Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “control room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

In-vessel visible inspection system on KSTAR

To monitor the global formation of the initial plasma and damage to the internal structures of the vacuum vessel, an in-vessel visible inspection system has been installed and operated on the Korean superconducting tokamak advanced research (KSTAR) device. It consists of four inspection illuminators and two visible/H-alpha TV cameras. Each illuminator uses four 150 W metal-halide lamps with separate lamp controllers, and programmable progressive scan charge-coupled device cameras with 1004x1004 resolution at 48 frames/s and a resolution of 640x480 at 210 frames/s are used to capture images. In order to provide vessel inspection capability under any operation condition, the lamps and cameras are fully controlled from the main control room and protected by shutters from deposits during plasma operation. In this paper, we describe the design and operation results of the visible inspection system with the images of the KSTAR Ohmic discharges during the first plasma campaign.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Human and Technology Integration Evaluation of Advanced Automation and Data Visualization

While the existing United States (U.S.) light water reactors are highly reliable, safe, and provide a significant proportion of carbon-free electricity, the cost of operating and maintaining them has become less competitive compared to other electricity generating sources. The reason for the gap in operating and maintenance (O&M) costs can be at least in part attributed to the advent of new digital technologies that other electricity generating industries are currently using. Advanced capabilities including digital instrumentation and control (I&C) systems, advanced automation and analytics, and greater span of data integration (i.e., connectedness) across these non-nuclear plants has transformed the way work is performed and ultimately given them a competitive advantage in terms of the cost required for operating, maintaining, and supporting them. To reduce O&M cost and address obsolescence of the aging I&C infrastructure of the existing U.S. light water reactors, the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program Plant Modernization Pathway is conducting targeting multidisciplinary research that 1) delivers a sustainable business model to enable a cost-competitive U.S. nuclear industry and 2) is developing technology modernization solutions that address aging and obsolescence challenges. The work described in this report supports these two objectives and describes the demonstration of human and technology integration across recent industry collaborations to support their large-scale digital I&C modifications. This technical report describes the demonstration of the human and technology integration methodology in performing full-scale performance-based human-in-the-loop tests to evaluate plant-specific advanced automation and data visualization applications within these collaborators’ digital modifications. This technical report also documents future applications of human and technology integration that expand beyond main control room modernization and digital I&C upgrades, which have been a central focus to date. Thus, this technical report discusses how to implement human and technology integration across new business opportunities and how to develop an evaluation plan that defines measures and criteria, and documents key assumptions to support full plant modernization.

99 GENERAL AND MISCELLANEOUS↗

Shielding Design of Gantry 3 - Paper 104

The proton therapy complex at PSI will be extended with a third irradiation facility, Gantry 3. This new Gantry is being built in the south-west area of the experimental hall of the High Intensity Proton Accelerator (HIPA) complex at PSI. Originally, it was planned to restrict the operation of Gantry 3 to 180 deg. by hardware means, but due to new considerations, the Gantry will be able to be moved in the full 360 deg. field. This change requires the redesign and reinforcement of the too weak shielding in the north and east directions. Additionally, the isocenter has been fixed, thus allowing for the exact calculation of distances, angles and effective shielding thicknesses in order to determine the dose rates more accurately. For these calculations a fast and simple semi-empirical analytical formula and the more time consuming, but also more sophisticated best estimate code MCNPX 2.7.0 have been used. The two methods used for the calculations of the dose rates are in good agreement. Generally, the analytical method provides the results instantaneously, but predicts higher dose rate values of a factor 2-3 larger than the Monte-Carlo particle transport code MCNPX. Thus, MCNPX should be used to verify the final design of the shielding, including additional details in the simulation model (e.g. ventilation shafts) which have weakening effect on the shielding. Such influences are hard to quantify analytically. The analytical method fails when the geometry becomes complex, i.e. when it is difficult to determine the effective length of the shielding; in the case of position 10 the shielding effect of the inner wall is difficult to quantify. Due to the change of the specification of the Gantry, the shielding was reinforced at the north and east sides, and the HC-layer was extended in front of the control room. The dose rates are acceptable with the new shielding layout. A detailed dose rate mapping is planned in the commissioning phase of Gantry 3 to verify the simulation results and to identify any remaining weak spots of the shielding. (authors)

43 PARTICLE ACCELERATORS↗

Installation of Computerized Procedure System and Advanced Alarm System in the Human Systems Simulation Laboratory

This report describes the installation of two advanced control room technologies, an advanced alarm system and a computerized procedure system, into the Human Systems Simulation Laboratory (HSSL). Installation of these technologies enables future phases of this research by providing a platform to systematically evaluate the effect of these technologies on operator and plant performance.

60 APPLIED LIFE SCIENCES↗

NETL's IGCC Dynamic Simulator Reserach and Training Center

The National Energy Technology Laboratory (NETL) is collaborating with software, industry, and university partners to establish a world-class Dynamic Simulator Research and Training (DSR&T) Center dedicated to the operation and control of advanced energy plants with carbon capture capabilities. The DSR&T Center will offer a collaborative R&D program and comprehensive hands-on training built around a portfolio of non-proprietary, high-fidelity, real-time dynamic simulators. The simulators will provide full-scope operator training system (OTS) capabilities for normal and faulted operations, as well as plant start-up, shutdown, and load following. Immersive three-dimensional (3-D) virtual reality will add another dimension of realism to the dynamic OTS systems and extend the training scope to both control room and outside operators, allowing them to work as a team. The benefits of high-fidelity immersive training systems (ITS) include more realistic training scenarios, improved communication and collaboration among work crews, off-line evaluations of procedures, and training for safety-critical tasks and rare abnormal situations.

01 COAL, LIGNITE, AND PEAT↗

Installation of a fast framing visible camera on KSTAR

Visible camera technologies have made remarkable progress in recent years, and the fast camera has proven itself to be a capable imaging diagnostic in studies of specific fusion plasma issues such as the start-up physics, plasma wall interactions, edge-localized modes, and disruptions. For the purpose of favorable visible imaging, a fast framing camera has recently been installed on the Korea Superconducting Tokamak Advanced Research (KSTAR) device. The camera uses a complementary metal-oxide semiconductor detector with a maximum resolution of 1280x1024 at 1000 frames/s (fps) and a minimum resolution of 1280x16 at 64 kfps. A 2-m-long viewport having a novel optical rail system was installed on a tangential port to view the tokamak interior. The system is fully controlled from the main control room and protected by a shutter from deposits. To verify that the camera electronics are safe from the high magnetic field and its rapid time variation, possible influences are considered theoretically and experimentally. In this work, we present the design and installation of the fast camera system on the KSTAR device with discussions on the field variation effect issues.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Dynamic State Estimation Utilizing High Performance Computing Methods

The state estimation tools which are currently deployed in power system control rooms are based on a quasi-steady-state assumption. As a result, the suite of operational tools that rely on state estimation results as inputs do not have dynamic information available and their accuracy is compromised. This paper presents an overview of the Kalman Filtering process and then focuses on the implementation of the predication component on multiple processors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report for 2.2.1 Task 4: Software-Based Tools to Support Human-System Evaluation Studies

INL contracted IFE to develop custom software functionality to support INL’s control room simulator data collections. The tool described in this report provides functionality for authoring, managing and executing so-called micro task data collections (Hildebrandt and Eitrheim, 2015), where operators receive a long list of operational tasks, and the speed and accuracy of their response is measured. The tool consists of an editor, player and observer module. This report contains methodological background and a user guide.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Supporting the industry by developing a design guidance for computer-based procedures for field workers - 274

The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human interacts with the procedures, which can be achieved through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools and dynamic step presentation. As a step toward the goal of improving procedure use performance, the U.S. Department of Energy Light Water Reactor Sustainability Program researchers, together with the nuclear industry, have been investigating the feasibility of replacing current paper-based procedures with CBPs. The main purpose of the CBP research for nuclear field workers conducted at the Idaho National Laboratory was to provide design guidance to the nuclear industry to be used by both utilities and vendors. After studying existing design guidance for CBP systems, the researchers concluded that the majority of the existing guidance is intended for control room CBP systems, and does not necessarily address the challenges of designing CBP systems for instructions carried out in the field. Further, the guidance is often presented on a high level, which leaves the designer to interpret what is meant by the guidance and how to specifically implement it. The authors developed a design guidance to provide guidance specifically tailored to instructions that are carried out in the field based. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulation of the Prompt Dose Environment in the NIF during High Yield Shots

The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory is the world's largest and most energetic laser system for inertial confinement fusion. NIF is a 192-laser beam facility, capable of producing 1.8 MJ, 500 TW of ultraviolet light. The main laser systems are installed in two laser bays. Each laser bay delivers 96 beams into one of two switchyards. Sets of turning mirrors in each Switchyard (SY) redirect the beams into the Target Bay (TB). Additional sets of optics in the TB will align and focus the beams onto the target in the center of the Target Chamber (TC). The 192 beams enter the TC through 48 indirect-drive beam ports. Laser beams are then focused to enter a small metal can (hohlraum) held at the center of the TC creating thermal x-rays that heat the surface of the fusion capsule contained within. The Target Bay has a cylindrical design with an inner radius of 15.24 m, 1.83-m-thick concrete walls and 1.37-m-thick concrete roof. A total of 239 and 121 penetrations are present in the Target Bay and switchyard walls, respectively. Figure 1 shows the facility's layout. There are seven floor levels within the TB at elevations of -33'9'', -21'9'', -3'6'', 17'6'', 29'6'', 40'0'', and 50'6'' with respect to the ground level. The TC is positioned in the middle of the TB with its center at elevation of 23'0'' from the ground level. The NIF will routinely utilize deuterium-tritium (D-T) targets with up to 20 MJ yield per shot, and maximum annual yield of 1200 MJ. This summary focuses on analyzing the expected prompt dose environment during the NIF's high yield phase of operations. Previous publications evaluated the expected doses associated with lower yield phases of operation. During shots, the Target Bay, Switchyards, and Laser Bays are interlocked and unoccupied. On the other hand, Personnel can be present inside the Operations Support Building (OSB), the control room, and the visitor center during the shots. The radiation shielding has been optimized to meet the NIF radiological design goals and the Department of Energy (DOE) limits. The goal is to limit the maximum prompt dose in any potentially occupied area to less than 50 {mu}Sv per shot as well as limiting the annual dose to individuals in the occupied areas to less than 1 mSv.

61 RADIATION PROTECTION AND DOSIMETRY↗

BEAM SIMULATIONS USING VIRTUAL DIAGNOSTICS FOR THE DRIVER LINAC

End-to-end beam simulations for the driver linac have shown that the design meets the necessary performance requirements including having adequate transverse and longitudinal acceptances. However, to achieve reliable operational performance, the development of appropriate beam diagnostic systems and control room procedures are crucial. With limited R&D funding, beam simulations provide a cost effective tool to evaluate candidate beam diagnostic systems and to provide a critical basis for developing early commissioning and later operational activities. We propose to perform beam dynamic studies and engineering analyses to define the requisite diagnostic systems of the driver linac and through simulation to develop and test commissioning and operational procedures.

43 PARTICLE ACCELERATORS↗

Alarm rationalization: practical experience rationalizing alarm configuration for an accelerator subsystem

A new alarm system toolkit has been implemented at SNS. The toolkit handles the Central Control Room (CCR) 'annunciator', or audio alarms. For the new alarm system to be effective, the alarms must be meaningful and properly configured. Along with the implementation of the new alarm toolkit, a thorough documentation and rationalization of the alarm configuration is taking place. Requirements and maintenance of a robust alarm configuration have been gathered from system and operations experts. In this paper we present our practical experience with the vacuum system alarm handling configuration of the alarm toolkit.

43 PARTICLE ACCELERATORS↗

Lessons learned enhancing EPICS CA for LANSCE timed and flavored data

A previous paper described an upgrade to EPICS enabling client side tools at LANSCE to receive subscription updates filtered selectively to match a logical configuration of LANSCE beam gates, as configured by the control room. The upgrade required fundamental changes in the EPICS core components. First, the event queue in the EPICS server was upgraded to buffer record (function block) and device specific parameters accessed generically via software interfaces for introspection of 3rd party data. In contrast, event queues in previous versions of EPICS were strictly limited to buffering only value, timestamp, and alarm status tuples. Second, the Channel Access server is being upgraded to filter subscription updates. In this follow on paper some necessary design changes mid-project and the lessons learned during the software development will be described.

43 PARTICLE ACCELERATORS↗

Application of the DG-1199 methodology to the ESBWR and ABWR.

Appendix A-5 of Draft Regulatory Guide DG-1199 'Alternative Radiological Source Term for Evaluating Design Basis Accidents at Nuclear Power Reactors' provides guidance - applicable to RADTRAD MSIV leakage models - for scaling containment aerosol concentration to the expected steam dome concentration in order to preserve the simplified use of the Accident Source Term (AST) in assessing containment performance under assumed design basis accident (DBA) conditions. In this study Economic and Safe Boiling Water Reactor (ESBWR) and Advanced Boiling Water Reactor (ABWR) RADTRAD models are developed using the DG-1199, Appendix A-5 guidance. The models were run using RADTRAD v3.03. Low Population Zone (LPZ), control room (CR), and worst-case 2-hr Exclusion Area Boundary (EAB) doses were calculated and compared to the relevant accident dose criteria in 10 CFR 50.67. For the ESBWR, the dose results were all lower than the MSIV leakage doses calculated by General Electric/Hitachi (GEH) in their licensing technical report. There are no comparable ABWR MSIV leakage doses, however, it should be noted that the ABWR doses are lower than the ESBWR doses. In addition, sensitivity cases were evaluated to ascertain the influence/importance of key input parameters/features of the models.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

First Beam to FACET

The SLAC 3km linear electron accelerator has been reconfigured to provide a beam of electrons to the new Facility for Advanced Accelerator Experimental Tests (FACET) while simultaneously providing an electron beam to the Linac Coherent Light Source (LCLS). On June 23, 2011, the first electron beam was transported through this new facility. Commissioning of FACET is in progress. On June 23, 2011, an electron beam was successfully transported through the new FACET system to a dump in Sector 20 in the linac tunnel. This was achieved while the last third of the linac, operating from the same control room, but with a separate injector system, was providing an electron beam to the Linac Coherent Light Source (LCLS), demonstrating that concurrent operation of the two facilities is practical. With the initial checkout of the new transport line essentially complete, attention is now turning toward compressing the electron bunches longitudinally and focusing them transversely to support a variety of accelerator science experiments.

43 PARTICLE ACCELERATORS↗

Introduction of Diverse Manual Actuation Design for APR1400

APR1400 is an Advanced Light Water Reactor (ALWR) design with enhanced plant safety and advanced design features. One unit is in commercial operation and 11 are currently under construction, 4 abroad and 7 in Korea. APR1400 adopts full digitalized Man-Machine Interface System (MMIS) to perform the function of control, indication and alarming for safety and non-safety systems APR1400 MMIS is designed to operate the plant from the Main Control Room (MCR) under all anticipated operating conditions including design basis accidents. This advanced MMIS is designed to meet the latest codes, standards and regulatory requirements including the defense-in-depth and diversity requirements, which is intended to mitigate the consequence of a total failure of the digital safety system caused by a software Common Cause Failure (CCF) coupled with anyone of the Design Basis Events. The redundancy of the safety system could be defeated during this CCF condition and the protective function could be rendered inoperable.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of the Westinghouse Small Modular Reactor building layout

The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the third in a series of four papers, which describe the design and functionality of the Westinghouse SMR. It focuses in particular upon the plant building layout and modular design of the Westinghouse SMR. In the development of small modular reactors, the building layout is an area where the safety of the plant can be improved by applying new design approaches. This paper will present an overview of the Westinghouse SMR building layout and indicate how the design features improve the safety and robustness of the plant. The Westinghouse SMR is designed with no shared systems between individual reactor units. The main buildings inside the security fence are the nuclear island, the rad-waste building, the annex building, and the turbine building. All safety related equipment is located in the nuclear island, which is a seismic class 1 building. To further enhance the safety and robustness of the design, the reactor, containment, and most of the safety related equipment are located below grade on the nuclear island. This reduces the possibility of severe damage from external threats or natural disasters. Two safety related ultimate heat sink (UHS) water tanks that are used for decay heat removal are located above grade, but are redundant and physically separated as far as possible for improved safety. The reactor and containment vessel are located below grade in the center of the nuclear island. The rad-waste and other radioactive systems are located on the bottom floors to limit the radiation exposure to personnel. The Westinghouse SMR safety trains are completely separated into four unconnected quadrants of the building, with access between quadrants only allowed above grade. This is an improvement to conventional reactor design since it prevents failures of multiple trains during floods or fires and other external events. The main control room is located below grade, with a remote shutdown room in a different quadrant. All defense in depth systems are placed on the nuclear island, primarily above grade, while the safety systems are located on lower floors. The economics of the Westinghouse SMR challenges the established approach of large Light Water Reactors (LWR) that utilized the economies of scale to reach economic competitiveness. To serve the market expectation of smaller capital investment and cost competitive energy, a modular design approach is implemented within the Westinghouse SMR. The Westinghouse SMR building layout integrates the three basic design constraints of modularization; transportation, handling and module-joining technology. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗