Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Framework for Architecture Trade Study Using MBSE and Performance Simulation

Increasing complexity in modern systems as well as cost and schedule constraints require a new paradigm of system engineering to fulfill stakeholder needs. Challenges facing efficient trade studies include poor tool interoperability, lack of simulation coordination (design parameters) and requirements flowdown. A recent trend toward Model Based System Engineering (MBSE) includes flexible architecture definition, program documentation, requirements traceability and system engineering reuse. As a new domain MBSE still lacks governing standards and commonly accepted frameworks. This paper proposes a framework for efficient architecture definition using MBSE in conjunction with Domain Specific simulation to evaluate trade studies. A general framework is provided followed with a specific example including a method for designing a trade study, defining candidate architectures, planning simulations to fulfill requirements and finally a weighted decision analysis to optimize system objectives.

Ryan, Jessica↗

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

Future SAR Imaging Systems: Goals, Plans, Challenges and Opportunities

Synthetic Aperture Radar (SAR) Earth observation data are becoming increasingly ubiquitous as new spaceborne systems become operational and their data are made available to scientists and applications users. The characteristic of active sensors like SAR to be able to observe Earth independent of weather or solar illumination, coupled with regular data acquisition, fosters reliability and encourages the investment in algorithm and product development toward a beneficial result. As SAR systems typically contain proprietary or nationally important technologies, civilian SAR systems are typically developed with a national focus, or in the case of the European Union, with the Union’s focus. As a result, when viewed from a global perspective, SAR programs can be generally viewed as independent developments, each with their own requirements, schedules, development approaches, and data policies. At the same time, these systems can be expensive, and particularly in an era of increasingly open data policies, coordination of programs could reduce redundancy in observations, increase sampling density and measurement diversity, and improve dependability of data streams in the long term. Since 2018, agency representatives from NASA, ESA, DLR, JAXA, ISRO, ASI, and CONAE have been evaluating the possibilities for programmatic and technical coordination of future SAR systems, data sharing, and scientific exploitation. In this paper, we describe the work in discovering trends and possibilities associated with flight systems, by evaluating current and future plans for SAR systems around the world, and identifying opportunities for coordination.

Zink, Manfred↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Scheduling Architecture for Multi-Center Time-Based Metering

The Traffic Management Advisor (TMA) is an air traffic control automation system currently in use in seven Air Route Traffic Control Centers (ARTCCs) to enable time based metering to busy airports within their airspace. However, this system is limited to operation within a single ARTCC, within about a 200 nautical mile radius of the airport, and on relatively simple streams of traffic. The need for coordinated metering within a greater (300+ nautical mile) radius of an airport, on streams of traffic with significant branching, and across ARTCC boundaries, has been identified. Early tests revealed that TMA could not simply be scaled up to handle such a problem. Instead, a loosely coupled hierarchy of schedules, in which constraints from downstream schedules are passed upstream, is required. Such an architecture reduces the reliance on distant projections of arrival times, making schedules robust to changes in sequence and to additions of aircraft (such as aircraft departing inside the system s scheduling horizon). This architecture is also scaleable, easily reconfigurable, and can be networked together. As such, it can be adapted for use in any size or configuration of airspace and with any number of airports delivering restrictions. An implementation of this distributed scheduling architecture is currently undergoing testing in the TMA-Multi Center system. This paper describes the architecture and its motivation.

Landry, Steven↗

Cognitive Communications for NASA Space Systems

The growing complexity of spacecraft constellations, communication relay offerings, and mission architectures drives the need for the development of autonomous communication systems. NASA has traditionally launched single spacecraft missions that are served by the Space Communication and Navigation (SCaN) program. Operations on SCaN networks are typically scheduled weeks in advance, and often each asset serves a single user spacecraft at a time. Recent movement towards swarm missions could make the current approach unsustainable. Additionally, the integration of commercial communication service providers will substantially increase the data transfer options available to new missions. NASA science missions have found benefit in launching swarms of spacecraft, allowing coordinated simultaneous observations from different perspectives. Inter-spacecraft communication (mesh networking) is an enabler for this architecture, as are CubeSats that allow cost-effective provisioning of distributed mission assets. As more complex swarm missions launch, one challenge is coordinating communication within the swarm and choosing the appropriate mechanism for telemetry, tracking, control, and data services to and from Earth. Cognitive communications research conducted by SCaN aims to mitigate the increasing communication complexity for mission users by increasing the autonomy of links, networks, and service scheduling. By considering automation techniques including recent advances in artificial intelligence and machine learning, cognitive algorithms and related approaches enable increased mission science return, improved resource utilization for service provider networks, and resiliency in unpredictable or unplanned environments. The Cognitive Communications Project at the NASA Glenn Research Center develops applications of data-driven, non-deterministic methods to improve the autonomy of space communication. The project emphasizes development of decentralized space networks with artificial intelligence agents optimizing communication link throughput, data routing, and system-wide asset management. This paper discusses the objectives, approaches, and opportunities of the research to address growing needs of the space communications community.

Chelmins, David↗

Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

Development of a Route Crossing Tool for Shared Airspace Environments

In current-day Terminal Radar Approach Control (TRACON) operations, departure and arrival controllers maintain separate and dedicated airspace for their respective traffic flows. Although this practice has obvious safety features, it also leads to inefficiencies; for example, departure aircraft may be routinely capped beneath arrival airspace. With the right decision-support and coordination tools, departures could continue to climb through arrival airspace when sufficient gaps exist. Previous studies of ‘shared airspace’ have examined pre-arranged coordination procedures, as well as tools that gave feedback to the controllers on where gaps between arrivals were located and whether the departure aircraft could be scheduled to fly through those gaps [1, 2, 3, 4]. Since then, the Route Crossing Tool (RCT) has been developed to allow controllers to assess multiple pre-defined route options at points where the arrivals and departures cross, thereby increasing the possibility of climbing a departure through an arrival gap.The RCT aids in ensuring lateral separation between departure and arrival aircraft that pass through the same altitude. Since the RCT can be applied tactically, it can enable aircraft to fly through arrival flows even if these aircraft depart outside scheduled times. The RCT makes use of a set of predefined parallel departure routes crossing the arrival flow at equidistant intersecting points on the arrival route. The RCT uses the Estimated Time of Arrival (ETA) of the departure aircraft at each intersecting point to calculate the lateral separation with the neighboring arrivals when it crosses that point; this information is graphically displayed to the controller. Additionally, the RCT incorporates forecast winds in its ETA predictions.Multiple prototypes of the RCT have been iteratively developed with feedback from Subject Matter Experts (SMEs). This paper presents the final design, the design process, and lessons learned. Initial results from a simulation suggest that the tool was successful in helping controllers to safely climb more aircraft. Controller feedback on the tool was also positive.

shared airspace↗

The NCRC Grid Scheduling Environment

In support of the NCRC, a joint computing center between NOAA and ORNL, a grid-based scheduling infrastructure was designed to allow geographically separate computing resources to be used as production resources in climate and weather research workflows. These workflows require job coordination between the two centers in order to provide a complete workflow of data staging, computation, post-analysis and archival. This paper details the design, implementation and initial production phase of the infrastructure and lessons learned from the process.

99 GENERAL AND MISCELLANEOUS↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Onboard planning for geological investigations using a rover team

This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The Multi-Rover Integrated Science Understanding System (MISUS) combines techniques from planning and scheduling with machine learning to perform autonomous scientific exploration with cooperating rovers.

scheduling↗

A Sparse Tensor Benchmark Suite for CPUs and GPUs

Tensor computations present significant performance chal- lenges that impact a wide spectrum of applications ranging from machine learning, healthcare analytics, social network analysis, data mining to quantum chemistry and signal processing. Efforts to improve the perfor- mance of tensor computations include exploring data layout, execution scheduling, and parallelism in common tensor kernels. This work presents a benchmark suite for arbitrary-order sparse tensor kernels using state- of-the-art tensor formats: coordinate (COO) and hierarchical coordinate (HiCOO) on CPUs and GPUs. It presents a set of reference tensor kernel implementations that are compatible with real-world tensors and power law tensors extended from synthetic graph generation techniques. We also propose Roofline performance models for these kernels to provide insights of computer platforms from sparse tensor view. This benchmark suite along with the synthetic tensor generator is publicly available.

Li, Jiajia↗

Streamlining Collaborative Planning in Spacecraft Mission Architectures

During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions

Misra, Dhariti↗

Optimal Integration of Departure and Arrivals in Terminal Airspace

Coordination of operations with spatially and temporally shared resources such as route segments, fixes, and runways improves the efficiency of terminal airspace management. Problems in this category include scheduling and routing, thus they are normally difficult to solve compared with pure scheduling problems. In order to reduce the computational time, a fast time algorithm formulation using a non-dominated sorting genetic algorithm (NSGA) was introduced in this work and applied to a test case based on existing literature. The experiment showed that new method can solve the whole problem in fast time instead of solving sub-problems sequentially with a window technique. The results showed a 60% or 406 second delay reduction was achieved by sharing departure fixes (more details on the comparison with MILP results will be presented in the final paper). Furthermore, the NSGA algorithm was applied to a problem in LAX terminal airspace, where interactions between 28% of LAX arrivals and 10% of LAX departures are resolved by spatial segregation, which may introduce unnecessary delays. In this work, spatial segregation, temporal segregation, and hybrid segregation were formulated using the new algorithm. Results showed that spatial and temporal segregation approaches achieved similar delay. Hybrid segregation introduced much less delay than the other two approaches. For a total of 9 interacting departures and arrivals, delay reduction varied from 4 minutes to 6.4 minutes corresponding flight time uncertainty from 0 to 60 seconds. Considering the amount of flights that could be affected, total annual savings with hybrid segregation would be significant.

high density terminal↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control

Distributed energy resources (DERs) are becoming an important part of distribution systems, because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the electric power system, they have the potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Extensible, Asynchronous Task Scheduling (FEATS) in Fortran

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP, explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI), or compiler-specific language extensions such as those provided by CUDA. By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models. Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data-parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. The paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task-scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

Richardson, Brad↗

Framework for Extensible, Asynchronous Task Scheduling (FEATS) in Fortran

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP, explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI), or compiler-specific language extensions such as those provided by CUDA. By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models. Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data-parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. The paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task-scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

Modern Fortran↗