Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “defense strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

309 records · Page 18

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam. Thirty potential antifoams were tested as part of this study. A series of tests were developed to help screen out ineffective alternatives including: 1. Spreading testing of superspreaders, 2. Foam column testing with physical simulants, 3. Boiling testing with physical and chemical simulants, 4. Days-only Sludge Receipt and Adjustment Tank (SRAT) process simulations with sludge (containing noble metals and mercury), Precipitate Reactor Feed Tank (PRFT), and Slurry Mix Evaporator Feed Tank (SEFT) simulants in the RC1 Reaction Calorimeter (purchased for antifoam testing), and 5. Around-the-clock SRAT and Slurry Mix Evaporator (SME) process simulations with sludge(containing noble metals and mercury), PRFT, and SEFT simulants in the RC1 Reaction Calorimeter. Evonik Surfynol® MD20, a commercially available defoamer, was relatively effective in controlling foam, while remaining chemically stable in SRAT and SME processing across the pH range of 4 to 13. No degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. In nitric-glycolic acid flowsheet testing, 250 mg/kg Evonik Surfynol® MD20 was needed for foam control compared to 1,625 mg/kg for Antifoam 747, DWPF’s current antifoam. In nitric-formic acid flowsheet testing, 1,125 mg/kg of Evonik Surfynol® MD20 was needed to control foam throughout the SRAT and SME cycles. The commercially available superspreader Momentive™ Y-17112 was even more effective than Evonik Surfynol® MD20 as both a defoamer and an antifoam. Not only was the foam destroyed upon addition but also was less persistent between additions. It was the most effective antifoam in testing using both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. In nitric-glycolic acid flowsheet testing, only 100 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. In nitric-formic acid flowsheet testing, 300 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. Momentive™ Y-17112 is also resistant to hydrolysis as demonstrated by its chemical stability in SRAT and SME processing across the pH range of 4 to 13 and lack of degradation products in offgas or condensate. Both candidates were effective as potential replacements for Antifoam 747, with Y-17112 demonstrating superior foam control. During nitric-glycolic flowsheet testing 50% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. During nitric-formic flowsheet testing 75% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. Foam remediated with Momentive™ Y-17112 was less persistent throughout testing. In addition, no degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. Based on this testing, Momentive™ Y-17112 is clearly superior to Evonik Surfynol® MD20 and Antifoam 747, especially for the nitric-formic acid flowsheet processing; it is recommended that Momentive™ Y-17112 replace Antifoam 747 in DWPF. An antifoam addition strategy is recommended for both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. Implementation of Momentive™ Y-17112 is expected to decrease SRAT and SME boiling times by up to 50%, eliminate the issues resulting from Antifoam 747 degradation products, and minimize foamovers. To validate the effectiveness of these defoaming agents, SRNL recommends irradiation of a SRAT or SME product simulant containing fresh antifoam. The goal of this testing is to determine whether the irradiation causes decomposition of the antifoam that would make it less effective or produce new species in the offgas or slurry. This testing began in April 2020. An evaluation should be completed to determine the thermolytic hydrogen and methane generation rate in downstream equipment, including the High-Level Waste evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NLR CSP Optical Facilities: Illuminating the Path Forward Through Innovation and Impact: Agreement 38490

This initiative is a multi-faceted project at the National Laboratory of the Rockies (NLR) aimed at strengthening its Concentrating Solar Power (CSP) Optical Facilities to advance the development of low-cost, high-performance materials for solar and other applications. The project's strategy is built on three pillars: strategic stakeholder engagement, diligent facility maintenance and utilization, and the development of new research capabilities. The overarching goal is to ensure the facilities remain state-of-the-art resources for industry and academia, thereby accelerating the conversion of concentrated sunlight into energy. A key driver of the project is an international Advisory Board, which provides critical guidance on research priorities and industry needs, leading to new collaborations and secured funding. This external engagement, combined with proactive outreach to industry partners, ensures the lab's work remains aligned with real-world challenges, including materials durability and performance certification. Significant efforts in facility maintenance have addressed challenges with aging infrastructure. Notable achievements include the complete refurbishment of the hail-damaged Ultra-Accelerated Weathering System (UAWS) and the successful replacement of a failing 15-year-old Lambda 1050 spectrophotometer with a new-generation model, substantially upgrading material characterization capabilities. These maintenance activities were complemented by achieving a prestigious ISO 9001:2015 certification for the Advanced Optical Materials Labs, formally recognizing the quality and reliability of NLR's measurement capabilities. Despite these successes, challenges remain, including high demand for the High Flux Solar Furnace (HFSF) and intermittent failures of other key instruments. The project has delivered major advancements in research techniques and capabilities. At the Flatirons campus, a new indoor laboratory, was established to house advanced deflectometry and photogrammetry systems for heliostat characterization. For on-sun testing, a novel, actively cooled turning mirror was developed for the HFSF, enabling more realistic testing of particle receivers and components. A collaboration with Virginia Tech successfully demonstrated the high-temperature durability of a new solar absorber coating through extensive cyclic testing. Concurrently, new modeling took place to better predict material degradation on rough, fractal surfaces. In summary, this project has systematically enhanced NLR's CSP Optical Facilities through strategic upgrades, rigorous maintenance, and stakeholder-guided research. By overcoming equipment failures, budgetary constraints, and logistical hurdles, the project has reinforced NLR's role as a central hub for CSP innovation and materials testing. Future work will focus on securing diverse funding, expanding collaborations, and continuing to provide the critical infrastructure needed to accelerate the development and deployment of next-generation technologies.

14 SOLAR ENERGY↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗