Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “containment assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

310 records · Page 18

Full Life-Cycle Defect Management Assessment: Initial Inspection Data Collection Results and Research Questions for Further Study

It is often the case in software projects that when schedule and budget resources are limited, the Verification and Validation (V&V) activities suffer. Fewer V&V activities can be afforded and moreover, short-term challenges can result in V&V activities being scaled back or dropped altogether. As a result, too often the default solution is to save activities for improving software quality until too late in the life-cycle, relying on late-term code inspections followed by thorough testing activities to reduce defect counts to acceptable levels. As many project managers realize, however, this is a resource-intensive way of achieving the required quality for software. The Full Life-cycle Defect Management Assessment Initiative, funded by NASA s Office of Safety and Mission Assurance under the Software Assurance Research Program, aims to address these problems by: Improving the effectiveness of early life-cycle V&V activities to make their benefits more attractive to team leads. Specifically, we focus on software inspection, a proven method that can be applied to any software work product, long before executable code has been developed; Better communicating this effectiveness to software development teams, along with suggestions for parameters to improve in the future to increase effectiveness; Analyzing the impact of early life-cycle V&V on the effectiveness and cost required for late life-cycle V&V activities, such as testing, in order to make the tradeoffs more apparent. This white paper reports on an initial milestone in this work, the development of a preliminary model of inspection effectiveness across multiple NASA Centers. This model contributes toward reaching our project goals by: Allowing an examination of inspection parameters, across different types of projects and different work products, for an analysis of factors that impact defect detection effectiveness. Allowing a comparison of this NASA-specific model to existing recommendations in the literature regarding how to plan effective inspections. Forming a baseline model which can be extended to incorporate factors describing: the numbers and types of defects that are missed by inspections; how such defects flow downstream through software development phases; how effectively they can be caught by testing activities in the late stages of development. The model has been implemented in a prototype web-enabled decision-support tool which allows developers to enter their inspection data and receive feedback based on a comparison against the model. The tool also allows users to access reusable materials (such as checklists) from projects included in the baseline. Both the tool itself and the model underlying it will continue to be extended throughout the remainder of this initiative. As results of analyzing inspection effectiveness for defect containment are determined, they can be shared via the tool and also via updates to existing training courses on metrics and software inspections. Moreover, the tool will help satisfy key CMMI requirements for the NASA Centers, as it will enable NASA to take a global view across peer review results for various types of projects to identify systemic problems. This analysis can result in continuous improvements to the approach to verification.

Shull, Forrest↗

Laboratory-Scale Coal-Derived Graphene Process (Final Report)

The Energy & Environmental Research Center (EERC) conducted a laboratory-scale coal-derived graphene (CDG) project focused on developing a technological process for making graphene from four U.S. domestic coal or coal wastes, including lignite from North Dakota, subbituminous coal from Wyoming, bituminous coal from Utah, and anthracite from Pennsylvania. The project was divided into two performance or budget periods (BPs), with BP1 comprising the up-front laboratory experiments to make graphene materials from coal beginning on May 1, 2020, to April 30, 2022. BP2 was conducted from May 1, 2022, to April 30, 2023, and was focused on analyzing the CDG process economic feasibility and the technical gaps for technological scale-up and commercialization. During this project, a few different coal-derived high-value products have been demonstrated, including graphite, graphene oxide (GO), reduced graphene oxide (rGO), and graphene quantum dots (GQDs). A new graphite microstructure was discovered and named “croissant graphite” because of the exterior morphological and textural resemblance to croissant food items sold in commercial groceries stores. The new graphite structure and the associated preparation from coal or coal waste feedstocks has been the subject of a U.S. patent application. The systematic experimental processes involving coal cleaning, upgrading, and conversion to high-value carbon products culminated into a developed upgraded coal-to-products (UCP) technology that is being pursued for potential fast-track commercialization, if funding is available. It is envisioned that commercialization of the UCP technology would increase consumption of U.S. domestic coals or coal wastes to make environmentally sustainable high-value products for the electronics industry, high-energy-storage applications, and clean energy technologies such as electric vehicle (EV) lithium-ion batteries (LIBs), for which graphite has become a critical mineral commodity. Croissant graphite microstructures, when observed by field emission scanning electron microscopy (FESEM), display wavy surface morphology and often grow from a base that is made of graphitized particles with honeycomb-like layers, which are believed to be graphene layers. While more studies are needed to fully ascertain the mechanisms of the croissant graphite microstructure formation, it is postulated that their growth may begin from curling of the graphene sheets into ribbon-like structures, and continuous growth and densification of the ribbon-like structures forms croissant microstructures. Additional studies are ongoing to evaluate the electrochemical performance of croissant graphite for LIB applications and to determine the experimental conditions necessary to tune on/off croissant formation so that it can be either optimized or suppressed depending on performance evaluation results. In addition to the discovery of croissant graphite, the graphitization process from the four coal ranks in general was successful. X-ray diffraction (XRD) analysis showed that the degree of graphitization (DoG) ranged from 12% to 80% in an early sample set, and further optimization on lignite coal produces a DoG of about 92%, which was spectacular to see as lignite is the lowest-rank coal. Thus, it is expected that the graphitization performance for higher-rank coals will be similar or better when optimized as well. The coal-derived graphite was used to make GO and rGO. Analytical characterization, e.g., by methods such as Raman spectroscopy, XRD, Fourier transform infrared (FTIR) spectroscopy and FESEM, showed that the sequence of converting the coal to graphite, exfoliating it to GO, and then chemically reducing the GO to rGO was successful. Although coal naturally contains aromatic compounds and some relatively small-sized condensed aromatic units, it does not contain graphene sheets. In the UCP process, the aromatic domains in the coals, particularly low-rank coals, are concentrated and condensed further into graphene sheets, which are ordered into a 3D stack during graphitization. The synthesized graphite is then unpacked by methods such as exfoliation to various graphene products. GQDs were synthesized from all four coal types, and their optical properties were demonstrated to be tunable by the coal precursor preprocessing treatments. In all four coal types, enhanced optical properties were observed for the produced GDQs with incremental improvements made to the coal precursors. GQDs produced from raw coal samples displayed lower ultraviolet–visible (UV–Vis) spectroscopy absorbance intensity compared to those obtained from cleaned and upgraded coal residues. The photoluminescence (PL) intensities also varied with pretreatment conditions and with the concentration of GQDs in aqueous solutions. GQDs obtained from anthracite show longer emission wavelengths and can be excited by visible light as opposed to GQDs derived from the other coal ranks. UV fluorescence 3D maps and spectra revealed that the emission wavelength at which the GQDs solutions display the highest intensity was slightly redshifted based on the coal precursor pretreatments. In low-rank coal (lignite and subbituminous) samples, two clusters were observed in the maps for GQDs, which may suggest that there are potentially two types of fluorophores in solution or two main size populations. The ability to tune the properties of GQDs based on processing methods can be exploited to make GQDs for various optical display or optoelectronics applications. The results also highlight the importance of removing coal-borne impurities to improve the quality of the coal precursor for preparation of graphene products. Coal and/or coal wastes preprocessing methods were developed and applied to clean and upgrade the coal precursors prior to graphitization and subsequent conversion to graphene products. The preprocessing methods involve high specific-gravity separations, mineral acid cleaning (no hydrofluoric acid), and subsequent upgrading by reducing the coal-borne heteroatom (nitrogen, sulfur, and oxygen) content using proprietary chemical agents. Analytical characterization revealed that the preprocessing steps were successful, with ash reductions that range from 38% to 80% and residual ash content that was below the 5 wt% initial target. Based on proximate and ultimate analysis, the heteroatom reduction reactions produced upgraded coal residues with the oxygen content reduced by 8% to 24%, with additional reductions in the nitrogen and sulfur contents. An initial assessment of the waste streams from the UCP process shows very small to negligible environmental impact due to CO 2 , NO x , and SO x because most process steps are performed under inert atmosphere with argon. Consequently, reactive oxygen environments that tend to create these species are avoided. The inorganic and potentially hazardous species are released into aqueous waste streams that are easy to handle for proper disposal. The liquid waste streams were found to contain low-level concentrations of rare-earth elements (REEs), which could be concentrated and recovered as value-added by-products. Additionally, the volatile and gaseous fractions from carbonization and heat treatment contain useful organic compounds that can also be recovered as potential valuable by-products. Thus, the UCP technology is considered an environmentally sustainable and promising emerging technology for making high-value products from coal and coal wastes, with potential additional value-added by-products. Analysis of potential markets for the coal-derived carbon products shows a strong demand in both niche market sectors and across a wide variety of other industrial sectors. Graphite is currently considered a critical mineral commodity that has a large and growing demand in the LIB industry for EV applications. Based on data from Fortune Business Insights (2022) and Marketwatch (2023) reports, the average global graphite market is projected to reach about 33 billion by 2028, growing at a compound annual growth rate (CAGR) of about 7%, with much of this growth expected to be in the LIB industry. GO and rGO have strong market potentials in various application areas, such as coatings for anticorrosion, anti-icing, and antimicrobial protection, thermal barriers, wear resistance, sensors, additive manufacturing such as 3D inks, and others. GQDs are the emerging key player in the bioimaging, photovoltaics, and light-emitting diodes (LEDs) applications, with the potential to replace traditional semiconductor quantum dots (SQDs), which are based on metallic systems that are more toxic and more expensive. Biomedical applications of GQDs are becoming more attractive because of low to no toxicity and extremely low cost compared to SQDs. The major challenges for scale-up and commercialization of coal-derived carbon products such as graphene vary from the inherent attributes of graphene itself to reluctance to accept graphene in new manufacturing processes because of the uncertainty of the unknown. The 2D nature of graphene materials with a thickness of one atom presents significant challenges to proper handling/processing, and process scale-up becomes difficult because it requires high-end, expensive equipment, even for routine handling and analysis for quality assurance and control. Pristine graphene can also be extremely difficult to work into other matrices, thus hindering downstream processibility, especially at large scale. Currently, the cost of graphene and graphene products is still high and presents an economic risk that tends to slow down investment in scaling up emerging technologies. The lack of a standard for graphene materials for quality assurance and quality control poses a great challenge not only for the markets but also for commercialization efforts. A first-look economic feasibility analysis of the UCP technology provided valuable information that suggests the UCP process would be feasible, especially when it is scaled to a pilot scale and could be more competitive at the full scale. Graphitization was found to be the most energy-consuming and most capital-intensive step in the overall process. In small laboratory- and bench-scale experiments, labor is a significant contributor to the total process costs. Although these energy, capital, and labor constraints contribute to a higher selling price for the product, a preliminary economic model suggests that the process would be feasible at large scale when the process is fully integrated, optimized, and automated.

01 COAL, LIGNITE, AND PEAT↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗