Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Building Stronger State Energy Partnerships with the U.S. Department of Energy

This final technical report details the results of total work efforts and progress made from July 2000 - July 2008 under the National Association of State Energy Officials (NASEO) cooperative agreement DE-FC26-00NT40802, Building Stronger State Energy Partnerships with the U.S. Department of Energy. Major topical project areas in this final report include work efforts in the following areas: Rebuild America/Energy Smart Schools, Higher Education Initiative, Winter/Summer Fuels Outlook Conferences, Energy Emergency, Clean Energy Integration, Energy Star, and Office of Electricity Delivery and Energy Reliability. All required deliverables have been provided to the National Energy Technology Laboratory and DOE program officials.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

REMOVAL OF LEGACY PLUTONIUM MATERIALS FROM SWEDEN

U.S. Department of Energy’s National Nuclear Security Administration (NNSA) Office of Global Threat Reduction (GTRI) recently removed legacy plutonium materials from Sweden in collaboration with AB SVAFO, Sweden. This paper details the activities undertaken through the U.S. receiving site (Savannah River Site (SRS)) to support the characterization, stabilization, packaging and removal of legacy plutonium materials from Sweden in 2012. This effort was undertaken as part of GTRI’s Gap Materials Program and culminated with the successful removal of plutonium from Sweden as announced at the 2012 Nuclear Security Summit. The removal and shipment of plutonium materials to the United States was the first of its kind under NNSA’s Global Threat Reduction Initiative. The Environmental Assessment for the U.S. receipt of gap plutonium material was approved in May 2010. Since then, the multi-year process yielded many first time accomplishments associated with plutonium packaging and transport activities including the application of the of DOE-STD-3013 stabilization requirements to treat plutonium materials outside the U.S., the development of an acceptance criteria for receipt of plutonium from a foreign country, the development and application of a versatile process flow sheet for the packaging of legacy plutonium materials, the identification of a plutonium container configuration, the first international certificate validation of the 9975 shipping package and the first intercontinental shipment using the 9975 shipping package. This paper will detail the technical considerations in developing the packaging process flow sheet, defining the key elements of the flow sheet and its implementation, determining the criteria used in the selection of the transport package, developing the technical basis for the package certificate amendment and the reviews with multiple licensing authorities and most importantly integrating the technical activities with the Swedish partners.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Muon Cooling and R&D for the Muon Collider - A 5 Year Plan for the US

The Neutrino Factory and Muon Collider Collaboration and the Fermilab Muon Collider Task Force have recently submitted a proposal to the US Department of Energy Office of High Energy Physics to deliver a Design Feasibility Study for a Muon Collider after a 5 year R&D program. This paper presents a brief physics motivation for and the description of a Muon Collider facility and then discusses in some detail the technical components of the proposal with respect to the muon ionization cooling R&D needed for an Energy-Frontier, high luminosity Muon Collider.

43 PARTICLE ACCELERATORS↗

Mitigation of Severe Accident Consequences Using Inherent Safety Principles

Sodium-cooled fast reactors are designed to have a high level of safety. Events of high probability of occurrence are typically handled without consequence through reliable engineering systems and good design practices. For accidents of lower probability, the initiating events are characterized by larger and more numerous challenges to the reactor system, such as failure of one or more major engineered systems and can also include a failure to scram the reactor in response. As the initiating conditions become more severe, they have the potential for creating serious consequences of potential safety significance, including fuel melting, fuel pin disruption and recriticality. If the progression of such accidents is not mitigated by design features of the reactor, energetic events and dispersal of radioactive materials may result. For severe accidents, there are several approaches that can be used to mitigate the consequences of such severe accident initiators, which typically include fuel pin failures and core disruption. One approach is to increase the reliability of the reactor protection system so that the probability of an ATWS event is reduced to less than 1 x 10-6 per reactor year, where larger accident consequences are allowed, meeting the U.S. NRC goal of relegating such accident consequences as core disruption to these extremely low probabilities. The main difficulty with this approach is to convincingly test and guarantee such increased reliability. Another approach is to increase the redundancy of the reactor scram system, which can also reduce the probability of an ATWS event to a frequency of less than 1 x 10-6 per reactor year or lower. The issues with this approach are more related to reactor core design, with the need for a greater number of control rod positions in the reactor core and the associated increase in complexity of the reactor protection system. A third approach is to use the inherent reactivity feedback that occurs in a fast reactor to automatically respond to the change in reactor conditions and to result in a benign response to these events. This approach has the advantage of being relatively simple to implement, and does not face the issue of reliability since only fundamental physical phenomena are used in a passive manner, not active engineered systems. However, the challenge is to present a convincing case that such passive means can be implemented and used. The purpose of this paper is to describe this third approach in detail, the technical basis and experimental validation for the approach, and the resulting reactor performance that can be achieved for ATWS events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A Detailed Wind Turbine Blade Cost Model

This technical report describes a detailed blade cost model for wind turbine blades in the range of 30 to 100 meters in length. The model estimates the bill of materials, the number of labor hours and the cycle time, and the costs related to direct labor, overhead, buildings, tooling, equipment, maintenance, and capital. The model applies to multimegawatt wind turbine blades manufactured via vacuum-assisted resin transfer molding, which is the most commonly adopted manufacturing method for modern wind turbine blades. The model is implemented both in a large Excel file and in Python. The latter is freely available in the repository of the Wind-Plant Integrated System Design and Engineering Model (WISDEM[R]) github.com/WISDEM. WISDEM is a multidisciplinary analysis and optimization design framework developed at the National Renewable Energy Laboratory. This blade cost model represents a valuable tool to run design optimization studies for wind turbines. In this report, the model is first presented with its approach and assumptions and then computes the costs of three blades, namely the 33-meter-long Wind Partnership for Advanced Component Technologies (WindPACT) study blade, the 63-meter-long International Energy Agency (IEA) Wind Task 37 land-based reference wind turbine blade, and the 100-meter-long SNL-100-03 blade developed at Sandia National Laboratories.

17 WIND ENERGY↗

Wabash CarbonSAFE: Detailed Site Characterization Plan, Task 11.0, Technical Report

Wabash CarbonSAFE established that commercial-scale CO 2 storage in the Potosi Dolomite –Maquoketa Group storage complex associated with the Wabash Valley Resources (WVR) plant site near Terre Haute, IN is highly feasible. The CarbonSAFE project team performed this evaluation through extensive data acquisition and analysis including 2D seismic reflection data, wireline logs, well testing, and core/cuttings from the Wabash #1 stratigraphic test well (now plugged and abandoned). This document summarizes work detailed in separate Wabash CarbonSAFE reports and consolidates the geologic characterization, well testing, and storage complex modeling results for the Mt. Simon Sandstone and Potosi Dolomite, two distinct reservoirs characterized at the Wabash CarbonSAFE project site. The report then presents recommendations for the next steps for site characterization, identifies data gaps for future activities, and provides an overall assessment of site potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systematic Technology Evaluation Program for SiC-based BWR Channel Box

Silicon carbide (SiC) –based accident-tolerant fuel (ATF) cladding of light water reactors (LWRs) has become a topic of great interest in nuclear material development since the Fukushima Dai-ichi Nuclear Power Plant accident. Extensive development of SiC cladding has identified benefits of the concept, including its inherent accident resistance and neutronic performance. Advancements achieved during the development of SiC-based ATF cladding have made it attractive for use in accident-tolerant cores of LWRs. In this document, we consider the use of SiC-based materials to replace the zirconium alloy used for the channel boxes of boiling water reactors. Both accident resistance and prevention of the bowing observed in current grades of channel boxes are needs driving the exploration of a new channel box system. To provide a pathway for channel box development, this document lays out (1) a current technology overview, (2) the technology gap, and (3) a systematic technology evaluation plan. The objectives of the technology evaluation plan are to address key feasibility issues revealed by the knowledge gap analysis and to contribute to advancing the technology readiness level. Further development will be required in the technology implementation phase. The technology evaluations include understanding the behavior of channel boxes under both normal and off-normal conditions, identifying potential mitigation strategies for the issues if necessary, and improving channel box performance based on the knowledge obtained. The structure of the technology evaluation plan and each task are shown in Figure S.1. The knowledge gap analysis identified key research areas, including irradiation effects, hydrothermal corrosion, accident behavior, and design and manufacture. These are common issues between SiC-based channel boxes and SiC-based fuel cladding, although technical evaluations specific for the channel box components are required. This document also describes details of the technical feasibility evaluation methods and plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Results for the September Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 September bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request. The following facts pertaining to the WAC are drawn from the analytical results, including analytical uncertainty, provided in this report. 1) WAC LIMITS and TARGETS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC LIMITS and TARGETS; 2) Measured average concentrations of nitrate, nitrite and total mercury are approximately 24%, 9% and 12% of the WAC LIMITS, respectively; 3) Measured average concentrations of Tc-99 and I-129 are approximately 19% and 20% of the WAC LIMITS, respectively; 4) All other radionuclide average concentrations are at 4% or less of the WAC LIMITS and TARGETS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science Case for a Wide Field-of-View Very-High-Energy Gamma-ray Observatory in the Southern Hemisphere

This white paper outlines the wide science program that would be enabled by the construction of a next-generation gamma-ray observatory using ground-level particle detectors in the Southern Hemisphere: the Southern Gamma-ray Survey Observatory (SGSO). This science case rests on four main pillars: unveiling galactic and extragalactic particle accelerators, monitoring the transient sky at very high energies, probing particle physics beyond the Standard Model, and the characterization of the cosmic ray flux. Several currently ongoing efforts to advance the technical performance of such an observatory will briefly be discussed in Section 8. However, the focus of this document will be on the broad spectrum of astrophysical questions SGSO will address, rather than the details of the technical implementation of a detector. To assess the potential to specific astrophysical applications, a “straw man” detector design is used. This design provides an increase in effective area, number of channels, and a lower energy threshold compared to existing observatories such as the HAWC gamma-ray observatory. Intrinsic figures of merit that quantify the potential performance of SGSO (like angular resolution and background rates) are based on the demonstrated performance of HAWC. Details on this design and its performance are given in Section 3. This approach is chosen as a balance to obtain both an ambitious and feasible performance, suitable to a wide range of applications, while keeping the assumptions about the technical implementation to a minimum. It is foreseen that some applications could benefit from enhanced performance over the straw man design in certain energy ranges; the feasibility and need of reaching enhanced performance will be discussed case by case. The outcome of the studies presented in this document will give an overview of the scientific potential of a next-generation gamma-ray observatory in the southern hemisphere and provide guidance to the finalization of the design of such an observatory.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Rooftop Solar Photovoltaic Technical Potential in the United States. A Detailed Assessment

How much energy could be generated if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models--one for small buildings and one for medium and large buildings--and populate them with geographic variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.

14 SOLAR ENERGY↗

2017 Publications Demonstrate Advancements in Wind Energy Research

In 2017, wind energy experts at the National Renewable Energy Laboratory (NREL) made significant strides to advance wind energy. Many of these achievements were presented in articles published in scientific and engineering journals and technical reports that detailed research accomplishments in new and progressing wind energy technologies. During fiscal year 2017, NREL wind energy thought leaders shared knowledge and insights through 45 journal articles and 25 technical reports, benefiting academic and national-lab research communities; industry stakeholders; and local, state, and federal decision makers. Such publications serve as important outreach, informing the public of how NREL wind research, analysis, and deployment activities complement advanced energy growth in the United States and around the world. The publications also illustrate some of the noteworthy outcomes of U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and Laboratory Directed Research and Development funding, as well as funding and facilities leveraged through strategic partnerships and other collaborations.

17 WIND ENERGY↗

Fusion Energy Sciences Exascale Requirements Review. An Office of Science review sponsored jointly by Advanced Scientific Computing Research and Fusion Energy Sciences, January 27-29, 2016, Gaithersburg, Maryland

The additional computing power offered by the planned exascale facilities could be transformational across the spectrum of plasma and fusion research — provided that the new architectures can be efficiently applied to our problem space. The collaboration that will be required to succeed should be viewed as an opportunity to identify and exploit cross-disciplinary synergies. To assess the opportunities and requirements as part of the development of an overall strategy for computing in the exascale era, the Exascale Requirements Review meeting of the Fusion Energy Sciences (FES) community was convened January 27–29, 2016, with participation from a broad range of fusion and plasma scientists, specialists in applied mathematics and computer science, and representatives from the U.S. Department of Energy (DOE) and its major computing facilities. This report is a summary of that meeting and the preparatory activities for it and includes a wealth of detail to support the findings. Technical opportunities, requirements, and challenges are detailed in this report (and in the recent report on the Workshop on Integrated Simulation). Science applications are described, along with mathematical and computational enabling technologies. Also see http://exascaleage.org/fes/ for more information.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The 2014 Sandia Nonlinear Mechanics and Dynamics Summer Research Institute

A collaborative research institute was organized and held at Sandia Albuquerque for a period of six weeks. This research institute brought together researchers from around the world to work collaboratively on a set of research projects. These research projects included: developing experimental guidelines for studying variability and repeatability of nonlinear structures; decoupling aleatoric and epistemic uncertainty in measurements to improve dynamic predictions; a numerical round robin to assess the performance of five different numerical codes for modeling systems with strong nonlinearities; and an assessment of experimentally derived and numerically derived reduced order models. In addition to the technical collaborations, the institute also included a series of seminars given by both Sandians and external experts, as well as a series of tours and field trips to local places of scientific and engineering importance. This report details both the technical research and the programmatic organization of the 2014 Sandia Nonlinear Mechanics and Dynamics Summer Research Institute.

36 MATERIALS SCIENCE↗

Benchmark Imagery FY11 Technical Report

This report details the work performed in FY11 under project LL11-GS-PD06, “Benchmark Imagery for Assessing Geospatial Semantic Extraction Algorithms.” The original LCP for the Benchmark Imagery project called for creating a set of benchmark imagery for verifying and validating algorithms that extract semantic content from imagery. More specifically, the first year was slated to deliver real imagery that had been annotated, the second year to deliver real imagery that had composited features, and the final year was to deliver synthetic imagery modeled after the real imagery.

58 GEOSCIENCES↗