Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Utility of Waste Tank Historical Reviews in Bulk Waste Removal Operations at the Savannah River Site – 25271

SRMC is actively working to remove, treat, and dispose radioactive waste generated by the separation facilities at SRS since their initial operations in the 1950s. The separation facilities at SRS have produced nuclear materials for a variety of purposes, particularly national defense, and continue to support the disposition of spent fuel through the Accelerated Basin Deinventory program. In almost 70 years of operation, nearly 625,000 m3 (165 million gallons) of radioactive waste have been generated and transferred to the tank farm facilities at SRS [1]. As a result of volume reduction (e.g., evaporation) and waste solidification (e.g., vitrification), approximately 127,000 m3 (33.5 million gallons) of material remain as of June 30, 2024 [2]. This liquid waste has since been stored in 51 large underground waste tanks present on the site. These waste tanks may contain up to 4,921 m3 (1.3 million gallons) of radioactive waste each in the form of saltcake or sludge. SRMC’s contract is to treat and dispose of this waste, clean the tanks, and operationally close them. To date, 8 of the 51 waste tanks have been operationally closed. Waste retrieval and tank closure activities are ongoing in an additional 17 tanks through either operations in the field or in design [3].

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Washing and Demonstration of the DWPF Nitric/Formic Flowsheet in the SRNL Shielded Cells for Sludge Batch 9 Qualification

Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (SRR) to qualify the next batch of sludge – Sludge Batch 9 (SB9). Current practice is to prepare sludge batches in Tank 51 by transferring sludge to Tank 51 from other tanks. The sludge is washed and transferred to Tank 40, the current Defense Waste Process Facility (DWPF) feed tank. Prior to sludge transfer from Tank 51 to Tank 40, the Tank 51 sludge must be qualified. SRNL qualifies the sludge in multiple steps. First, a Tank 51 sample is received, then characterized, washed, and again characterized. SRNL then demonstrates the DWPF Chemical Process Cell (CPC) flowsheet with the sludge. The final step of qualification involves chemical durability measurements of glass fabricated in the DWPF CPC demonstrations. In past sludge batches, SRNL had completed the DWPF demonstration with Tank 51 sludge. For SB9, SRNL has been requested to process a blend of Tank 51 and Tank 40 at a targeted ratio of 44% Tank 51 and 56% Tank 40 on an insoluble solids basis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Delivery of Hanford High-Level Radioactive Waste Slurry

Two primary challenges to characterizing Hanford’s high-level radioactive waste slurry prior to transfer to a treatment facility are the ability to representatively sample million-gallon tanks and to estimate the critical velocity of the complex slurry. Washington River Protection Solutions has successfully demonstrated a sampling concept that minimizes sample errors by collecting multiple sample increments from a sample loop where the mixed tank contents are recirculated. Pacific Northwest National Laboratory has developed and demonstrated an ultrasonic-based Pulse-Echo detection device that is capable of detecting a stationary settled bed of solids in a pipe with flowing slurry. These two concepts are essential elements of a feed delivery strategy that drives the Hanford clean-up mission.

critical velocity↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges, Successes, and Lessons Learned on Two Active DOE Facility D and D Projects - 18379

'Surgical removal', although having a number of technical and safety challenges, is an effective alternative to traditional Demolition and Decommissioning (D and D) methods. When carefully planned and managed, surgical removal of equipment can be safely performed to achieve cost savings and accelerated schedule. At Fernald, a large groundwater extraction system that treats radionuclides was downsized during continued operations. Challenges included demolition of remedial components in tight spaces adjacent to active components, in-situ management and removal of slurry multimedia and resins, and complex hoisting/rigging of whole vessels from very tight areas. The approach realized a significant reduction in waste volumes and slurry transfer to reduce radionuclide exposure while allowing use of existing vessels as IP-1 shipping containers while providing an opportunity to implement out of the box design for hoisting/rigging/moving large vessels. Several lessons were learned as Los Alamos Technical Associates, Inc. (LATA) faced the project challenges and progressed through the D and D process. The slurry removal required thorough understanding of equipment selection and circulation techniques to maintain a slurry while avoiding plugging of extraction equipment. The physical condition of each individual tank was different and required development of alternate removal techniques, such as draining the vessel and removal of the hard material with an air vacuum truck, for each one. Lessons learned regarding large tank removal focused on recertification of an overhead crane, determination of pick points from a partially filled vessel, reanalyzing the lifting lugs for a partially full tank, and requirements to fill all void space in the vessels to meet off-site disposal specifications. At Oak Ridge National Laboratory (ORNL), LATA performed the surgical removal of all biomass process equipment inside ORNL's Building 2719. Among the challenges was a requirement that the removal action had to be conducted during continued operations. Live steam lines, fire protection, water process and boiler feed water systems were operational during LATA's D and D effort and were in close proximity to removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Retrieval and Transfer System Mockup for Pneumatic Conveyance of High-Level Calcine Waste - 19563

The Idaho National Laboratory reprocessed spent nuclear fuel from 1953 to 1994. The reprocessing used solvent extraction to separate uranium, resulting in a high-level radioactive liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive granular solid, referred to as calcine. The calcine is stored in stainless-steel bins contained within six concrete vaults called the Calcined Solids Storage Facilities (CSSFs). The Calcine Disposition Project is tasked with demonstrating the ability to retrieve the calcine from the bins of CSSF 1 and transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository, with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. To overcome those challenges in a timely and objective manner, a full-scale mockup will be constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. Mockup equipment will include an air compressor, filtration, blower/vacuum, and retrieval devices. In addition to defining process parameters, the mockup testing scope will demonstrate the amount of residual calcine that can be expected to be in the bins following extraction. This will be key to preparing for closure of CSSF 1 following removal of the calcine. Once testing is complete, the mockup will constitute a model of the calcine extraction and transport system and will be prepared to fulfill a second advantageous objective: the operators that will carry out the calcine transfer from CSSF 1 to CSSF 6 will be trained using the mockup. The control system will be identical, the major pieces of equipment will be representative, and the procedures will be analogous; hence, high-fidelity training can take place at the mockup. Once radiological operations commence at CSSF 1, the mock-up's commission will still not be completed. If any problems arise during calcine transport, the mockup will be ready to serve as a simulator to more effectively reproduce dilemmas and deduce solutions. The mock-up's mission spans the duration of the project. Its usefulness begins with helping to identify process criteria. Operations personnel will benefit greatly from its use as a training tool. And finally, the immediate availability of a simulator to reproduce problems encountered during radiological extraction and transfer will be invaluable. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure pneumatic transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ROTARY FILTER FINES TESTING FOR SMALL COLUMN ION EXCHANGE

SRNL was requested to quantify the amount of 'fines passage' through the 0.5 micron membranes currently used for the rotary microfilter (RMF). Testing was also completed to determine if there is any additional benefit to utilizing a 0.1 micron filter to reduce the amount of fines that could pass through the filter. Quantifying of the amount of fines that passed through the two sets of membranes that were tested was accomplished by analyzing the filtrate by Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) for titanium. Even with preparations to isolate the titanium, all samples returned results of less than the instrument's detection limit of 0.184 mg/L. Test results show that the 0.5 micron filters produced a significantly higher flux while showing a negligible difference in filtrate clarity measured by turbidity. The first targeted deployment of the RMF is with the Small Column Ion Exchange (SCIX) at the Savannah River Site (SRS). SCIX uses crystalline silicotitanate (CST) to sorb cesium to decontaminate a clarified salt solution. The passage of fine particles through the filter membranes in sufficient quantities has the potential to impact the downstream facilities. To determine the amount of fines passage, a contract was established with SpinTek Filtration to operate a 3-disk pilot scale unit with prototypic filter disk and various feeds and two different filter disk membranes. SpinTek evaluated a set of the baseline 0.5 micron filter disks as well as a set of 0.1 micron filter disks to determine the amount of fine particles that would pass the membrane and to determine the flux each set produced. The membrane on both disk sets is manufactured by the Pall Corporation (PMM 050). Each set of disks was run with three feed combinations: prototypically ground CST, CST plus monosodium titanate (MST), and CST, MST, plus Sludge Batch 6 (SB6) simulant. Throughout the testing, samples of the filtrate were collected, measured for turbidity, and sent back to SRNL for analysis to quantify the amount of fines that passed through the membrane. It should be noted that even though ground CST was tested, it will be transferred to the Defense Waste Processing Facility (DWPF) feed tank and is not expected to require filtration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flowsheet for the Neutralization of Accelerated Basin De-inventory (ABD) Material

Under the Accelerated Basin De-inventory (ABD) program H-Canyon will be dissolving aluminum spent nuclear fuel (ASNF) and then neutralizing that solution without performing head-end strike or uranium recovery operations. After dissolution in H-Canyon the material will be neutralized to a free hydroxide concentration of either 0.6 M or 1.2 M to meet the waste acceptance criteria for transfer to the SRS Concentration, Storage and Transfer Facility (CSTF). In order to ensure the material could be successfully neutralized and transferred, SRNL completed experiments with simulated H-Canyon dissolver solutions. Two bounding simulants were developed based on the expected compositions of ASNF to be dissolved, one containing only Gd as the neutron poison and one containing Fe as an additional poison.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Double Shell Waste Tank Corrosion Studies (Final Report FY2023)

For fiscal year (FY) 2023, the Savannah River National Laboratory (SRNL) focused on two experimental tasks related to Hanford Double Shell Tank (DST) chemistry and integrity. The first task focused on understanding risk of corrosion due to formation of either continuous layers or discrete patches of solids on the tanks’ inner sidewalls and bottoms. Differences in the conductivity between various layers of the tank (e.g., solids, liquid, etc.) could result in differences in the electrochemical potential of the tank metal at various locations. The electrochemical potential difference may result in a corrosion current between the coupled surfaces. In FY23, SRNL investigated test configurations and protocols that could evaluate the presence of a galvanic couple between the tank bottom and the tank wall.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Double Shell Waste Tank Corrosion Studies- Final Report FY2024

For fiscal year (FY) 2024, the Savannah River National Laboratory (SRNL) focused on two experimental tasks related to Hanford Double Shell Tank (DST) chemistry and integrity. The first task focused on understanding risk of corrosion due to formation of either continuous layers or discrete patches of solids on the tanks’ inner sidewalls and bottoms. The objective of this task was to determine the effect of solid deposits on the corrosion risk to the tank bottom, and whether a combination of scale, saltcake and loose solids lead to under deposit corrosion. Electrochemical testing in a single cell arrangement was employed to determine a threshold inhibitor level for the interstitial liquid in the solids, above which carbon steel was not susceptible to corrosion beneath the solids. The inhibitor levels tested were based on the previously determined probability of failure for carbon steel in a simulated waste (i.e., Pitting Factor).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Uranium Slugs at the CEA Marcoule site - 12026

The decladding units on the Marcoule nuclear site in southeast France were commissioned in the early 1960's to receive spent fuel cartridge for interim storage in pools and to prepare them for dissolution. After decladding, the uranium slugs were sent to the reprocessing plant for dissolution. The units were shut down in 1997. All the operational and process equipment was dismantled and transferred to the ANDRA waste repository between 1998 and 2001. During cleanup of the G2-G3 interim storage pool all the internal components (baskets and machinery) mounted on the civil engineering structures were cut up. In November 2007, a UNGG fuel slug in its aluminum cartridge was found at the bottom of the pool. Similarly, while iron slugs (used to control plutonium-producing reactors) were being sorted, five de-cladded uranium slugs were found between 2006 and 2008. As the processing facilities had already been dismantled, it was decided to send these fuel cartridges to a laboratory for dissolution. The project was to recover and condition the cartridge and slugs and transport them safely to the laboratory. This required the design of dedicated equipment due in particular to the high dose rate and pyro-phoricity hazard. The procedure also required safety clearance by the regulatory authorities for the operations within the facility and for the transport of radioactive materials. The cartridge was dissolved in May 2009, 18 months after it was discovered. Based on the experience acquired, the retrieval of the uranium slugs was completed in March 2011 after a year of preparation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimizing environmental risk through the use of evaporation - 15090

At the Hanford Site, work is being done to utilize a portable exhauster to reduce the remaining free liquid in the older underground storage tanks. Use of an exhauster allows the water in the free liquid to be evaporated reducing the possibility that mobile contaminants will leak into the soil and groundwater. Transferring the remaining liquid waste to newer tanks requires major infrastructure installation. Currently one set of tanks is undergoing the retrieval of solids and liquids. This retrieval requires substantial infrastructure in order to mobilize and pump the waste to newer tanks. Reducing the remaining liquid waste by pumping would require much of the same retrieval infrastructure and is cost prohibitive. The use of a portable exhauster will require minimal infrastructure and is much more efficient. Past results have demonstrated that this technology can be successfully used on various sizes of underground storage tanks. A portable exhauster is planned to be connected to the one tank believed to be leaking and will be used to evaporate the remaining free liquid, beginning in 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Different Approaches for Clearance of Metals - a Comparison - 19079

Large quantities of contaminated and potentially contaminated metals are generated during the lifetime of nuclear installations, especially when they are dismantled and demolished. In many countries, clearance for recycling is considered Best Practice for the management of metals which are contaminated or potentially contaminated. In some countries, such as Sweden, it has become a legal requirement to recycle metals and other materials when it is safe to do so and the cost is reasonable. Therefore, multiple management routes are available with the aim of establishing a graded approach. These include general (unconditional) clearance, conditional (specific) clearance of surface contaminated metals, conditional clearance of metal ingots after treatment in a licensed facility and in some cases, recycling inside the nuclear sector. Kemakta Konsult AB recently derived rounded clearance limits for the conditional clearance of scrap metal for re-melting from the decommissioning of Swedish nuclear sites, on behalf of the Swedish Radiation Safety Authority (SSM). The calculations used the RP89 exposure scenarios, but the parameters were adjusted to reflect normal practice in the Swedish scrap metal and recycling industries. The study found that, for most of the 39 radionuclides judged to be relevant, the rounded clearance levels were the same as or higher than those in RP 89. However, longer transport times in Sweden compared to the ones used for RP 89 resulted in lower rounded clearance levels for three gamma-emitting radionuclides, including Co-60, the most important radionuclide in terms of dose exposure. Cyclife Sweden AB has, through more than 40 years of operation of the metal treatment facility at the Studsvik industrial site, significant experience of the practical implementation of clearing metal ingots as well as metallic strap, in total about 50,000 tonnes. A previous study confirms very low radiological impact to the receivers of the ingots and to the general public under the current procedures and conditions for clearance. The production of steel ingots for recycling in the Cyclife plant involves pre-treatment (segmentation and decontamination) followed by melting. Certain nuclides, like Cs-137 and alpha nuclides, are transferred to the secondary waste (slag and filter dust) in the melting process. The non-separated nuclides are homogenized in the ingot. The radionuclides that are present in the ingots are expected to remain in the metal during re-melting at metal works. The general approach of [1] together with specific information for typical ingots has been used to further verify the radiological implications of applying conditional clearance of ingots. This paper provides a background, present the studies performed, give an overview of the findings and the overall result including a comparison between different approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Defense Waste Processing Facility (DWPF) Higher Fissile Content Glass

The Accelerated Basin De-inventory (ABD) Program has been proposed as an alternative for future spent nuclear fuel (SNF) and nuclear material processing at the Savannah River Site (SRS). This approach would change the baseline H-Canyon (HCAN), Concentrate, Storage, and Transfer Facility (CSTF), and Defense Waste Processing Facility (DWPF) operations. The ABD Program would require that all domestic and foreign research reactor SNF currently at SRS be dissolved, stored, and then transferred to CSTF without the recovery of uranium. Preliminary assessments in the ABD Program plan have shown that ~5000 extra SRS high-level waste (HLW) canisters would be produced if the fissile mass loading remains at the current 897 g/m 3 limit; however, increasing the limit to 2500 g/m 3 would result in ~520 extra canisters. Thus, the ABD Program plan requires an increase of the DWPF fissile mass loading limit to 2500 g/m 3 to minimize canister production. DWPF considers the following isotopes in the calculation of fissile mass loading: U-233, U-235, Pu-239 and Pu-241.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The HRA/Solarium Project: Feedback Based on 20 Years of Experience in Treatment of Medium Level Waste - 20185

Since the 1980's the management of the historical site of Mol has been transferred to the National Agency for Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS). Belgoprocess is entrusted by ONDRAF/NIRAS with the operational waste management and site remediation. One of the major challenges has been the characterization, treatment and conditioning of approximately 200 m{sup 3} of medium level waste. These waste packages were stored in poor conditions in storage vaults ('HRA') or concrete containers ('Solarium'). They have been produced in various research programs and reactor operations at the Belgian nuclear energy research centre SCK.CEN, isotope production, decontamination and dismantling operations from the 1960's up to the 1980's. Despite the limited volume, this historical waste consists of a great variation of waste characteristics and waste configurations. To tackle these liabilities, a new processing facility was built in the 1990's to allow safe transfers, handling, characterization and treatment of these packages. Also some auxiliary facilities have been built to deal with the by-products, like emptied concrete containers. The engineering of the installation, safety procedures and (characterization) methodology that has been developed generically have been proved to be successful. Nevertheless, the specific nature of some items made it necessary to organize a step-by-step treatment in distinct campaigns in which some relevant extra (safety) measures had to be taken into account. This dynamic approach made it possible to process a great variety of waste types in order to to ensure that this legacy is no longer left for subsequent generations. After about 20 years of operations, there has been a great build-up of experience and feed-back concerning the waste management of these specific waste streams. Some cases will be highlighted to specify the approach followed for treatment of e.g.: - Na/NaK containing equipment; - spent radioactive sources; - fuel element residues; - medium level waste originating from activation experiments; - radium bearing medium level waste originating from Ac-227 production research. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives

Belgium can rely on significant experience in the field of decontamination and decommissioning of nuclear facilities. Several projects are ongoing and include research reactors (BR3, Thetis), uranium and MOX fuel fabrication plants (FBFC International, Belgonucleaire), fuel reprocessing facilities (Eurochemic) and radwaste processing facilities (Belgoprocess). Additional projects are expected in the coming years with the planned final shutdown of the oldest nuclear power reactor units. Two national authorities are involved in the decontamination and decommissioning process of nuclear facilities. The FANC (together with its subsidiary Bel V) is concerned for all matters related to nuclear safety and radiation protection, while NIRAS/ONDRAF is concerned for all matters related to radioactive waste and fuel management and financial provisions. These attributions ensure that all safety and material concerns are addressed and that both the licensees and the national authorities bear their own responsibilities. They rely on an existing regulatory framework covering both the procedural and the technical aspects of the decontamination and decommissioning activities. However, opportunities for regulatory improvement were raised after some recent events in Belgium, among which the bankruptcy of a nuclear company producing radioisotopes, involving numerous additional interested parties in a complex judiciary context. Amendments in the current regulations are considered to increase the prerogatives of the authorities regarding the management of radioactive waste by a licensee, the transfer of an operating license from an operator to another, and the general decommissioning strategy of a facility. Furthermore, a dedicated 'waste and decommissioning' working group within WENRA defined new reference levels applying to the decontamination and decommissioning of nuclear facilities. Belgium committed to include these requirements explicitly in its national legislation, even though most of them were already included in the existing decommissioning authorizations. Amendments will cover the safety provisions inherent to the decontamination and decommissioning phase, such as the decommissioning strategy, the qualification of techniques, the experience feedback valorization, the periodic safety reviews, the radioactive waste management, or the final characterization of the sites. Additionally, requirements regarding the authorization process will be detailed, such as the content of the licensee's application file or the structure of the safety report covering the decontamination and decommissioning phase. These changes will contribute to a more secure regulatory framework for all interested parties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗