Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “annual”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

2024 Annual Merit Review - Vehicle Technologies Office: Results Report

The 2024 U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy’s (EERE) Vehicle Technologies Office (VTO) Annual Merit Review (AMR) was held June 3-6, 2024, in Arlington, Virginia. The review encompassed work done by VTO: 226 individual activities were reviewed by 218 reviewers. Exactly 888 individual review responses were received for the VTO technical reviews. Each project was reviewed by 2–7 independent reviewers, with a majority of projects having 4–5 reviewers. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia to give inputs to DOE with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.

33 ADVANCED PROPULSION SYSTEMS↗

United States Nuclear Data Program Annual Report for Fiscal Year 2025

The US Nuclear Data Program (USNDP) Annual Report for Fiscal Year 2025 summarizes the work of USNDP for the period of October 1, 2024 through September 30, 2025, with respect to the Work Plan for FY 2025 that was prepared in 2024. The Work Plan and Final Report for USNDP are prepared for the DOE Office of Science, Office of Nuclear Physics. The support for the nuclear data activity from sources outside the US Nuclear Data Program is summarized in the staffing table and Appendix A. This leverage amounts to about 22.8 FTE scientific, to be compared with 21.9 FTEs at USNDP units funded by the DOE Office of Science, Office of Nuclear Physics. Since it is often difficult to separate accomplishments funded by various sources, some of the work reported in the present report was accomplished with nuclear data program support leveraged by other funding. FY 2025 was the 25th year in which the USNDP has operated under a Work Plan developed by the program participants. The program continued to carry out important work in support of the DOE mission. The work balances the ongoing collecting, analyzing, and archiving of nuclear physics information critical to basic nuclear research and to the development and improvement of nuclear technologies with the electronic distribution of this information to users in a timely and easily accessible manner. The present section of the report consists of activity summaries for the major components of the USNDP. This is followed by an updated staff level assignment table that reflects the final distribution of effort among the tasks carried out during FY 2025. Then, we continue with the detailed status of work performed during FY 2025.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Jupiter Laser Facility Annual Report, FY 2025

Dear JLF community, I cannot believe I am now entering my third year as JLF director — time definitely flies when you are having fun! FY25 was another pivotal year for the Jupiter Laser Facility, marked by both scientific achievement and growing visibility for our community. Building on the successful reopening and refurbishment of the facility, we continued to demonstrate how JLF drives innovation in high energy density and fusion energy science, laser technology, and workforce development. Across Janus, Titan, and COMET, users executed a diverse portfolio of experiments, from dynamic compression and opacity measurements to laser plasma interactions, laboratory astrophysics, and advanced diagnostics. These efforts are highlighted in this report, including the development of new probes that capture the time evolution of plasmas on a single shot, and diagnostics and platforms that are already impacting experiments at NIF and other large facilities. JLF continues to serve as both a testbed for new ideas and a bridge to larger scale campaigns. FY25 also showcased the broader role of JLF within the Laboratory and the national HED science ecosystem. The NIF JLF User Groups Meeting in February brought nearly 180 participants to Livermore and highlighted the scientific progress made during JLF’s first full year of renewed operations. JLF research and users were recognized with Director’s Institutional Awards and Early and Mid Career awards, underscoring the quality and impact of the work performed here. Our team also contributed prominently to national conversations about laser safety, plasma physics, and inertial fusion energy through invited talks, conferences, and professional society leadership. JLF’s integration with LaserNetUS deepened this year as well. We launched a new technical exchange program across LaserNetUS facilities and kicked it off with a JLF team visit to the BELLA Center at Lawrence Berkeley National Laboratory. These exchanges are strengthening operations, sharing best practices, and improving the user experience across the network. Filming for the LaserNetUS “Behind the Scenes” series and participation in the annual LaserNetUS meeting further increased the visibility of our facility and our users. At the same time, JLF continues to play a central role in ambitious new programs, such as the Big Aperture Thulium laser effort funded through one of the DOE Office of Science Microelectronics Science Research Centers, which will use JLF infrastructure to explore next generation high rep rate lasers for EUV and x-ray source development. A core part of our mission remains training the next generation of scientists. In FY25, we welcomed another cohort of summer students, who joined experimental teams on Titan and presented their research at LLNL’s student poster symposium and national inertial fusion energy meetings. JLF users and early career scientists showcased their work at conferences across the country, highlighting experiments performed at the facility. These hands on experiences, and the mentoring provided by our staff and user teams, are central to JLF’s identity as a true user facility. Finally, FY25 reinforced JLF’s role as a focal point for partnerships and outreach. We hosted visits from international collaborators, science leaders, and we shared the story of the facility through venues such as the Big Ideas Lab podcast. These interactions help connect our work to a broader scientific and policy audience and open new pathways for collaboration. As we look ahead, the combination of refurbished hardware, new capabilities like STILETTO and enhanced short pulse performance on Titan, strong partnerships across LLNL and LaserNetUS, and a growing user community positions JLF for an even more ambitious program in the coming years. I am deeply grateful to our technical and operations staff for their dedication, to our LLNL partners for their continued support, and to our users for bringing bold, creative ideas to the facility. I look forward to more experiments, capabilities, partnerships, and groundbreaking science in the years to come! With brightest regards, Félicie Albert, JLF Director.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Feedstock-Conversion Interface Consortium Annual Review of Research – FY 2021

Led by the U.S. Department of Energy’s Bioenergy Technologies Office, the Feedstock-Conversion Interface Consortium (FCIC) is a multi-lab collaboration that develops first-principles-based knowledge and tools to understand, quantify, and mitigate the effects of feedstock and process variability across the bioenergy value chain, from the field and forest through downstream conversion. The FCIC recently published its Annual Review of Research Fiscal Year (FY) 2021 report, which presents an overview of the research accomplishments of FCIC members in FY 2021, covering both the low- and high-temperature conversion pathways and all three process areas: Feedstock harvest and storage Preprocessing Conversion. The key research achievements of each task are presented, along with planned FY 2022 work that will build on the FY 2021 accomplishments.

09 BIOMASS FUELS↗

Annual Site Environmental Report Pantex Plant Calendar Year 2024

The 2024 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order (DOE O) 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Annual Summary Report (FY 2025) Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. All the trenches in these burial grounds except two have remained inactive since July 2004. The only active trenches that continue to receive low-level and mixed low-level waste are Trenches 31 and 34 that are located in the southern portion of the 218-W-5 Burial Ground. During this reporting period (fiscal year 2025, from October 1, 2024, through September 30, 2025), waste was disposed in Trench 31 only.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report (FY 2025) Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for fiscal year (FY) 2025 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1, Radioactive Waste Management. The ASR follows the guidance in DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report (FY 2025) Performance Assessment for the Disposal of Low-Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low Level Burial Grounds (LLBGs) since September 26, 1988. All trenches in these burial grounds except one have remained inactive since July 2004. Trench 94 located in 218-E-12B Burial Ground is the only active trench, which is dedicated for disposal of U.S. Navy reactor compartments. During this reporting period (fiscal year 2025, from October 1, 2024, through September 30, 2025), two reactor compartments were disposed in Trench 94.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report (FY 2025) Composite Analysis for Low-Level Waste Disposal in the Central Plateau of the Hanford Site

In accordance with DOE M 435.1-1, Radioactive Waste Management Manual, requirements, the U.S. Department of Energy (DOE) Hanford Field Office (HFO) prepared this Annual Summary Report (ASR) for fiscal year (FY) 2025 for the Hanford Site Composite Analysis (CA) reported in DOE/RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (hereinafter referred to as the Hanford Site Composite Analysis). The preparation of this ASR follows the technical specifications provided in DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY25 Electric Grid Security Annual Report

Sandia’s Electric Grid Security program advances a national vision of energy dominance and accessibility, while applying our national security -emphasis on ensuring of a secure, resilient, and affordable electric system for all users. Our achievements reflect a strategic approach combining technology development; modeling, simulation, and data analytics; and partnered demonstrations and outreach to further the adoption of advanced grid and storage technologies. Our FY25 efforts leverage the strengths of our partnerships—spanning Sandia’s core science and technology competencies as well as external technology leaders—to develop the solutions today which enable the grid of tomorrow. Key accomplishments in this report that support our strategy span our technical program areas and include: • New open-source analytical tools for systems -level planning and optimization, including significant advances to the QuESt analytical environment; • Further advancement of artificial intelligence and machine learning to enhanced grid operations and planning as we rise to the challenge of new large loads; • Development of solid-state power conversion technologies and a new medium-voltage research lab; • New technologies to assess wildfire vulnerabilities and mitigate potential impacts; • Advanced applications of new cybersecurity technologies with industry partners; • Contributions to understanding the impacts of electromagnetic pulses and geomagnetic disturbances on grid components; and • Digital twin development for hybrid microgrids with multiple generators, storage, and loads. This report indicates key areas of research and engagement and summarizes the impact of Sandia’s contributions through notable accomplishments, journal publications, patents, and technical conferences and presentations. It is provided with the hope that readers discover ways we can further team to create our modern grid and apply the outcomes of our efforts. The bulk of work described herein is funded by several offices within the U.S. Department of Energy (USDOE), including the Office of Electricity (OE); Cybersecurity, Energy Security, and Emergency Response (CESER); former offices such as the Office of Energy Efficiency and Renewable Energy (EERE), the Grid Deployment Office (GDO), the Office of Clean Energy Demonstrations (OCED), and other key programs at USDOE. As we continue to state in these annual reports, the contributors to our successes are too numerous to name here, though our team wishes to express our deep gratitude to the numerous program and project sponsors at the US Department of Energy, who often function equally as technical collaborators; our many partners in industry, academia, utilities, and other national labs; and fellow researchers and business partners at Sandia whose leadership and creativity have enabled the accomplishments described herein.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Total Effective Dose from Radiologic Emissions from INL Facilities for Calculation of Population Dose for the INL 2024 Annual Site Environmental Report

Total effective radiation dose from airborne releases was calculated using air dispersion modeling performed by the National Oceanic and Atmospheric Administration (NOAA) Idaho Falls Office using their HYSPLIT computer model (Stein et al. 2015; Draxler et al. 2013), and the Dose Multi-Media (DOSEMM) dose assessment model (Rood 2019) . The objective of these calculations was to provide a grid of total effective dose across a model domain that encompasses a 50-mile (80-km) radius from any Idaho National Laboratory (INL) Site source. In addition to INL Site sources, releases from the Radiological and Environmental Sciences Laboratory (RESL) (IF-683) and IF-603 located at the INL Research Center (IRC) within the Idaho Falls city limits were also included. Due to tracking limitations, radionuclides released from IF-611 and IF-603 are modeled as released from IF-603. The dose results will be combined with GIS software to compute a total population dose for the calendar year (CY) 2024 and will be reported in the INL Annual Site Environmental Report (ASER). This report does not cover the population dose calculation and only documents generation of the gridded dose file.

42 - ENGINEERING↗

Environmental Performance Report 2025: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Laboratory of the Rockies (NLR) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2025, including information on environmental performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2021 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies

Starting in 2015 NREL has presented the Annual Technology Baseline (ATB) in an Excel workbook that contains detailed cost and performance data, both current and projected, for renewable and conventional technologies. The workbook includes a spreadsheet for each technology. This version of the workbook provides the final updates to data for the 2021 ATB. In 2019 and 2020, NREL has also provided selected data in Tableau workbooks and structured summary csv files. The data for 2015 - 2020 is located on https://data.nrel.gov. In 2021 and going forward, the data is cloud optimized and provided in the OEDI data lake. A website documents this and future data at https://atb.nrel.gov.

Array↗