Approximation Of Maximum A Posteriori Estimators Using Bayes Estimators.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This report compares the performance of three Circular Error Probable (CEP) estimators: the Grubbs-Patnaik estimator, a new, non-iterative, radial-integration estimator, and a median estimator. It also compares the performance of two Spherical Error Probable (SEP) estimators. The performance of each estimator is assessed in terms of bias, uncertainty, robustness, and computational complexity. Robustness is evaluated with respect to outliers, variations in the underlying statistical distribution characterizing munition impact positions, and impact-position measurement errors. The performance assessments indicate the radial-integration and Grubbs-Patnaik estimators perform nearly identically providing the statistical distribution of impact-position coordinates is jointly normal with zero means. In that case, both estimators outperform the median estimator by about 2% relative to the true CEP in terms of estimator uncertainty. The bias performance of the radial-integration and median estimators is close to zero for jointly normal impacts, however, the Grubbs-Patnaik estimator can be significantly biased for jointly normal impacts with non-zero means. When the statistical distribution characterizing impact positions is known, but not jointly normal, the radial-integration estimator is superior. In this case, the median estimator also outperforms the Grubbs-Patnaik estimator but is not quite as good as the radial-integration estimator. If the statistical distribution characterizing impacts is unknown and not jointly normal, or if distribution parameters are difficult or impractical to estimate, or if test data is corrupted with outliers, then the median estimator dramatically outperforms the other estimators, especially in terms of estimation bias. Unexpectedly, measurement noise did not significantly degrade the performance of any of the estimators, except for cases with signal to noise ratios less than five. Although the Grubbs-Patnaik estimator has remained the gold standard for CEP estimation for over half a century, the performance assessments indicate the new, non-iterative, radial-integration estimator and the median estimator offer significant advantages and, in most practical real-world conditions, are superior estimators. These estimators are also useful for SEP estimation whereas the Grubbs-Patnaik estimator does not extend to three dimensions.
In 2005, the University of Washington developed a new statistical model to analyze the combined juvenile and adult detection histories of PIT-tagged salmon migrating through the Federal Columbia River Power System (FCRPS). This model, implemented by software Program ROSTER (River-Ocean Survival and Transportation Effects Routine), has been used to estimate survival and transportation effects on large temporal and spatial scales for PIT-tagged hatchery spring and summer Chinook salmon and steelhead released in the Snake River Basin from 1996 to 2003. Those results are reported here. Annual estimates of the smolt-to-adult return ratio (SAR), juvenile inriver survival from Lower Granite to Bonneville, the ocean return probability from Bonneville to Bonneville, and adult upriver survival from Bonneville to Lower Granite are reported. Annual estimates of transport-inriver (T/I) ratios and differential post-Bonneville mortality (D) are reported on both a systemwide basis, incorporating all transport dams analyzed, and a dam-specific basis. Transportation effects are estimated only for dams where at least 5,000 tagged smolts were transported from a given upstream release group. Because few tagged hatchery steelhead were transported in these years, no transportation effects are estimated for steelhead. Performance measures include age-1-ocean adult returns for steelhead, but not for Chinook salmon. Annual estimates of SAR from Lower Granite back to Lower Granite averaged 0.71% with a standard error (SE) of 0.18% for spring Chinook salmon from the Snake River Basin for tagged groups released from 1996 through 2003, omitting age-1-ocean (jack) returns. For summer Chinook salmon from the Snake River Basin, the estimates of annual SAR averaged 1.15% (SE=0.31%). Only for the release years 1999 and 2000 did the Chinook SAR approach the target value of 2%, identified by the NPCC as the minimum SAR necessary for recovery. Annual estimates of SAR for hatchery steelhead from the Snake River Basin averaged 0.45% (SE=0.11%), including age-1-ocean returns, for release years 1996 through 2003. For release years when the ocean return probability from Bonneville back to Bonneville could be estimated (i.e., 1999 through 2003), it was estimated that on average approximately 86% of the total integrated mortality for nontransported, tagged hatchery spring and summer Chinook, and 74% for steelhead, occurred during the ocean life stage (i.e., from Bonneville to Bonneville). This suggests that additional monitoring and research efforts should include the ocean and estuary environment. Annual estimates of the systemwide T/I are weighted averages of the dam-specific T/I ratios for each transport dam (with {ge} 5,000 tagged fish transported), weighted by the probabilities of being transported at each dam. The systemwide T/I compares the observed SAR under the existing transportation system with the expected SAR if the transportation system had not been operated. Estimates of 1.0 indicate that the systemwide transportation program has no effect on SAR, while estimates > 1.0 indicate that the transportation program increases SAR. Excluding the 2001 release group, the geometric mean of the systemwide T/I estimates for hatchery spring Chinook salmon from the Snake River Basin was 1.15 (SE=0.03) for release years 1997 through 2003. The geometric mean of the systemwide T/I estimates for hatchery summer Chinook salmon from the Snake River Basin was 1.28 (SE=0.13) for release years 1997 through 2000 and 2003. Estimates were much higher for the 2001 release groups. These estimates reflect transportation from Lower Granite and/or Little Goose for most release years, depending on the number of tagged smolts actually transported at each dam during each release year. Differential post-Bonneville mortality (D) is the ratio of post-Bonneville survival to Lower Granite Dam of transported fish to that of nontransported ('inriver') fish. Excluding the 2001 release year, the geometric mean of the D estimates for hatchery spring Chinook salmon from the Snake River Basin was 1.00 (SE=0.09) for release years 1997 through 2003. For hatchery summer Chinook salmon from the Snake River Basin, the geometric mean of the D estimates was 1.32 (SE=0.27) for release years 1997 through 2000 and 2003. These estimates reflect transportation from Lower Granite and/or Little Goose, depending on the number of tagged smolts actually transported at each dam during each release year. Approximately half the point estimates of D for both spring and summer Chinook salmon were 1.0 or greater, indicating that for those release groups, transported fish did not have lower ocean and adult survival than nontransported fish. For those years with estimates of D < 1.0, the systemwide T/I estimates were always {ge} 1.0, indicating that despite lower ocean and adult survival of transported fish, transportation did not lower SAR overall.
The combined juvenile and adult detection histories of PIT-tagged wild salmonids migrating through the Federal Columbia River Power System (FCRPS) were analyzed using the ROSTER (River-Ocean Survival and Transportation Effects Routine) statistical release-recapture model. This model, implemented by software Program ROSTER, was used to estimate survival on large temporal and spatial scales for PIT-tagged wild spring and summer Chinook salmon and steelhead released in the Snake River Basin upstream of Lower Granite Dam from 1996 to 2004. In addition, annual results from wild salmonids were compared with results from hatchery salmonids, which were presented in a previous report in this series (Buchanan, R. A., Skalski, J. R., Lady, J. L., Westhagen, P., Griswold, J., and Smith, S. 2007, 'Survival and Transportation Effects for Migrating Snake River Hatchery Chinook Salmon and Steelhead: Historical Estimates from 1996-2003', Technical report, Bonneville Power Administration, Project 1991-051-00). These results are reported here. Annual estimates of the smolt-to-adult return ratio (SAR), juvenile inriver survival from Lower Granite to Bonneville, the ocean return probability from Bonneville to Bonneville, and adult upriver survival from Bonneville to Lower Granite are reported. Annual estimates of transport-inriver (T/I) ratios and differential post-Bonneville mortality (D) are reported on a dam-specific basis for release years with sufficient numbers of wild PIT-tagged smolts transported. Transportation effects are estimated only for dams where at least 1,000 tagged wild smolts were transported from a given upstream release group. Because few wild Chinook salmon and steelhead tagged upstream of Lower Granite Dam were transported before the 2003 release year, T/I and D were estimated only for the 2003 and 2004 release years. Performance measures include age-1-ocean adult returns for steelhead, but not for Chinook salmon. Spring and summer Chinook salmon release groups were pooled across the entire Snake River Basin upstream of Lower Granite Dam for this report. Annual estimates of SAR from Lower Granite back to Lower Granite averaged 0.92% with an estimated standard error (dSE) of 0.25% for wild spring and summer Chinook salmon for tagged groups released from 1996 through 2004, omitting age-1-ocean (jack) returns. Only for the 1999 and 2000 release years did the wild Chinook SAR approach the target value of 2%, identified by the NPCC as the minimum SAR necessary for recovery. Annual estimates of SAR for wild steelhead from the Snake River Basin averaged 0.63% (dSE = 0.15%), including age-1-ocean returns, for release years 1996 through 2004. For release years when the ocean return probability from Bonneville back to Bonneville could be estimated (i.e., 1999 through 2004), it was estimated that on average approximately 83% of the total integrated mortality for nontransported, tagged wild spring and summer Chinook, and 78% for steelhead (omitting the 2001 release year), occurred during the ocean life stage (i.e., from Bonneville to Bonneville). This suggests that additional monitoring and research efforts should include the ocean and estuary environment. Annual estimates of the dam-specific T/I for Lower Granite Dam were available for the 2003 and 2004 release years for both wild Chinook salmon and wild steelhead. The estimated T/I for Lower Granite was significantly > 1.0 for Chinook in 2004 (P < 0.0001) and for steelhead in both 2003 (P < 0.0001) and 2004 (P < 0.0001), indicating that for these release years, wild fish transported at Lower Granite returned there in higher proportions than fish that were returned to the river at Lower Granite, or that passed Lower Granite without detection as juveniles. Annual estimates of the dam-specific T/I for Little Goose Dam were available for wild Chinook salmon for both 2003 and 2004. The estimated T/I for Little Goose was significantly > 1.0 for wild Chinook in 2004 (P = 0.0024), but not in 2003 (P = 0.1554). Differential post-Bonneville mortality (D) is the ratio of post-Bonneville survival to Lower Granite Dam of transported fish to that of nontransported ('inriver') fish. Estimates of D were available for transportation from Lower Granite and Little Goose dams in 2003 and 2004 for wild Chinook, and from Lower Granite Dam in 2003 and 2004 for wild steelhead. Point estimates ranged from 0.74 (dSE = 0.29) for transportation of wild Chinook salmon from Lower Granite Dam in 2003 to 1.91 (dSE = 0.61) for transportation of wild steelhead from Lower Granite Dam in 2003. Small transport groups resulted in high uncertainty on the point estimates, and only for 2003 steelhead transported from Lower Granite Dam did transported fish have significantly greater post-Bonneville survival than nontransported fish (P = 0.0213).
We wish to better constrain the properties of solar flares by exploring how parameterized models of solar flares interact with uncertainty estimation methods. We compare four different methods of calculating uncertainty estimates in fitting parameterized models to Ramaty High Energy Solar Spectroscopic Imager X-ray spectra, considering only statistical sources of error. Three of the four methods are based on estimating the scale-size of the minimum in a hypersurface formed by the weighted sum of the squares of the differences between the model fit and the data as a function of the fit parameters, and are implemented as commonly practiced. The fourth method is also based on the difference between the data and the model, but instead uses Bayesian data analysis and Markov chain Monte Carlo (MCMC) techniques to calculate an uncertainty estimate. Two flare spectra are modeled: one from the Geostationary Operational Environmental Satellite X1.3 class flare of 2005 January 19, and the other from the X4.8 flare of 2002 July 23. We find that the four methods give approximately the same uncertainty estimates for the 2005 January 19 spectral fit parameters, but lead to very different uncertainty estimates for the 2002 July 23 spectral fit. This is because each method implements different analyses of the hypersurface, yielding method-dependent results that can differ greatly depending on the shape of the hypersurface. The hypersurface arising from the 2005 January 19 analysis is consistent with a normal distribution; therefore, the assumptions behind the three non-Bayesian uncertainty estimation methods are satisfied and similar estimates are found. The 2002 July 23 analysis shows that the hypersurface is not consistent with a normal distribution, indicating that the assumptions behind the three non-Bayesian uncertainty estimation methods are not satisfied, leading to differing estimates of the uncertainty. We find that the shape of the hypersurface is crucial in understanding the output from each uncertainty estimation technique, and that a crucial factor determining the shape of hypersurface is the location of the low-energy cutoff relative to energies where the thermal emission dominates. The Bayesian/MCMC approach also allows us to provide detailed information on probable values of the low-energy cutoff, E{sub c} , a crucial parameter in defining the energy content of the flare-accelerated electrons. We show that for the 2002 July 23 flare data, there is a 95% probability that E{sub c} lies below approximately 40 keV, and a 68% probability that it lies in the range 7-36 keV. Further, the low-energy cutoff is more likely to be in the range 25-35 keV than in any other 10 keV wide energy range. The low-energy cutoff for the 2005 January 19 flare is more tightly constrained to 107 {+-} 4 keV with 68% probability. Using the Bayesian/MCMC approach, we also estimate for the first time probability density functions for the total number of flare-accelerated electrons and the energy they carry for each flare studied. For the 2002 July 23 event, these probability density functions are asymmetric with long tails orders of magnitude higher than the most probable value, caused by the poorly constrained value of the low-energy cutoff. The most probable electron power is estimated at 10{sup 28.1} erg s{sup -1}, with a 68% credible interval estimated at 10{sup 28.1}-10{sup 29.0} erg s{sup -1}, and a 95% credible interval estimated at 10{sup 28.0}-10{sup 30.2} erg s{sup -1}. For the 2005 January 19 flare spectrum, the probability density functions for the total number of flare-accelerated electrons and their energy are much more symmetric and narrow: the most probable electron power is estimated at 10{sup 27.66{+-}0.01} erg s{sup -1} (68% credible intervals). However, in this case the uncertainty due to systematic sources of error is estimated to dominate the uncertainty due to statistical sources of error.
We define a 0Day vulnerability to be any vulnerability, in deployed software, which has been discovered by at least one person but has not yet been publicly announced or patched. These 0Day vulnerabilities are of particular interest when assessing the risk to well managed control systems which have already effectively mitigated the publicly known vulnerabilities. In these well managed systems the risk contribution from 0Days will have proportionally increased. To aid understanding of how great a risk 0Days may pose to control systems, an estimate of how many are in existence is needed. Consequently, using the 0Day definition given above, we developed and applied a method for estimating how many 0Day vulnerabilities are in existence on any given day. The estimate is made by: empirically characterizing the distribution of the lifespans, measured in days, of 0Day vulnerabilities; determining the number of vulnerabilities publicly announced each day; and applying a novel method for estimating the number of 0Day vulnerabilities in existence on any given day using the number of vulnerabilities publicly announced each day and the previously derived distribution of 0Day lifespans. The method was first applied to a general set of software applications by analyzing the 0Day lifespans of 491 software vulnerabilities and using the daily rate of vulnerability announcements in the National Vulnerability Database. This led to a conservative estimate that in the worst year there were, on average, 2500 0Day software related vulnerabilities in existence on any given day. Using a smaller but intriguing set of 15 0Day software vulnerability lifespans representing the actual time from discovery to public disclosure, we then made a more aggressive estimate. In this case, we estimated that in the worst year there were, on average, 4500 0Day software vulnerabilities in existence on any given day. We then proceeded to identify the subset of software applications likely to be used in some control systems, analyzed the associated subset of vulnerabilities, and characterized their lifespans. Using the previously developed method of analysis, we very conservatively estimated 250 control system related 0Day vulnerabilities in existence on any given day. While reasonable, this first order estimate for control systems is probably far more conservative than those made for general software systems since the estimate did not include vulnerabilities unique to control system specific components. These control system specific vulnerabilities were unable to be included in the estimate for a variety of reasons with the most problematic being that the public announcement of unique control system vulnerabilities is very sparse. Consequently, with the intent to improve the above 0Day estimate for control systems, we first identified the additional, unique to control systems, vulnerability estimation constraints and then investigated new mechanisms which may be useful for estimating the number of unique 0Day software vulnerabilities found in control system components. We proceeded to identify a number of new mechanisms and approaches for estimating and incorporating control system specific vulnerabilities into an improved 0Day estimation method. These new mechanisms and approaches appear promising and will be more rigorously evaluated during the course of the next year.
As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program properties, Argonne National Laboratory assisted the U.S. Army Corps of Engineers (USACE) New York District in revising contaminated soil volume estimates for the remaining areas of the Stepan/Sears properties that require soil remediation. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations; both sampling results and down-hole gamma data were coded to identify whether the results indicated the presence of contamination above site cleanup requirements. Significant effort was invested in developing complete electronic data sets for the site by incorporating data contained in various scanned documents, maps, etc. The updating process yielded both a best guess estimate of contamination volumes and upper and lower bounds on the volume estimate that reflected the estimate's uncertainty. The site-wide contaminated volume estimate (with associated uncertainty) was adjusted to reflect areas where remediation was complete; the result was a revised estimate of the remaining soil volumes requiring remediation that the USACE could use for planning. Other environmental projects may benefit from this process for estimating the volume of contaminated soil. A comparison of sample and DHG results for various stations with the site ICSM provides one measure of the quality of site understanding relative to the presence of contamination and its likely extent. A second measure of the quality of a contaminated soil volume estimate, in the case of BAASS, is a comparison of the best guess volume estimate with the conservative volume estimate. For Maywood, the conservative volume estimate is more than double the best guess. The data available for the site indicate that the preponderance of this difference is attributable to uncertainty about the exact depth of known contamination. The observed depth of contamination based on sample results and DHG data often varied significantly among adjacent soil cores. In the case of Maywood, where a significant amount of remediation has already taken place, a third measure of the quality of the volume estimates is the retrospective estimate of contaminated soil volumes for areas that have already been remediated [2]. The USACE is currently comparing the latest BAASS volume estimates for those areas with records indicating what was actually removed. (authors)
Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.
Monte Carlo (MC) simulation is used to solve the eigenvalue form of the Boltzmann transport equation to estimate various parameters such as fuel pin flux distributions that are crucial for the safe and efficient operation of nuclear systems (e.g., a nuclear reactor). Monte Carlo eigenvalue simulation uses a sample mean over many stationary cycles (iterations) to estimate various parameters important to nuclear systems. A variance estimate of the sample mean is often used for calculating the confidence intervals. However, MC eigenvalue simulation variance estimators that ignore the intercycle correlation underestimate the true variance of the estimated quantity. This paper presents novel data-adaptive approaches based on a simple autoregressive (AR) model and sigmoid functions to improve MC variance estimation. The standard MC sample-based variance estimator (or naïve estimator) and the spectral density–based MC variance estimator are enhanced by adding data-adaptive components that reduce their bias and improve performance. By investigating the frequency pattern of the AR(1) (order 1) model, two adaptive spectral estimators and one adaptive naïve estimator are proposed. The proposed estimators manifest superior performance when applied to three test problems compared to the standard spectral density–based estimator previously introduced by the authors. In conclusion, these new estimators are straightforward, as they use online algorithms and do not require storage of tallies from all active cycles.
The technical ability to decommission NPPs shut down after normal operation has been well demonstrated. However, concerns remain about the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international guidance on quality cost estimates for nuclear decommissioning projects and explores the potential added value that could be attained through more systematic analysis and reporting of decommissioning project costs. The OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) have long been concerned about the need to promote greater transparency in decommissioning costing and have collaborated in a number of initiatives in pursuit of this objective. Together with the European Commission, they published 'The International Structure for Decommissioning Costing (ISDC)' in 2012. The ISDC provides a useful common reporting format for decommissioning costing. The NEA has also published guidance on the international peer reviews of decommissioning cost studies (2014) and on the practice of decommissioning cost estimation (2015). In September 2017, the NEA and IAEA published detailed guidance on addressing uncertainties in decommissioning cost estimates (the 'Addressing Uncertainties' report). This joint report sets out an approach to treating uncertainties reflecting current good practices in cost estimating. Specifically, it describes how uncertainties in decommissioning cost estimation can be addressed using standardized methods of estimating uncertainty and risk analysis. Its recommendations aim at enabling a consistent and comprehensive treatment of risk and uncertainty in the preparation of decommissioning cost estimates. Together these publications establish a good basis for producing comprehensive and high-quality cost estimates for nuclear decommissioning projects and for enhancing confidence in the estimates through improving transparency concerning the underpinning data and calculations, and more explicit representation of the uncertainties that may impact on project costs. There is increasing attention on understanding variations between cost estimates and apparent escalation of decommissioning costs. This arises both from the need to assure the adequacy of financing arrangements for future decommissioning projects and the ambition to improve the performance and ensure value-for-money in the delivery of decommissioning projects and services. A systematic analysis of actual decommissioning project costs in relation to the cost estimates would be expected to yield valuable insights about key cost drivers in actual decommissioning projects, and the extent to which current cost estimates accurately capture and reflect these. Aligning the reporting of decommissioning project costs with the underpinning cost estimates for the projects would also facilitate the identification of causes of major deviations between projected and actual costs. (authors)
Purpose: Traditional ways to estimate 2D CT noise power spectrum (NPS) involve an ensemble average of the power spectrums of many noisy scans. When only a few scans are available, regions of interest are often extracted from different locations to obtain sufficient samples to estimate the NPS. Using image samples from different locations ignores the nonstationarity of CT noise and thus cannot accurately characterize its local properties. The purpose of this work is to develop a method to estimate local NPS using only a few fan-beam CT scans. Methods: As a result of FBP reconstruction, the CT NPS has the same radial profile shape for all projection angles, with the magnitude varying with the noise level in the raw data measurement. This allows a 2D CT NPS to be factored into products of a 1D angular and a 1D radial function in polar coordinates. The polar separability of CT NPS greatly reduces the data requirement for estimating the NPS. The authors use this property and derive a radial NPS estimation method: in brief, the radial profile shape is estimated from a traditional NPS based on image samples extracted at multiple locations. The amplitudes are estimated by fitting the traditional local NPS to the estimated radial profile shape. The estimated radial profile shape and amplitudes are then combined to form a final estimate of the local NPS. We evaluate the accuracy of the radial NPS method and compared it to traditional NPS methods in terms of normalized mean squared error (NMSE) and signal detectability index. Results: For both simulated and real CT data sets, the local NPS estimated with no more than six scans using the radial NPS method was very close to the reference NPS, according to the metrics of NMSE and detectability index. Even with only two scans, the radial NPS method was able to achieve a fairly good accuracy. Compared to those estimated using traditional NPS methods, the accuracy improvement was substantial when a few scans were available. Conclusions: The radial NPS method was shown to be accurate and efficient in estimating the local NPS of FBP-reconstructed 2D CT images. It presents strong advantages over traditional NPS methods when the number of scans is limited and can be extended to estimate the in-plane NPS of cone-beam CT and multislice helical CT scans.
In criticality calculations, the effective multiplication factor (k{sub eff}) is an important parameter for reactor analysis. It can be interpreted as the ratio of the neutron production rate to the loss rate in a reactor core. In Monte Carlo (MC) criticality calculations, k{sub eff} is obtained for each active cycle i as: k-i = P{sub i}/L{sub i} for I = 1 to I where P{sub i} and L{sub i} are the production rate and the loss rate at cycle i, respectively, and they are normalized by the nominal source size for cycle. Since all neutron particles in a cycle will be absorbed or leaks out at the end, the loss rate, L{sub i}, can be set as the source rate, which is the unity. Thus, in MCNP5, k{sub i} is simply calculated with P{sub i} by using three conventional estimators; collision, absorption, and track-length estimators. In domain decomposed MC criticality calculations based on the fission and surface source (FSS) iteration method, k{sub i} is calculated by a ratio of P{sub i} and L{sub i}, where both P{sub i} and L{sub i} are random variables, sampled by using the same particle histories. When the numerator and the denominator are correlated, the variance of the ratio can be smaller than that of the numerator. Then, the final estimate of k{sub eff} is provided as the sample mean of k{sub i}, which will be referred as 'simple' ratio estimator in this paper. In Ref., it is shown that this ratio estimator converges faster and fluctuates less than the conventional estimator. A similar ratio estimator is also used in Serpent 2, as an implicit estimate of k{sub eff}. However, this type of 'simple' ratio estimator is biased, which means that the expectation of the ratio is different from the ratio of the expectation of the numerator and that of the denominator. In this paper, an unbiased ratio estimator which was originally derived in the cytometry analysis is introduced to estimate k{sub eff} and is tested on a continuous-energy UO{sub 2} pin-cell problem. In this test problem, it is shown that the variance of the unbiased ratio estimator is smaller than those of the conventional estimators provided by MCNP5, while the simple ratio estimator can be significantly biased when the number of histories per cycle is too small. (authors)
Hydraulic conductivities of volcanic and carbonate lithologic units at the Nevada Test Site were estimated from flow logs and aquifer-test data. Borehole flow and drawdown were integrated and interpreted using a radial, axisymmetric flow model, AnalyzeHOLE. This integrated approach is used because complex well completions and heterogeneous aquifers and confining units produce vertical flow in the annular space and aquifers adjacent to the wellbore. AnalyzeHOLE simulates vertical flow, in addition to horizontal flow, which accounts for converging flow toward screen ends and diverging flow toward transmissive intervals. Simulated aquifers and confining units uniformly are subdivided by depth into intervals in which the hydraulic conductivity is estimated with the Parameter ESTimation (PEST) software. Between 50 and 150 hydraulic-conductivity parameters were estimated by minimizing weighted differences between simulated and measured flow and drawdown. Transmissivity estimates from single-well or multiple-well aquifer tests were used to constrain estimates of hydraulic conductivity. The distribution of hydraulic conductivity within each lithology had a minimum variance because estimates were constrained with Tikhonov regularization. AnalyzeHOLE simulated hydraulic-conductivity estimates for lithologic units across screened and cased intervals are as much as 100 times less than those estimated using proportional flow-log analyses applied across screened intervals only. Smaller estimates of hydraulic conductivity for individual lithologic units are simulated because sections of the unit behind cased intervals of the wellbore are not assumed to be impermeable, and therefore, can contribute flow to the wellbore. Simulated hydraulic-conductivity estimates vary by more than three orders of magnitude across a lithologic unit, indicating a high degree of heterogeneity in volcanic and carbonate-rock units. The higher water transmitting potential of carbonate-rock units relative to volcanic-rock units is exemplified by the large difference in their estimated maximum hydraulic conductivity; 4,000 and 400 feet per day, respectively. Simulated minimum estimates of hydraulic conductivity are inexact and represent the lower detection limit of the method. Minimum thicknesses of lithologic intervals also were defined for comparing AnalyzeHOLE results to hydraulic properties in regional ground-water flow models.
Soils and other unconsolidated deposits in the northern circumpolar permafrost region store large amounts of soil organic carbon (SOC). This SOC is potentially vulnerable to remobilization following soil warming and permafrost thaw, but SOC stock estimates were poorly constrained and quantitative error estimates were lacking. This study presents revised estimates of permafrost SOC stocks, including quantitative uncertainty estimates, in the 0–3 m depth range in soils as well as for sediments deeper than 3 m in deltaic deposits of major rivers and in the Yedoma region of Siberia and Alaska. Revised estimates are based on significantly larger databases compared to previous studies. Despite this there is evidence of significant remaining regional data gaps. Estimates remain particularly poorly constrained for soils in the High Arctic region and physiographic regions with thin sedimentary overburden (mountains, highlands and plateaus) as well as for deposits below 3 m depth in deltas and the Yedoma region. While some components of the revised SOC stocks are similar in magnitude to those previously reported for this region, there are substantial differences in other components, including the fraction of perennially frozen SOC. Upscaled based on regional soil maps, estimated permafrost region SOC stocks are 217 ± 12 and 472 ± 27 Pg for the 0–0.3 and 0–1 m soil depths, respectively (±95% confidence intervals). Storage of SOC in 0–3 m of soils is estimated to 1035 ± 150 Pg. Of this, 34 ± 16 Pg C is stored in poorly developed soils of the High Arctic. Based on generalized calculations, storage of SOC below 3 m of surface soils in deltaic alluvium of major Arctic rivers is estimated as 91 ± 52 Pg. In the Yedoma region, estimated SOC stocks below 3 m depth are 181 ± 54 Pg, of which 74 ± 20 Pg is stored in intact Yedoma (late Pleistocene ice- and organic-rich silty sediments) with the remainder in refrozen thermokarst deposits. Total estimated SOC storage for the permafrost region is ∼1300 Pg with an uncertainty range of ∼1100 to 1500 Pg. Of this, ∼500 Pg is in non-permafrost soils, seasonally thawed in the active layer or in deeper taliks, while ∼800 Pg is perennially frozen. In conclusion, this represents a substantial ∼300 Pg lowering of the estimated perennially frozen SOC stock compared to previous estimates.
Using four distinct Monte Carlo estimators for momentum deposition - analog, absorption, collision, and track-length estimators - we compute a combined estimator. In the wide range of problems tested, the combined estimator always has a figure of merit (FOM) equal to or better than the other estimators. In some instances the gain in FOM is only a few percent higher than the FOM of the best solo estimator, the track-length estimator, while in one instance it is better by a factor of 2.5. Over the majority of configurations, the combined estimator's FOM is 10-20% greater than any of the solo estimators FOM. In addition, the numerical results show that the track-length estimator is the most important term in computing the combined estimator, followed far behind by the analog estimator. The absorption and collision estimators make negligible contributions.
Density estimation is critical to effectively manage invasive species and elucidate areas of highest concern. For wild pigs (Sus scrofa), the ability to estimate density is complicated because of their variable home range sizes and social structure. Common methods for estimating density (e.g., mark-recapture) may be unsuitable in management applications because additional data needs to be collected before and after management. Removal models offer a suitable alternative to estimate density changes following management and can be applied broadly across areas where management of wild pigs is ongoing. We collected wild pig removal and camera trap data from 25 private properties ranging in size from approximately 0.5 km 2 to 95 km 2 across 3 ecoregions in South Carolina, USA, from 2020–2023. We compared factors affecting consistency and precision of property-level density estimates between removal and spatial mark-resight (SMR) models. In general, excluding 1 large outlier, density estimates from removal models were between 0.60 and 15.85 wild pigs/km 2 (median = 5.34) with a median coefficient of variation (CV) of 0.76 and 95% confidence intervals for the CV between 0.70 and 0.94. Similarly, excluding 1 large outlier, density estimates from SMR were between 0.22 and 30.97 wild pigs/km 2 (median = 5.48) with a median CV of 0.39 and 95% confidence intervals for the CV between 0.38 and 1.20. We found the precision of removal models was affected primarily by the number of wild pigs dispatched in the removal period (3 months) and the ecoregion in which they were removed. None of the covariates, including the number of recaptures (a corresponding measure of sample size), influenced precision of the SMR models, although recaptures did influence the density estimates. At the individual property level, density estimates from our 2 estimators were dissimilar from each other in approximately 80% of instances, although none of the covariates we examined influenced dissimilarity. Our results provide unique insight into how sample size affects density estimates using 2 common methods and into novel SMR models that incorporate both marked and unmarked detections. In addition, the density estimates in this study can be used as a reference for wild pig densities in common land cover types throughout the southeastern United States.