Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “efficient infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless

While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $\$$4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARM Standards Policy Committee Report

Data and metadata standards promote the consistent recording of information and are necessary to ensure the stability and high quality of Atmospheric Radiation Measurement (ARM) Climate Research Facility data products for scientific users. Standards also enable automated routines to be developed to examine data, which leads to more efficient operations and assessment of data quality. Although ARM Infrastructure agrees on the utility of data and metadata standards, there is significant confusion over the existing standards and the process for allowing the release of new data products with exceptions to the standards. The ARM Standards Policy Committee was initiated in March 2012 to develop a set of policies and best practices for ARM data and metadata standards.

54 ENVIRONMENTAL SCIENCES↗

Gulf Coast Clean Energy Application Center

The Gulf Coast Clean Energy Application Center was initiated to significantly improve market and regulatory conditions for the implementation of combined heat and power technologies. The GC CEAC was responsible for the development of CHP in Texas, Louisiana and Oklahoma. Through this program we employed a variety of outreach and education techniques, developed and deployed assessment tools and conducted market assessments. These efforts resulted in the growth of the combined heat and power market in the Gulf Coast region with a realization of more efficient energy generation, reduced emissions and a more resilient infrastructure. Specific t research, we did not formally investigate any techniques with any formal research design or methodology.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Life Cycle Cost Analysis Framework for Geologic Storage of Hydrogen

Large scale geostorage options for fuels including natural gas and petroleum offer substantial buffer capacity to meet or hedge against supply disruptions. This same notion may be applied to large scale hydrogen storage to meet industrial or transportation sector needs. This study develops an assessment tool to calculate the potential ‘gate-to-gate’ life cycle costs for large scale hydrogen geostorage options in salt caverns, and continues to develop modules for depleted oil/gas reservoirs and aquifers. The U.S. Department of Energy has an interest in these types of storage to assess the geological, geomechanical and economic viability for this type of hydrogen storage. Understanding, and looking to quantify, the value of large-scale storage in a larger hydrogen supply and demand infrastructure may prove extremely beneficial for larger infrastructure modeling efforts when looking to identify the most efficient means to fuel a hydrogen demand (e.g., industrial or transportation-centric demand). Drawing from the knowledge gained in the underground large scale storage options for natural gas and petroleum in the U.S., the potential to store relatively large volumes of CO 2 in geological formations, the hydrogen storage assessment modeling will continue to build on these strengths while maintaining modeling transparency such that other modeling efforts may draw from this project.

08 HYDROGEN↗

A Life Cycle Cost Analysis Framework for Geologic Storage of Hydrogen

Large scale geostorage options for fuels including natural gas and petroleum offer substantial buffer capacity to meet or hedge against supply disruptions. This same notion may be applied to large scale hydrogen storage to meet industrial or transportation sector needs. This study develops an assessment tool to calculate the potential ‘gate-to-gate’ life cycle costs for large scale hydrogen geostorage options in salt caverns, and continues to develop modules for depleted oil/gas reservoirs and aquifers. The U.S. Department of Energy has an interest in these types of storage to assess the geological, geomechanical and economic viability for this type of hydrogen storage. Understanding, and looking to quantify, the value of large-scale storage in a larger hydrogen supply and demand infrastructure may prove extremely beneficial for larger infrastructure modeling efforts when looking to identify the most efficient means to fuel a hydrogen demand (e.g., industrial or transportation-centric demand). Drawing from the knowledge gained in the underground large scale storage options for natural gas and petroleum in the U.S., the potential to store relatively large volumes of CO 2 in geological formations, the hydrogen storage assessment modeling will continue to build on these strengths while maintaining modeling transparency such that other modeling efforts may draw from this project.

08 HYDROGEN↗

State Engagement in Electric Distribution System Planning

Electric distribution system planning is focused on assessing needed physical and operational changes to the local grid to maintain safe, reliable, and affordable service. While electric utilities have always engaged in this activity, the planning horizon has typically been short and involvement by state utility regulators minimal. Safety, reliability, and affordability remain top objectives for deeper state engagement in longer-term distribution system planning. Other drivers are proposed utility investments to replace aging infrastructure and modernize grids, opportunities to improve distribution system efficiency, enabling consumers to have greater control over energy costs and sources, and integrating higher levels of distributed energy resources (DERs) such as rooftop solar, distributed energy storage, and price-responsive demand. This report provides a snapshot of current state engagement in distribution system planning: •Part 1 describes activities in states that have adopted some elements of integrated distribution system planning and analysis (see Figure 1): New York, California, Hawaii, Massachusetts, and Minnesota. It summarizes their impetus for early action, stated goals, regulatory requirements, additional state activities related to distribution system planning, and next steps. •Part 2 covers a broader array of state approaches throughout the country. For example, some of these states have long-standing distribution reliability and performance codes, requiring regulated utilities to report regularly on poor-performing circuits and propose investments for improvements. Other states require regulated utilities to make filings related to proposed grid modernization investments. A growing number of states are beginning to consider comprehensive distribution system planning processes. As this report highlights, approaches vary significantly from state to state, in part stemming from differences in electricity market structure. States can learn from each other and tailor successful approaches to their unique circumstances. Reviewing the broad range of legislative and public utility commission activities described in this report is a useful starting point.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Observational Understanding of Connected Lighting Systems

As part of the Internet of Things (IoT), connected lighting systems provide additional control capabilities and nonlighting-related services (such as communications and data infrastructure) to reduce energy use while increasing both application efficiency and system value. But the positive or negative energy impact of implementing these systems is still largely unknown due to the variety of human factors associated with installation, maintenance, and use. These complications interfere with adoption and acceptance rates of products that will play a significant role in achieving energy savings long-term. Next Generation Lighting Systems, or NGLS, developed and implemented an observational research methodology for connected lighting systems. The methodology was implemented at an indoor (classroom/office) Living Lab at Parsons School of Design in New York City, and an outdoor (parking lot) Living Lab at Virginia Tech Transportation Institute in Blacksburg, Virginia. Although this report focuses on the approach to indoor installations, observational research in both settings provides insight to the type, scale, and frequency of issues across available products as experienced by installing contractors, end users, and other stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Resilient Communities, Maryland (RCM): A Framework for Community-Driven Energy Resilience (Final Technical Report)

The Resilient Communities, Maryland (RCM) project integrates community-based participatory research (CBPR) approaches into energy resilience planning. The combination of qualitative, community-driven data and quantitative utility data improves both the effectiveness and efficiency of assessing the impacts of disruptions to energy infrastructure. Centered around a metric of critical services access, RCM created a repeatable framework for evaluating and modeling energy resilience in communities and promoted community engagement, resulting in more equitable stakeholder participation and improved decision-making processes for siting infrastructure to improve community energy resilience.

14 SOLAR ENERGY↗

Idaho National Laboratory Ten-year Site Plan (2012 through 2021) -- DOE-NE's National Nuclear Capability -- Developing and Maintaining the INL Infrastructure

To meet long-term objectives to transform the Idaho National Laboratory (INL), we are providing an integrated, long-term vision of infrastructure requirements that support research, development and demonstration (RD&D) goals outlined in the DOE strategic plans, including the NE Roadmap and reports such as Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook. The goal of the INL Ten-year Site Plan (TYSP) is to clearly link RD&D mission goals and INL core capabilities with infrastructure requirements (single and multi-program), establish the 10-year end-state vision for INL complexes, identify and prioritize infrastructure and capability gaps, as well as the most efficient and economic approaches to closing those gaps.

99 GENERAL AND MISCELLANEOUS↗

Improving the Concrete Crack Detection Process via a Hybrid Visual Transformer Algorithm

Inspections of concrete bridges across the United States represent a significant commitment of resources, given their biannual mandate for many structures. With a notable number of aging bridges, there is an imperative need to enhance the efficiency of these inspections. This study harnessed the power of computer vision to streamline the inspection process. Our experiment examined the efficacy of a state-of-the-art Visual Transformer (ViT) model combined with distinct image enhancement detector algorithms. We benchmarked against a deep learning Convolutional Neural Network (CNN) model. These models were applied to over 20,000 high-quality images from the Concrete Images for Classification dataset. Traditional crack detection methods often fall short due to their heavy reliance on time and resources. This research pioneers bridge inspection by integrating ViT with diverse image enhancement detectors, significantly improving concrete crack detection accuracy. Notably, a custom-built CNN achieves over 99% accuracy with substantially lower training time than ViT, making it an efficient solution for enhancing safety and resource conservation in infrastructure management. These advancements enhance safety by enabling reliable detection and timely maintenance, but they also align with Industry 4.0 objectives, automating manual inspections, reducing costs, and advancing technological integration in public infrastructure management.

42 ENGINEERING↗

Evaluating the Maturity of Cybersecurity Programs for Building Control Systems

The cyber-physical security threat to buildings is complex, non-linear, and rapidly evolving as operational and information technologies converge and connect buildings to cyberspace. Cyberattacks on buildings can exploit smart building controls and breach corporate networks, causing financial and reputational damage. This may result in the loss of sensitive building information or the disruption of, or damage to, the systems necessary for the safe and efficient operation of buildings. For the buildings and facility infrastructure, there is a need for a robust national cybersecurity strategy for buildings, guidance on the selection and implementation of appropriate cybersecurity controls for buildings, an approach to evaluate the maturity and adequacy of the cybersecurity programs. To provide an approach for evaluating the maturity of the cybersecurity programs for building control systems, the US Department of Energy’s widely used Cybersecurity Capability and Maturity Model (C2M2) has been adapted into a building control systems version. The revised model, the Buildings-C2M2 (B-C2M2) provides maturity level indicators for cybersecurity programmatic domains. A “B-C2M2 Lite” version allows facility managers and building control system engineers, or information technology personnel to perform rapid self-assessments of their cybersecurity program. Both tools have been pilot tested on several facilities. This paper outlines the concept of a maturity model, describes the B-C2M2 tools, presents results and observations from the pilot assessments, and lays out plans for future work.

Glantz, Clifford S.↗

Meeting Hanford's Infrastructure Requirements - 12505

Hanford, by all accounts, is an enormous and complex project, with thousands of disparate, but co-mingled activities in motion on any given day. The primary target of the mission at Hanford is cleanup of the 586 square-mile site, but there is the equally vital mission of site services and infrastructure. Without functions like the well-maintained site roads, electricity, water, and emergency management services, not a single cleanup project could be undertaken. As the cleanup projects evolve - with new work-scope emerging, while existing projects are completed - there becomes a very real need to keep projects integrated and working to the same 'blueprint'. And the Hanford blueprint extends for years and includes myriad variables that come with meeting the challenges and complexities associated with Hanford cleanup. Because of an innovative and unique contracting strategy, the Department of Energy (DOE) found a way to keep the cleanup projects un-encumbered from the side task of having to self-provide their individual essential site services, thus allowing the cleanup contractors to concentrate their efforts on their primary mission of cleaning up the site. These infrastructure and support services also need to be provided efficiently and cost effectively - done primarily through 'right-sizing' efforts. The real innovation came when DOE had the foresight to include a second provision in this contract which specifically asked for a specialized role of site integrator and innovator, with a special emphasis placed on providing substantial cost savings for the government. The need for a true site integrator function was necessitated by the ever-increasing complexity of projects at Hanford and the progression of cleanup at others. At present, there are two main DOE offices overseeing the cleanup work and six primary contractors performing that work. Each of these contractors works to separate schedules and cleanup milestones, and the nature of the cleanup differs, but all are intertwined in their need for essential site services. One of the key tasks spelled out in the Mission Support Contract (MSC) is to take the volumes of cost, schedule and budget forecasting data each contractor is responsible for and consolidate that data into a 'one Hanford' perspective, with a clear and well-defined 'map' of the future, taking into account the many cross-cutting priorities at the site. This function is termed 'portfolio management' in the MSC. In 2009, the DOE awarded the MSC to Mission Support Alliance, LLC. (MSA), a team made up of industry leaders with key government services credentials, Lockheed Martin, Jacobs Engineering and WSI. Now into its third year managing the contract, MSA has continually shown tangible results in its oversight of the MSC. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring impacts of electricity tariff on charging infrastructure planning: An activity-based approach

In the past decade, electric vehicles (EVs) have gained popularity for their efficiency and environmental benefits. Advances in battery technology and charging equipment have yielded long-range EVs and fast-charging. However, many major cities lack adequate charging infrastructure for daily EV use. This study addresses this gap by integrating activity-based modeling, charging behavior simulation, and charging infrastructure optimization. The research utilizes the POLARIS agent-based transportation model to accurately capture user activities, trip patterns, and traffic flows. Additionally, the study investigates the impact of fixed and spatiotemporal electricity rate distributions on optimal charging infrastructure deployment. The framework is applied to the Chicago regional area network and analyzed under various EV ownership scenarios. Further, the results reveal significant impacts of the charging pricing strategy on user decision-making and charging demand distribution. There is also a need for consistent pricing policies in charging infrastructure planning and operational phases to avoid drops in service quality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Gradient boosting machine for modeling the energy consumption of commercial buildings

Accurate savings estimations are important to promote energy efficiency projects and demonstrate their cost-effectiveness. The increasing presence of advanced metering infrastructure (AMI) in commercial buildings has resulted in a rising availability of high frequency interval data. These data can be used for a variety of energy efficiency applications such as demand response, fault detection and diagnosis, and heating, ventilation, and air conditioning (HVAC) optimization. This large amount of data has also opened the door to the use of advanced statistical learning models, which hold promise for providing accurate building baseline energy consumption predictions, and thus accurate saving estimations. The gradient boosting machine is a powerful machine learning algorithm that is gaining considerable traction in a wide range of data driven applications, such as ecology, computer vision, and biology. In the present work an energy consumption baseline modeling method based on a gradient boosting machine was proposed. To assess the performance of this method, a recently published testing procedure was used on a large dataset of 410 commercial buildings. The model training periods were varied and several prediction accuracy metrics were used to evaluate the model's performance. The results show that using the gradient boosting machine model improved the R-squared prediction accuracy and the CV(RMSE) in more than 80 percent of the cases, when compared to an industry best practice model that is based on piecewise linear regression, and to a random forest algorithm.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulation-Guided Decision-Making for Enhancing Energy Resilience in a Remote Alaskan Community

The increasing frequency and severity of extreme weather events underscore the need to bolster the resilience of energy infrastructure in remote coastal communities exposed to climate hazards. In recent years, considerable effort has been made to harden the grid infrastructure of remote communities through investment in energy storage, advanced metering, renewable generation and energy-efficient loads. However, simulation-based studies are still needed to identify appropriate locations for investment and determine the adequacy of existing infrastructure in supporting new resources. Preparing the required models may often be challenging due to insufficient metering, disparate data sources and workforce limitations. This paper describes modeling efforts undertaken to represent, within a unified co-simulation platform: (a) the electric distribution network and (b) the thermal behavior of a community medical center, in the remote community of Cordova, Alaska. With the help of case-studies, it is shown how the developed simulation platform can help the local utility in making decisions regarding capital investment aimed at enhancing community resilience.

Microgrid, energy storage, resilience↗

Operational experience with the CDF Run II Silicon Detector

The CDF Run II Silicon Detector is the largest operating silicon detector in High Energy Physics. Its 722,000 channels spread over 7 m{sup 2} of silicon micro-strip sensors allow precision tracking and vertexing. The CDF silicon detector played a critical role in the discovery of B{sub s} mixing and is used extensively for the current Higgs Boson searches. Over the last 7 years, the detector efficiency has remained stable at 95% after the Run II commissioning period. The infrastructure (cooling, power supplies) problems dealt with are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗