at initial values throughout the simulation, while a more sophisticated land model (PLACE) allows for r interactive feedback. Simulations with high-resolution Eta model initialization show considerable improvement in the intensity of precipitation due to the presence in the initialization of a residual mesoscale convective vortex (hlCV) from a previous MCS. Simulations with the PLACE land model show improved location of heavy precipitation. Since soil moisture can vary over time in the PLACE model, surface energy fluxes exhibit strong spatial gradients. These surface energy flux gradients help produce a strong low-level jet (LLJ) in the correct location. The LLJ then interacts with the cold outflow boundary of the MCS to produce new convective cells. The simulation with both high-resolution model initialization and time-varying soil moisture test reproduces the intensity and location of observed rainfall.

Baker, R. David↗

Multigrid Reduction in Time for Nonlinear Parabolic Problems

The need for parallel-in-time is being driven by changes in computer architectures, where future speed-ups will be available through greater concurrency, but not faster clock speeds, which are stagnant.This leads to a bottleneck for sequential time marching schemes, because they lack parallelism in the time dimension. Multigrid Reduction in Time (MGRIT) is an iterative procedure that allows for temporal parallelism by utilizing multigrid reduction techniques and a multilevel hierarchy of coarse time grids. MGRIT has been shown to be effective for linear problems, with speedups of up to 50 times. The goal of this work is the efficient solution of nonlinear problems with MGRIT, where efficient is defined as achieving similar performance when compared to a corresponding linear problem. As our benchmark, we use the p-Laplacian, where p = 4 corresponds to a well-known nonlinear diffusion equation and p = 2 corresponds to our benchmark linear diffusion problem. When considering linear problems and implicit methods, the use of optimal spatial solvers such as spatial multigrid imply that the cost of one time step evaluation is fixed across temporal levels, which have a large variation in time step sizes. This is not the case for nonlinear problems, where the work required increases dramatically on coarser time grids, where relatively large time steps lead to worse conditioned nonlinear solves and increased nonlinear iteration counts per time step evaluation. This is the key difficulty explored by this paper. We show that by using a variety of strategies, most importantly, spatial coarsening and an alternate initial guess to the nonlinear time-step solver, we can reduce the work per time step evaluation over all temporal levels to a range similar with the corresponding linear problem. This allows for parallel scaling behavior comparable to the corresponding linear problem.

97 MATHEMATICS AND COMPUTING↗

Synchrophasor Data Anomaly Detection on Grid Edge by 5G Communication and Adjacent Compute

The fifth-generation mobile communication (5G) technology offers the opportunities to enhance the grid real-time monitoring. The 5G-enabled phasor measurement units (PMUs) features flexible positioning and cost-effective long-term maintenance, without constraints of fixing wire. This paper is the first to demonstrate the applicability of 5G in PMU communication, and the experiment was carried out at Verizon non-standalone testbed at Pacific Northwest National Laboratory (PNNL) Advanced Wireless Communication lab. The performance of 5G-enabled PMU communication setup is reviewed and discussed in this paper, and the paper presents a real-time dynamic linear model (DML) based synchrophasor data anomaly detection application. Last but not least, the practicability of implementing 5G for wide-area protection strategies is explored and discussed by analyzing the experimental results.

5G, Synchrophasor data, machine learning, anomaly ↗

Time-marching solution of incompressible Navier-Stokes equations for internal flow

Primitive variables with central differencing on a staggered grid are used in the present, factored ADI finite-difference scheme for artificial compressibility method solution of the incompressible Navier-Stokes equations, leading to a close coupling between velocity and pressure that both enhances stability and eliminates the need for artificial damping. Computational efficiency is enhanced through the use of a spatially variable, fixed Courant number-based time-step. The numerical results obtained for a driven cavity at Re of 10,000, with local cell Re as high as 100, exhibits no flow variable spatial oscillations on a 40 x 40 stretched grid solution.

Soh, W. Y.↗

Event generator tuning using Bayesian optimization

Monte Carlo event generators contain a large number of parameters that must be determined by comparing the output of the generator with experimental data. Generating enough events with a fixed set of parameter values to enable making such a comparison is extremely CPU intensive, which prohibits performing a simple brute-force grid-based tuning of the parameters. Bayesian optimization is a powerful method designed for such black-box tuning applications. In this article, we show that Monte Carlo event generator parameters can be accurately obtained using Bayesian optimization and minimal expert-level physics knowledge. A tune of the PYTHIA 8 event generator using $e^+e^-$ events, where 20 parameters are optimized, can be run on a modern laptop in just two days. Combining the Bayesian optimization approach with expert knowledge should enable producing better tunes in the future, by making it faster and easier to study discrepancies between Monte Carlo and experimental data.

47 OTHER INSTRUMENTATION↗

A Cooperative Game Theory-based Approach to Under-frequency Load Shedding Control

This paper proposes a cooperative game theory-based under-frequency load shedding (UFLS) approach for frequency stability and control in power systems. UFLS is a crucial factor for frequency stability and control especially in power grids with high penetration of renewable energy sources and restructured power systems. Conventional UFLS methods, most of which are off-line, usually shed fixed amounts of predetermined loads based on a predetermined schedule which can lead to over or under curtailment of load. This paper presents a co-operative game theory-based two-stage strategy to effectively and precisely determine locations and amounts of loads to be shed for UFLS control. In the first stage, the total amount of loads to be shed, also referred to as deficit in generation or the disturbance power, is computed using the initial rate of change of frequency (ROCOF) referred to the equivalent inertial center. In the second stage, the Shapley value, one of the solution concepts of cooperative game theory, is used to determine load shedding amounts and locations. The proposed method is implemented on the reduced 9-bus 3-machine Western Electricity Coordinating Council (WECC) system and simulated on Real-time Digital Simulators (RTDS). The results show that the proposed UFLS approach can effectively return the system to normal state after disturbances.

42 ENGINEERING↗

Trigonometric Interpolation and Quadrature in Perturbed Points

The trigonometric interpolants to a periodic function f in equispaced points converge if f is Dini-continuous, and the associated quadrature formula, the trapezoidal rule, converges if f is continuous. What if the points are perturbed? With equispaced grid spacing h, let each point be perturbed by an arbitrary amount <= alpha h, where alpha is an element of[0, 1/2) is a fixed constant. The Kadec 1/4 theorem of sampling theory suggests there may be trouble for alpha >= 1/4. We show that convergence of both the interpolants and the quadrature estimates is guaranteed for all alpha < 1/2 if f is twice continuously differentiable, with the convergence rate depending on the smoothness of f. More precisely, it is enough for f to have 4 alpha derivatives in a certain sense, and we conjecture that 2 alpha derivatives are enough. Connections with the Fejer-Kalmar theorem are discussed.

Fej´er–Kalm´ar theorem↗

On the Path to Energy Independence and a Clean Power Future – LED Lighting Retrofit and Solar Power Generation for the CTUIR Science and Engineering Laboratory and Public Transit Center (Rev.1)

This project supports the goals of the Energy Policy for the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through the implementation of an energy efficiency measure (LED lighting retrofit) and construction of a fixed rack (stationary) ground-mounted solar photovoltaic (PV) array energy generation system. The project objective was to eliminate the net demand for grid-based utility energy at two tribal facilities: the CTUIR Field Station and the Public Transit Center (consisting of bus barn and maintenance shop buildings). A total of 332 lighting fixtures were retrofitted with high efficiency LEDs at the three buildings within the project scope. The solar PV array constructed adjacent to the Field Station (46330 Timine Way, Pendleton, OR 97801) has a nameplate capacity of 97.98 kW DC . The project was managed by staff from the CTUIR Energy & Environmental Sciences Program within the Department of Natural Resources and the final budget was $\$ $288,206. Data was collected during a 12 month monitoring period following construction of the aptly named Ántukš–Tín̓qapapt Solar PV Array and assessed to determine project results. During this time, the solar PV system generated 125,580 kWh of energy according to SolrenView solar PV system monitoring service. In contrast, the total realized utility energy and cost savings due to the project were estimated by comparing 24 months of consecutive utility billing data. Results of this comparison indicate that grid-based utility energy demand was reduced by 121,280 kWh, or roughly 80% of the total electricity consumed by both facilities. The cost savings associated with this energy demand reduction were $\$ $11,104 and a payback period of 5.7 years was estimated for recovering the CTUIR’s investment. However, it should be noted that these figures are not representative of the savings that could be obtained under normal, error-free (i.e. faultless) conditions. Several undesirable events occurred during the 12 month monitoring and evaluation period, the effects of which were quantified using available data so that results under a “Faultless Scenario” could be estimated. Annual energy and cost savings estimated for the Faultless Scenario were approximately 166,289 kWh and $\$ $15,225, respectively. These figures should prove to be more representative of the long-term average annual results achieved in response to the project and suggest a payback period closer to 4.5 years for the CTUIR.

14 SOLAR ENERGY↗

Algebraic Generation Of Two-Dimensional Grids

Two-Boundary Grid Generation (TBGG) computer program applies interactive algebraic grid-generation technique in two dimensions. Incorporates algebraic equations that relate uniform rectangular computational domain to arbitrary physical domain. Hermite cubic interpolation performed between fixed, nonintersecting boundaries. Applied to variety of problems in which discrete techniques used to solve such partial differential equations as governing equations of fluid flow. Written in FORTRAN 77.

Smith, Robert E.↗

An Introduction to the NASA GMAO Coupled Atmosphere-Ocean System - GEOS-S2S Version 3

Recently NASA's Global Modeling and Assimilation Office (GMAO) has developed a new Subseasonal to Seasonal Prediction system Version 3 (GEOS-S2S-3). This upgrade replaces the GEOS-S2S-2 which is NASA's current contribution to the North American Multi-Model Experiment seasonal prediction project (Kirtman et al., 2014). The main improvements for our S2S-3 system include 1) a higher resolution MOM5 (Griffies et al., 2005) ocean model (now 0.25o x 0.25o x 50 layers), 2) an improved atmospheric/ocean interface layer (Akella and Suarez, 2018), and 3) assimilation of a long-track satellite salinity into the ocean model (Hackert et al, 2019). Atmospheric forcing is provided by the NASA MERRA-2 reanalysis (Gelaro et al., 2017). Initialization for the ocean relies on the GMAO ocean reanalysis system which assimilates all available in situ temperature and salinity, satellite sea surface salinity, and sea level using the Local Ensemble Transform Kalman Filter (LETKF) implementation of (Penny et al., 2013) on a 5 day assimilation cycle with 20 fixed ensemble members.In this presentation, we will authenticate our new S2S-3 ocean reanalysis using standard GODAE validation metrics. For example, we will compare gridded fields of mean and standard deviation of the ocean reanalysis versus observed fields. We will show correlation/RMS of model versus observations and temperature and salinity mean profiles for the various basins and latitude bands. Basin-scale volume transports, such as the Atlantic Meridional Overturning Circulation and the Indonesian Throughflow will be validated. Equatorial ocean waves will be compared by decomposing sea level into Kelvin and Rossby components. For each of these metrics, we plan to validate the results and then compare our new S2S-3 against the current production version, S2S-2. Finally, we will compare 9-month seasonal forecasts initialized from these two systems for the tropical Pacific NINO3.4 region over the period 1981-present.

Molod, Andrea↗

Emergency Diesel Generator Reliability and Installation Energy Security

The U.S. Department of Defense’s (DoD’s) fixed installations - or military bases - are a critical element of national security. Military bases support the maintenance and deployment of weapons systems, training and mobilization of combat forces, and provide direct support to combat operations. Fixed installations do not operate without energy and they rely largely on electricity to support critical missions and functions. Installations are dependent on a commercial grid that is vulnerable to disruption due to severe weather, physical attacks, and cyberattacks. This report looks at the impact on the highest priority critical loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Double ion production in mercury thrusters

The development of a model which predicts doubly charged ion density is discussed. The accuracy of the model is shown to be good for two different thruster sizes and a total of 11 different cases. The model indicates that in most cases more than 80% of the doubly charged ions are produced from singly charged ions. This result can be used to develop a much simpler model which, along with correlations of the average plasma properties, can be used to determine the doubly charged ion density in ion thrusters with acceptable accuracy. Two different techniques which can be used to reduce the doubly charged ion density while maintaining good thruster operation, are identified as a result of an examination of the simple model. First, the electron density can be reduced and the thruster size then increased to maintain the same propellant utilization. Second, at a fixed thruster size, the plasma density, temperature and energy can be reduced and then to maintain a constant propellant utilization the open area of the grids to neutral propellant loss can be reduced through the use of a small hole accelerator grid.

Peters, R. R.↗

Modeling of Combined Lead Fast Reactor and Concentrating Solar Power Supercritical Carbon Dioxide Cycles to Demonstrate Feasibility, Efficiency Gains, and Cost Reductions

Solar power has innate issues with weather, grid demand and time of day, which can be mitigated through use of thermal energy storage for concentrating solar power (CSP). Nuclear reactors, including lead-cooled fast reactors (LFRs), can adjust power output according to demand; but with high fixed costs and low operating costs, there may not be sufficient economic incentive to make this worthwhile. We investigate potential synergies through coupling CSP and LFR together in a single supercritical CO 2 Brayton cycle and/or using the same thermal energy storage. Combining these cycles allows for the LFR to thermally charge the salt storage in the CSP cycle during low-demand periods to be dispatched when grid demand increases. The LFR/CSP coupling into one cycle is modeled to find the preferred location of the LFR heat exchanger, CSP heat exchanger, sCO 2 -to-salt heat exchanger (C2S), turbines, and recuperators within the supercritical CO 2 Brayton cycle. Three cycle configurations have been studied: two-cycle configuration, which uses CSP and LFR heat for dedicated turbocompressors, has the highest efficiencies but with less component synergies; a combined cycle with CSP and LFR heat sources in parallel is the simplest with the lowest efficiencies; and a combined cycle with separate high-temperature recuperators for both the CSP and LFR is a compromise between efficiency and component synergies. Additionally, four thermal energy storage charging techniques are studied: the turbine positioned before C2S, requiring a high LFR outlet temperature for viability; the turbine after the C2S, reducing turbine inlet temperature and therefore power; the turbine parallel to the C2S producing moderate efficiency; and a dedicated circulator loop. While all configurations have pros and cons, use of a single cycle offers component synergies with limited efficiency penalty. Using a turbine in parallel with the C2S heat exchanger is feasible but results in a low charging efficiency, while a dedicated circulator loop offers flexibility and near-perfect heat storage efficiency but increasing cost with additional cycle components.

14 SOLAR ENERGY↗

Postprocessing Mixed Finite Element Methods For Solving Cahn–Hilliard Equation: Methods and Error Analysis

A postprocessing technique for mixed finite element methods for the Cahn-Hilliard equation is developed and analyzed. Once the mixed finite element approximations have been computed at a fixed time on the coarser mesh, the approximations are postprocessed by solving two decoupled Poisson equations in an enriched finite element space (either on a finer grid or a higher-order space) for which many fast Poisson solvers can be applied. The nonlinear iteration is only applied to a much smaller size problem and the computational cost using Newton and direct solvers is negligible compared with the cost of the linear problem. The analysis presented here shows that this technique remains the optimal rate of convergence for both the concentration and the chemical potential approximations. The corresponding error estimate obtained in our paper, especially the negative norm error estimates, are non-trivial and different with the existing results in the literatures.

97 MATHEMATICS AND COMPUTING↗

Oregon Offshore Wind Site Feasibility and Cost Study

The work performed in this Oregon study assessed the present and future costs of floating offshore wind technology deployment in the state of Oregon at commercial scale. It is widely recognized that floating offshore wind energy technology will be needed if significant offshore wind deployment in the Pacific region is to occur. The study was performed by the National Renewable Energy Laboratory (NREL) and its subcontractors and funded by the Bureau of Ocean Energy Management (BOEM). It was based, in part, on assumptions and analysis from an NREL report titled 'A Spatial-Economic Cost-Reduction Pathway Analysis for U.S. Offshore Wind Energy Development from 2015-2030' (Beiter et al. 2016), which supported the 'National Offshore Wind Strategy' (Gilman et al. 2016). The strategy builds on the previous DOE Wind Vision Study Scenario of 86 gigawatts (GW) of offshore wind deployed by 2050 in the United States. Under the Wind Vision scenario, 20% (17.2 GW installed capacity) of the nation's total offshore wind in 2050 comes from the Pacific coastal states (DOE 2015), which will require the development of floating wind technologies. Although most offshore development to date has been in depths of 50 meters (m) or less, 97% of Oregon's offshore wind resource is in water depths greater than 60 m, where floating wind is assumed to be needed. Floating offshore wind technology is still in its nascent stage of development but is advancing toward commercialization in both Europe and Asia. In this report, we use available floating prototype costs, pilot-scale costs, and commercial-scale costs from fixed-bottom offshore wind projects to model and analyze the cost of floating wind for five hypothetical wind sites in Oregon using specific geographical and utility grid information.

17 WIND ENERGY↗

Ground effects on Loran-C signals

In conjunction with the test and evaluation of the position fixing capabilities of the Army Manpack Loran Receiver AN/PSN-6, an extensive series of time difference and signal amplitude measurements were made within a 100 km map grid square encompassing Fort Monmouth, New Jersey. The test location is within the coverage area of the East Coast Loran-C Chain. The data were used to develop a simple smooth-earth model for the test area as well as to estimate the magnitude and distributions of deviations from this model. Local propagation processes associated with topographic features and the grid of overhead wires in the test area are shown to contribute to the deviations from the model.

Pearce, D. C.↗

Simulator study of the effect of visual-motion time delays on pilot tracking performance with an audio side task

The effect of time delay was determined in the visual and motion cues in a flight simulator on pilot performance in tracking a target aircraft that was oscillating sinusoidally in altitude only. An audio side task was used to assure the subject was fully occupied at all times. The results indicate that, within the test grid employed, about the same acceptable time delay (250 msec) was obtained for a single aircraft (fighter type) by each of two subjects for both fixed-base and motion-base conditions. Acceptable time delay is defined as the largest amount of delay that can be inserted simultaneously into the visual and motion cues before performance degradation occurs. A statistical analysis of the data was made to establish this value of time delay. Audio side task provided quantitative data that documented the subject's work level.

Riley, D. R.↗