Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

20 Meter Solar Sail Analysis and Correlation

This paper describes finite element analyses and correlation studies to predict deformations and vibration modes/frequencies of a 20-meter solar sail system developed by ATK Space Systems. Under the programmatic leadership of NASA Marshall Space Flight Center's In-Space Propulsion activity, the 20-meter solar sail program objectives were to verify the design, to assess structural responses of the sail system, to implement lessons learned from a previous 10-meter quadrant system analysis and test program, and to mature solar sail technology to a technology readiness level (TRL) of 5. For this 20 meter sail system, static and ground vibration tests were conducted in NASA Glenn Research Center's 100 meter diameter vacuum chamber at Plum Brook station. Prior to testing, a preliminary analysis was performed to evaluate test conditions and to determine sensor and actuator locations. After testing was completed, an analysis of each test configuration was performed. Post-test model refinements included updated properties to account for the mass of sensors, wiring, and other components used for testing. This paper describes the development of finite element models (FEM) for sail membranes and masts in each of four quadrants at both the component and system levels, as well as an optimization procedure for the static test/analyses correlation.

Taleghani, B. K.↗

Evaluating the Viability of Compact and Portable X-Ray Systems for an Exploration Medical System in a Ground Demonstration

MOTIVATION FOR INCLUDING X-RAY CAPABILITIES For upcoming exploration missions, the need for enhanced medical care becomes critical due to extended mission durations, significant communication delays, and minimal evacuation opportunities. Previous evidence by our team has revealed that among the 119 medical conditions targeted for management during spaceflight within NASA Exploration Medical Capability’s IMPACT Condition List, at least 36 could benefit from radiography (XR). Utilizing XR for diagnosis and management is hypothesized to significantly improve management of crew health by enabling the immediate evaluation and confirmation of potential injuries or illnesses. Beyond clinical applications, XR also holds potential for non-destructive testing (NDT). This includes applications such as assessing the structural integrity of the spacecraft, analyzing surface and meteorite samples, and inspecting onboard electronics. THREE CANDIDATE X-RAY SYSTEMS CHOSEN FOR GROUND DEMONSTRATION The Exploration Medical Capability Element (ExMC) and the Exploration Medical Integrated Product Team (XMIPT) of the Mars Campaign Office initiated early background work for ground demonstrations. In FY21, ExMC published a Concept of Operations to guide requirements development. By FY23, XMIPT and yet2, a technology scouting and open innovation consulting firm, had completed a market survey and trade study to identify potential miniature XR systems. Selection criteria included commercial-off-the-shelf availability, low mass and volume, and regulatory compliance. The top three candidate devices—Remedi REMEX-KA6, MinXray Impact, and FujiFilm Xair—were acquired to characterize the requirements and capabilities of each device. To facilitate testing, phantoms, and radiographic personal protective equipment (PPE) were purchased, and a dedicated space was designated for XRS usage at Glenn Research Center. During this presentation, the mass, volume, and power requirements for each of the three piloted devices are revealed, as well as information regarding the detector, mA, and kV of the devices. GOAL AND OBJECTIVES OF A MINI XRS GROUND DEMONSTRATION The primary goal of ExMC/XMIPT technology demonstrations is to bridge the gap in available, flight-ready medical device technology by flight-testing diagnostic and treatment technologies essential for managing medical conditions during exploration missions. These technologies must adhere to vehicle constraints such as mass, volume, power, and data requirements, integrate seamlessly with medical decision-support tools, and support increasingly Earth-independent operations. There are three main objectives for the future ground demonstration of these three devices. First, we aim to determine the full capabilities of these three miniature XR systems within the context of the spaceflight environment. While medical applications are the primary focus for the miniature XR, a comprehensive exploration of non-medical uses has been initiated by an XMIPT-sponsored NASA SPARK campaign to identify collaborators. Second, we plan to establish criteria and to use insights gained from evaluating each miniature XR against those criteria to select the most suitable system among the three candidates. Third, we intend to evaluate their suitability for flight certification, which includes assessing its durability for launch, reentry, and exposure to high background radiation, as well as its compatibility with existing data architecture systems. Numerous subject matter experts from NASA and partner institutions will support these objectives.

C A Haddix↗

NASA Technology Demonstrations Missions Program Overview

The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry, more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.

Turner, Susan↗

Pharmacodynamics of Promethazine in Human Subjects

Promethazine (PMZ) is the drug of choice for the treatment of symptoms associated with space motion sickness in astronauts. Side effects of PMZ include sedation, dizziness and cognitive performance impairment. In this study, we examined pharmacodynamics (PD) in human subjects and validated methods for evaluating cognitive performance effects of medications in space. METHODS: PMZ (12.5,25, and 50 mg) or placebo was administered by IM injection to human subjects in a randomized double-blind treatment design. Samples and data were collected for 72 h post dose. PD evaluation was performed using a battery of performance tests administered using WinSCAT (Windows based Space Cognitive Assessment Test) on a laptop computer, and ARES (ANAM Readiness Evaluation System) on a PDA, plasma concentrations of PMZ were measured using a LC-MS method. RESULTS: Results indicate a linear correlation between PMZ concentration and cognitive performance parameters (p<0.01). Test accuracy decreased and test completion time and response time increased significantly with increasing plasma PMZ concentration. CONCLUSIONS: These results suggest a concentration dependent decrement in cognitive performance associated with PMZ. WinSCAT and ARES are sensitive tools for the assessment PMZ PD and may be applicable for such evaluations with other neurocognitive drugs.

Gatlin, K. T.↗

Design, Integration, Certification and Testing of the Orion Crew Module Propulsion System

The Orion Crew Module Propulsion Reaction Control System is currently complete and ready for flight as part of the Orion program's first flight test, Exploration Flight Test One (EFT-1). As part of the first article design, build, test, and integration effort, several key lessons learned have been noted and are planned for incorporation into the next build of the system. This paper provides an overview of those lessons learned and a status on the Orion propulsion system progress to date.

McKay, Heather↗

Current Status and Future Plans for Electric Motors and Drives at NASA

Current Status and Future Plans for Electric Motors and Drives at NASA: Our work advances propulsion for aircraft while reducing energy consumption, noise, emissions and the cost of air travel. We are committed to investigating the use of alternative energy sources and improving the safety and expediency of flight. Electrified Aircraft Propulsion (EAP) is the use of propulsors (propellers or fans) driven by electric motors to propel aircraft ranging from air taxis to subsonic transports. NASA is developing technology, aircraft concepts, test aircraft, and ground test facilities to turn this idea from science fiction to reality. Specifically, motors and/or generators (Electric machines) are needed on all electrified aircraft. And NASA is sponsoring or performing work to achieve power densities 2-3 times the state of the art for machines in the MW or larger class. Three major machine types are being developed: permanent magnet, induction, and wound field. Power converters are also an essential component in most EAP aircraft concepts, as they are used to convert from ac to dc power, or vice versa. Silicon carbide and gallium nitride convertors are being developed with conventional cooling as well as a cryogenically cooled converter. Future plans include demonstrating integrated flight-ready systems in both ground and flight tests; collaborating with and leveraging ARPA-E EAP programs; and supporting FAA standards development for market acceptance and safety.

Powertrain↗

Current Status and Future Plans for Electric Motors and Drives at NASA

Our work advances propulsion for aircraft while reducing energy consumption, noise, emissions and the cost of air travel. We are committed to investigating the use of alternative energy sources and improving the safety and expediency of flight. Electrified Aircraft Propulsion (EAP) is the use of propulsors (propellers or fans) driven by electric motors to propel aircraft ranging from air taxis to subsonic transports. NASA is developing technology, aircraft concepts, test aircraft, and ground test facilities to turn this idea from science fiction to- reality. Specifically, motors and/or generators (Electric machines) are needed on all electrified aircraft. And NASA is sponsoring or performing work to achieve power densities 2-3 times the state of the art for machines in the MW or larger class. Three major machine types are being developed: permanent magnet, induction, and wound field. Power converters are also an essential component in most EAP aircraft concepts, as they are used to convert from ac to dc power, or vice versa. Silicon carbide and gallium nitride convertors are being developed with conventional cooling as well as a cryogenically cooled converter. Future plans include demonstrating integrated flight-ready systems in both ground and flight tests; collaborating with and leveraging ARPA-E EAP programs; and supporting FAA standards development for market acceptance and safety.

Aircraft↗

Kilopower: Small and Affordable Fission Power Systems for Space

The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.

Space nuclear power↗

Comparison of Cognitive Performance Tests for Promethazine Pharmacodynamics in Human Subjects

The objective of this study is to compare cognitive function tests, Automated Neurological Assessment Metrics (ANAM) based Readiness Evaluation System (ARES(Registered TradeMark)) on a Palm Pilot and Windows based Spaceflight Cognitive Assessment Tool (WinSCAT(Registered TradeMark)) on a personal computer (PC) to assess performance effects of promethazine (PMZ) after administration to human subjects. In a randomized placebo-controlled cross-over design, subjects received 12.5, 25, and 50 mg intramuscular (IM) PMZ or a placebo and completed 14 sessions with WinSCAT(Registered TradeMark) (v. 1.26) and ARES(Registered TradeMark) (v. 1.27) consecutively for 72 h post dose. Maximum plasma concentrations (4.25, 6.25 and 13.33 ng/ml) were linear with dose and were achieved by 0.75, 8, and 24 h after dosing for the three doses, respectively. No significant differences in cognitive function after PMZ dosing were detected using WinSCAT(Registered TradeMark), however, tests from ARES(Registered TradeMark) demonstrated concentration dependent decrements in reaction time associated with PMZ dose.

Vaksman, Z.↗

Fabrication and Deployment Testing of Solar Sail Quadrants for a 20-Meter Solar Sail Ground Test System Demonstration

A 20-meter Scalable Square Solar Sail (S(sup 4)) System was produced and successfully completed functional vacuum testing in NASA Glenn's Space Power Facility at Plum Brook Station Ohio in May 2005. The S(sup 4) system was designed and developed by ATK Space Systems, and the design and production of the Solar Sails for this system was carried out by SRS Technologies. The S(sup 4) system consists of a central structure with four deployable carbon fiber masts that support four triangular sails. SRS has developed an effective and efficient design for triangular sail quadrants that are supported at three points and provide a flat reflective surface with a high fill factor. This sail design is robust enough for deployments in a one atmosphere, one gravity environment and incorporates several advanced features including adhesiveless seaming of membrane strips, compliant edge borders to allow for film membrane cord strain mismatch without causing wrinkling and low mass (3% of total sail mass) ripstop. This paper will outline some of the sail design and fabrication processes and the mature production, packaging and deployment processes that have been developed. This paper will also detail the successful ambient and vacuum testing of the sails and the ATK spacecraft structure. Based on recent experience and testing, SRS is confidant that high Technology Readiness Level (TRL) 5-6 solar sails in the 40-120-meter size range with areal density in the 4-5 grams per square meters (sail minus structure) range can be produced with existing technology. Additional film production research will lead to further reductions in film thickness to less than 1 micron enabling production of sails with areal densities as low as 2.0 grams per square meters using the current design, resulting in a system areal densities as low as 5.3 grams per square meters (sail and structure). These areal densities are low enough to allow nearly all of the Solar Sail missions that have been proposed by the scientific community. The fundamental technologies required to produce these systems has been demonstrated on the 20-meter S(sup 4) sails that have recently completed ground testing demonstrating a mature and technology suitable for incorporation into future flight validation and future mission. Solar Sails can support NASA's Vision for Space Exploration by allowing communication satellite orbits that can maintain continuous communication with the polar regions of the Moon and Mars and to support solar weather monitoring to provide early warning of solar flares and storms that could threaten the safety of astronauts and other spacecraft.

Laue, Greg↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Human in the Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chambers) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere capable of 14.7 to 8 psi total pressure and 21 to 32% oxygen concentration, life support systems (food, air, and water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon, Mars). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international, industrial and academic partners.

Henninger, Donald L.↗

Saving Space and Time: The Tractor That Einstein Built

In 1984, NASA initiated the Gravity Probe B (GP-B) program to test two unverified predictions of Albert Einstein s theory of general relativity, hypotheses about the ways space, time, light, and gravity relate to each other. To test these predictions, the Space Agency and researchers at Stanford University developed an experiment that would check, with extreme precision, tiny changes in the spin direction of four gyroscopes contained in an Earth satellite orbiting at a 400-mile altitude directly over the Earth s poles. When the program first began, the researchers assessed using Global Positioning System (GPS) technology to control the attitude of the GP-B spacecraft accurately. At that time, the best GPS receivers could only provide accuracy to nearly 1 meter, but the GP-B spacecraft required a system 100 times more accurate. To address this concern, researchers at Stanford designed high-performance, attitude-determining hardware that used GPS signals, perfecting a high-precision form of GPS called Carrier-Phase Differential GPS that could provide continuous real-time position, velocity, time, and attitude sensor information for all axes of a vehicle. The researchers came to the realization that controlling the GP-B spacecraft with this new system was essentially no different than controlling an airplane. Their thinking took a new direction: If this technology proved successful, the airlines and the Federal Aviation Administration (FAA) were ready commercial markets. They set out to test the new technology, the "Integrity Beacon Landing System," using it to automatically land a commercial Boeing 737 over 100 times successfully through Real-Time Kinematic (RTK) GPS technology. The thinking of the researchers shifted again, from automatically landing aircraft, to automating precision farming and construction equipment.

Source record↗

Propellant Densification Ground Testing Conducted for Launch Vehicles

The NASA Glenn Research Center at Lewis Field has taken the lead in the development of practical densified cryogenic propellants for launch vehicle applications. The technology of subcooling cryogenic propellants below their normal boiling point to produce a denser fluid is one of the key process technologies necessary to meet the challenge of single-stage-to-orbit and reusable launch vehicles. Densified propellants are critical to lowering launch costs because they enable more propellant to be packed into a given unit volume, thus improving the performance by reducing the overall size and weight of the launch vehicle. This two-pronged research and test program has evolved into (1) conducting tank loading tests using densified liquid hydrogen and (2) developing two large-scale propellant densification systems that will be performance tested next year at Glenn. The propellant-loading test program was undertaken at Glenn in coordination with Lockheed Martin Michoud Space Systems. In this testing, the liquid hydrogen recirculation and densification process was simulated, and the thermal stratification of the densified propellant was recorded throughout the tank. The test article was a flight-weight tank constructed from composite materials similar to those to be used on the X-33 launch vehicle. The tank geometry as designed by Lockheed Martin had two cylindrical lobes with a center septum. Liquid hydrogen flow rate, pressure data, and temperature data plotted over time were collected while the subscale tank was filled with 27 R (15 K) densified liquid hydrogen propellant. This testing has validated mathematical models and demonstrated the readiness of densified propellant technology for near-term use. It marks the first time that such a process has been carried out with a multiple-lobe, flight-similar tank. Glenn researchers have also been working on providing a process and critical test data for the continuous production of densified liquid hydrogen (LH2) and densified liquid oxygen (LO2). Each densification production process uses a high-efficiency, subatmospheric boiling bath heat exchanger to cool the working fluid. A near triple-point hydrogen boiling bath is used to condition and subcool hydrogen to 27 R (15 K), and a nitrogen boiling bath is used to cool the liquid oxygen to 120 R (66.7 K). Multistage centrifugal compressors operating at cryogenic inlet conditions maintain the heat exchanger bath vapor pressure below 1 atm. The LO2 propellant densification unit shown in the photograph has a 30 lb/sec capacity, whereas the LH2 unit was designed to process 8 lb/sec of propellant. Each densification unit will be transported to Glenn's South Forty area after all fabrication work is completed sometime late next year. There the LO2 and LH2 densifier performance tests will be conducted with another larger Lockheed Martin tank designated the Structural Test Article (STA). This liquid oxygen tank is a full-scale, flight-weight, prototype aluminum tank designed for the X-33. It has a capacity of 20,000 gallons of LO2. The tank loading and recirculation testing planned for next year with STA will provide the data necessary for full-scale development of propellant densification technology.

Tomsik, Thomas M.↗

Launch Vehicle Sizing Benefits Utilizing Main Propulsion System Crossfeed and Project Status

To meet the goals for a next generation Reusable Launch Vehicle (RLV), a unique propulsion feed system concept was identified using crossfeed between the booster and orbiter stages that could reduce the Two-Stage-to-Orbit (TSTO) vehicle weight and Design, Development, Test and Evaluation (DDT&E) costs by approximately 25%, while increasing safety and reliability. The Main Propulsion System (MPS) crossfeed water demonstration test program addresses all activities required to reduce the risks for the MPS crossfeed system from a Technology Readiness Level (TRL) of 2 to 4 by the completion of testing and analysis by June 2003. During the initial period, that ended in March 2002, a subscale water flow test article was defined. Procurement of a subscale crossfeed check valve was initiated and the specifications for the various components were developed. The fluid transient and pressurization analytical models were developed separately and successfully integrated. The test matrix for the water flow test was developed to correlate the integrated model. A computational fluid dynamics (CFD) model of the crossfeed check valve was developed to assess flow disturbances and internal flow dynamics. Based on the results, the passive crossfeed system concept was very feasible and offered a safe system to be used in an RLV architecture. A water flow test article was designed to accommodate a wide range of flows simulating a number of different types of propellant systems. During the follow-on period, the crossfeed system model will be further refined, the test article will be completed, the water flow test will be performed, and finally the crossfeed system model will be correlated with the test data. This validated computer model will be used to predict the full-scale vehicle crossfeed system performance.

Chandler, Frank↗

Low Density Supersonic Decelerator Parachute Decelerator System

The Low Density Supersonic Decelerator Project has undertaken the task of developing and testing a large supersonic ringsail parachute. The parachute under development is intended to provide mission planners more options for parachutes larger than the Mars Science Laboratory's 21.5m parachute. During its development, this new parachute will be taken through a series of tests in order to bring the parachute to a TRL-6 readiness level and make the technology available for future Mars missions. This effort is primarily focused on two tests, a subsonic structural verification test done at sea level atmospheric conditions and a supersonic flight behind a blunt body in low-density atmospheric conditions. The preferred method of deploying a parachute behind a decelerating blunt body robotic spacecraft in a supersonic flow-field is via mortar deployment. Due to the configuration constraints in the design of the test vehicle used in the supersonic testing it is not possible to perform a mortar deployment. As a result of this limitation an alternative deployment process using a ballute as a pilot is being developed. The intent in this alternate approach is to preserve the requisite features of a mortar deployment during canopy extraction in a supersonic flow. Doing so will allow future Mars missions to either choose to mortar deploy or pilot deploy the parachute that is being developed.

Low Density Supersonic Decelerator (LDSD)↗

Subscale Hardware-In-The-Loop Results for Hybrid Electric Turbofan Controls Use Cases

NASA is investigating hybrid electric turbine engine systems for commercial transport aircraft due to the potentially significant improvements hybrid electric technology offers in performance, fuel consumption, and operational and design flexibility. Recently, the technology has been tested at full scale in partnership with industry and advanced to Technology Readiness Level 4. This presentation will focus on a recent subscale hardware-in-the-loop test of an open source turbofan engine model developed by NASA. The Advanced Geared Turbofan 30,000 lbf – electrified (AGTF30-e) engine is used as a reference model to demonstrate control system design and use cases for an example mild hybrid electric system with no large-scale energy storage. This model is run in real-time in NASA’s Hybrid Propulsion Emulation Rig (HyPER) and is used to drive an emulation of the turbomachinery system using subscale electric machines. This dynamic scaled shaft emulation interacts with a subscale (<100 kW) hybrid system consisting of electric machines, motor controllers, and a programmable electronic load. Specific use cases demonstrated include the use of Turbine Electrified Energy Management to improve operation during transients, megawatt-scale power extraction from the AGTF30-e, and power transfer between engine spools. Results related to the effectiveness of hybrid systems are qualitatively compared to results from industry testing.

Hybrid↗