US Veteran Gets a Facelift
Idaho National Laboratory's Advanced Test Reactor (ATR) has received replacement instrumentation and control systems - the process distributed control system (DCS) and the console display system (CDS), which included a replacement annunciator subsystem. The new systems offer the latest software and technology advancements, ensuring the availability of the reactor for future energy research. ATR, a pressurized, light water moderated 250 MW materials test reactor, became operational in 1965. In the early 1990s, after nearly thirty years of analogue/pneumatic controls, the laboratory upgraded ATR to digital-based instrumentation and control systems. By 2007, the equipment and technology used in these digital systems were reaching the end of their lifecycle. The systems component failure rates were on a rise, while vendor support and parts availability were declining. With current projections and plans for operating ATR into 2040, modernization of the reactor's infrastructure is necessary to maintain reliability and efficiency. As a result, the Idaho National Laboratory and the U.S. Department of Energy (DOE) invested more than $13 million in a four-year project to replace ATR's instrumentation and control systems.