Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNDERGROUND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

313 records · Page 18

Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗

Hawaiʻi Urban Development: Mapping Urban Infrastructure and Linkages to Wastewater Impacts across Hawaiʻi

Coastal ecosystems and human health across the Hawaiʻian islands are under threat from cesspools and other unpermitted wastewater infrastructure. Cesspools, or home sewage systems that hold wastewater effluent in porous concrete containers underground, discharge raw, untreated sewage directly into waterways. In fact, it is estimated that approximately 88,000 cesspools release 55 million gallons of raw sewage into Hawaiʻi’s waterways each day. Our partners, The Nature Conservancy, Hawaiʻi Regional Office (TNC) and University of Hawaiʻi, Mānoa (UHM), are heavily involved with the implementation and impact of Act 125, which was passed in 2017 by Hawaiʻi State Legislature to help combat these effects. This requires the conversion of cesspools to be upgraded and either converted to approved onsite disposal systems or connected to a sewer system so that the wastewater may be treated and to avoid leaching into the groundwater. Thus, identifying and locating cesspool and other unpermitted wastewater infrastructure is key to state and partner goals. Utilizing NASA Earth observations including Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), and Landsat 9 OLI-2 imagery, as well as pre-classified Sentinel-2 Multispectral Instrument (MSI) imagery in Esri’s Living Atlas, our team showcased the various perspectives that wastewater pollution research can use to assist in identifying and tracking urban development and concrete condition. This process was demonstrated by utilizing supervised object-based classification models, calculating various urban indices, and finding building size estimates to calculate effluent levels. Additionally, providing our partners with a GIS Methodology that can be built on to reach their future needs.

urban classification↗

Picosecond Clock Synchronization Across A 7-Node Metropolitan Scale Quantum Network

Quantum networking protocols relying on interference and precise time-of-flight measurements require high precision clock synchronization. This study describes the design, implementation, and characterization of two optical time transfer methods in a metropolitan-scale quantum networking research testbed. The first technique called active electronic stabilization (ELSTAB), was able to achieve sub-picosecond time deviation (TDEV) at integration times between 1 s and 105s over multiple different fiber lengths of both underground and aerial deployed fiber. The second technique, White Rabbit-Precision Time Protocol (WR-PTP), was able to achieve 10-picosecond TDEV’s over similar fiber lengths at comparable integration times. Environmental fluctuations affected the stability of clock synchronization over deployed fiber. These fluctuations resulted in path delay gradients, chromatic dispersion, polarization drift, and optical power variations. The results from this study will inform future work in the development of compensation methods essential for enabling experimental research in developing practical quantum networking protocols.

synchronization↗

Contribution to the technique of landing large airships. Part I

Many treatises in regard to construction of airship sheds are lacking in data on air currents, for which reason this phase of the problem will be here thoroughly discussed in connection with the accompanying photographs of currents.

AIRSHIPS - SIEMENS SHUCKERT (GERMAN)↗