Strength and Breakup Factors in Impact Scenario Risk Assessment
No abstract available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract available
No abstract available
No abstract available
This paper introduces a method for assessing similarity between available shock-layer radiation measurements and the radiative heating to a vehicle of interest. This method will be referred to as the flowfield property binning (FPB) approach. The challenge in developing this approach is that radiometer measurements from a surface normal line of sight, observed radiation measurements of the entire shock-layer from a distance, or measured shock-tube nonequilibrium profiles are notably different geometrically than the radiative flux to a vehicle surface. Therefore, the relative contributions of various regions of the shock-layer to the measurement, and how these relative contributions compare with the radiative heating to a vehicle of interest, are unclear. By tracking the radiation contribution from each flowfield location, and then grouping this contribution based on two local flowfield properties, these geometric differences are removed. This provide a two dimensional group, or bin, distribution that represents the radiation environment in the same format for various types of radiation simulations, such as observed radiation or radiative flux to a vehicle surface. In the limits of optically-thin radiation transport and thermochemical equilibrium flow, the choice of pressure and temperature as the binning flowfield properties is shown to provide a bin distribution that uniquely defines the radiation simulation. This concept is found to be sufficient for establishing similarity between two cases even when the optically-thin radiation transport and thermochemical equilibrium assumptions are not satisfied. A simple metric of comparison between bin distributions from different cases is provided by the histogram intersection algorithm. This algorithm results in a histogram intersection factor (H) between 0 and 1, which represents the fraction of the radiation that is similar between the two cases. Therefore, if H evaluated between bin distributions for two completely different radiation problems is near 1, then they represent essentially the same radiation problem. This means that they depend on the same weighting of various radiation modeling parameters evaluated at the same pressure and temperature. If one of these cases agrees well with a radiation measurement, then the matching bin distributions provide justification for applying this experimental validation to the other case. Even for H values as low as 0.2, the measurement case could be considered relevant if there are no other useful measurements. This approach allows observed radiation measurements to directly inform radiative heating simulations, which allows NASA’s past and future investments in observed radiation measurements to directly inform the radiative heating uncertainty or margins for future vehicle design. This FPB approach is also used to determine shock-tube conditions for informing backshell radiative heating simulations, where the normal shock velocity and Lagrangian time from the shock is used for the binning variables instead of pressure and temperature.
Nearly three-fourths of U.S. states have authorized local governments to use voluntary special assessments on commercial properties to finance energy improvements that boost economic development, create jobs, increase property values and advance energy goals. Commercial Property Assessed Clean Energy (C-PACE) financing allows building owners to repay the borrowed capital — from private or public sources — over time using their property as security. Berkeley Lab is supporting the Department of Energy’s Commercial PACE Working Group by developing a series of C-PACE issue briefs. The second brief in this series, Practices for Demonstrating Energy Savings from Commercial PACE Projects, looks at common practices for demonstrating energy savings to support state and local governments that sponsor C-PACE programs and want to track their energy impacts. This brief reviews: -The value proposition and trade-offs of conducting energy impact assessments for C-PACE programs; -Methods to quantify energy savings impacts from energy efficiency building improvements; and -Available resources and tools to support energy impact assessments. C-PACE programs may benefit from energy impact assessments for many reasons, including: -Validating the public benefits of the programs -Demonstrating that C-PACE can deliver participant benefits -Illustrating program impacts on public policy goals -Generating data to help improve program performance Many C-PACE programs are collecting data on project energy savings impacts, and these data can be leveraged to further support decision making and program implementation. Potential drawbacks to energy impact assessments may include added cost and burdens on property owners (e.g., the need to collect building energy consumption data). Where these burdens are considerable, they might slow program uptake. State and local governments can balance the benefits of energy impact assessments with the range of costs and accuracy inherent to available assessment methodologies. Additionally, depending on the policy context in the state or local government, a C-PACE program may be able to leverage existing efforts (e.g., building energy benchmarking programs) to reduce impact assessment costs, align with building owner practices and expectations, and efficiently assess program impact.
No abstract available
Electronic Medical Records (EMR) have been emerging over the past decade. Today, they are replacing the paper chart in clinics throughout the nation. Approximately three years ago, the NASA-JSC Flight Medicine Clinic initiated an assessment of the EMRs available on the market. This assessment included comparing these products with the particular scope of practice at JSC. In 1998, the Logician EMR from Medicalogic was selected for the JSC Flight Medicine Clinic. This presentation reviews the process of selection and implementation of the EMR into the unique practice of aerospace medicine at JSC.
A 2 year time series of optical, biogeochemical, and physical parameters, taken near the island of Bermuda, is used to evaluate the sources of temporal variability in light avaliability and utilization in the Sargasso Sea. Integrated assessments of light availability are made by examining the depth of constant percent incident photosynthetically available radiation (% PAR) isolumes. To first order, changes in the depth %PAR isolumes were caused by physical processes: deep convection mixing in the winter which led to the spring bloom and concurrent shallowing of %PAR depths and the occurrence of anomalous thermohaline water masses during the summer and fall seasons. Spectral light availability variations are assessed using determinations of diffuse attenuation coefficient spectra which illustrates a significant seasonal cycle in colored detrital particulate and/or dissolved materials that is unrelated to changes in chlorophyll pigment concentrations. Temporal variations in the photosynthetic light utilization index Psi are used to assess vertically intergrated light utilization variations. Values of Psi are highly variable and show no apparent seasonal pattern which indicates that Psi is not simply a 'biogeochemical constant.' Determinations of in situ primary production rates and daily mean PAR fluxes are used to diagnose the relative role of light limitation in determining vertically integrated rates of primary production integral PP. The mean depth of the light-saturated zone (the vertical region where the daily mean PAR flux was greater than or equal to the saturation irradiance) is only approximately 40 m, although more than one half of interal PP occurred within this zone. Production model results illustrate that accurate predictions of integral PP are dependent upon rates of light-saturated production rather than upon indices of light limitation. It seems unlikely that significant improvements in simple primary production models will come from the partitioning of the Earth's seas into biogeochemical provinces.
Turbine-mounted lidars provide preview measurements of the incoming wind field. By reducing loads on critical components and increasing the potential power extracted from the wind, the performance of wind turbine controllers can be improved [2]. As a result, integrating a light detection and ranging (lidar) system has the potential to lower the cost of wind energy. This paper presents an evaluation of turbine-mounted lidar availability. Availability is a metric which measures the proportion of time the lidar is producing controller-usable data, and is essential when a wind turbine controller relies on a lidar. To accomplish this, researchers from Avent Lidar Technology and the National Renewable Energy Laboratory first assessed and modeled the effect of extreme atmospheric events. This shows how a multirange lidar delivers measurements for a wide variety of conditions. Second, by using a theoretical approach and conducting an analysis of field feedback, we investigated the effects of the lidar setup on the wind turbine. This helps determine the optimal lidar mounting position at the back of the nacelle, and establishes a relationship between availability, turbine rpm, and lidar sampling time. Lastly, we considered the role of the wind field reconstruction strategies and the turbine controller on the definition and performance of a lidar's measurement availability.
Substantial changes in the hydrological cycle are projected for the 21st century, but these projections are subject to major uncertainties. In this context, the “dry gets drier, wet gets wetter” (DDWW) paradigm is often used as a simplifying summary. However, recent studies cast doubt on the validity of the paradigm and also on applying the widely used P-E (precipitation - evapotranspiration) metric over global land surfaces. Here we show in a comprehensive CMIP5-based assessment that projected changes in mean annual P - E are generally not significant, except for high-latitude regions showing wetting conditions until the end of the 21st century. Significant increases in aridity do occur in many subtropical and also adjacent humid regions. However, combining both metrics still shows that approximately 70% of all land area will not experience significant changes. Finally, based on these findings, we conclude that the DDWW paradigm is generally not confirmed for projected changes in most land areas.
This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.
Background: The availability of land for the installation of wind power turbines is restricted by numerous factors. Besides climatic conditions, the deployment of wind energy is limited by technical, social, economic, and environmental factors. Typically, assessments of land availability for wind power use legal and technical criteria to estimate the potential for wind power expansion. In contrast, we use observed characteristics of wind power generation sites existing in Austria and Denmark to estimate its potential expansion in Czechia. We combined data on wind turbine locations with data on land use, wind speeds, human impact on land, and nature conservation areas. Results: Our analysis shows that the density of wind power in Austria is variable, but higher on average (4.79 MW km-2 ) than in Denmark (1.76 MW km-2 ). Austrian wind turbines have been installed in areas where the human impact on land is mostly higher than the Austrian average, while in Denmark, no difference is observed. Regarding the land use composite, the share of agricultural land on sites with wind turbines is on average much higher (86%), while the share of forest is much lower (7%) in both countries. We identified a maximum potential area in Czechia of 543 km2 with Austrian and 421 km2 with Danish characteristics. When conservatively assuming observed historical power densities, this area translates to 2295 MW and 741 MW of installed wind power capacity, respectively. These results are a magnitude of order lower than the potentials found in existing studies. In a sensitivity analysis, we have examined that the availability of potential sites depends mainly on the population density, the human impact on land, prevailing wind speeds, and the height above sea level. Conclusions: We estimated available land area for potential wind turbine installations in Czechia using our newly developed methodology based on observed site characteristics of today’s wind power infrastructure in Austria and Denmark. Available land area indicated possible overestimation of wind power capacities proposed in the recent studies on the renewable energy transition. Hence, more rigorous consideration of land availability is required for assessments of potential wind power expansion.
Grand Teton National Park provides habitat for a small native population of approximately 125 bighorn sheep (Ovis canadensis). The reduction in population of this species is attributed to loss of low elevation habitat, changing local environmental and climatic conditions, and increased disturbance from backcountry recreation. In response to these changes, this population of sheep employs a unique high-elevation wintering strategy in which they amass large fat stores in the summer and expend as little energy as possible in the winter while foraging on high elevation wind-swept and snow-free areas. For this project, DEVELOP partnered with Grand Teton National Park and used NASA Earth observations including Landsat 8 Operational Land Imager (OLI), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 5 Thematic Mapper (TM), and Terra Moderate Resolution Imaging Spectroradiometer (MODIS) snow cover data to assess habitat suitability. Landcover change analyzed between 1987 and 2020 indicated shifting trends in grass and forb cover and tree cover. These trends persisted in the 2031 prediction, with grass cover decreasing and tree cover increasing, which translates to a loss of overall favorable habitat for bighorn sheep. Snow cover analyzed between 2001 and 2020 indicated similar unfavorable trends for the sheep with a decrease in barren areas, important for winter foraging. Finally, habitat suitability was modeled for 2020 and predicted to 2031 to determine habitat gains and losses for this species across the landscape. Overall, the results predicted decreases in suitable habitat and indicated that while these sheep are highly adaptable, strategies to manage suitable bighorn habitat may need to be employed rapidly to effectively conserve this species.
Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.
Not Available
Peak power demand strains electrical grids and increases cost of electricity generation, transmission and distribution infrastructure. Many studies have examined ways of reducing peak power demand, including modification of room air temperature setpoints or reduction of lighting levels. However, very few or no studies have examined the peak power reduction resource offered by temporary curtailment of building ventilation systems. For this reason, we conducted a simulation campaign in which we examined the resource offered by temporary ventilation curtailment in commercial buildings of different use types across the United States and in residences in the state of California, with the essential constraint that any changes resulted in air quality acceptable to occupants through additional ventilation to compensate for the curtailment. To do this, we employed previously validated building models implemented in the airflow and contaminant transport tool CONTAM and building thermal and systems modeling tool EnergyPlus, in some cases co-simulated. Overall, results show savings are highly dependent on building type and climate but range from 0–2 W/ft 2 and up to 40% of total peak building power demand. Depending on building type, this power shed can be conducted for 1.5–8 h before acute exposure or odor concerns are expected, assuming a safety factor of 2. This reduction is of the same magnitude as that offered by thermal control strategies such as setpoint increase, or from lighting reduction strategies.