Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Simulating Distributed Energy Resource Responses to Transmission System-Level Faults Considering IEEE 1547 Performance Categories on Three Major WECC Transmission Paths

This study performs a large quantity of transmission and distribution simulations for three regions in the Western Interconnection along with final transmission simulations informed by distribution simulation results. Results find that the type of ride-through implemented by distributed energy resources (DERs) is a significant factor to the overall power system response to transmission-level faults. This impact is particularly high for transmission-level faults that depress voltage levels for high numbers of substations (i.e., for cases that experience large regional voltage sags). Because of the programmed nature of the ride-through of IEEE 1547-compliant DERs, the potential for large reductions in real power injection is possible based on IEEE 1547 interpretation and specific implementation. In this study, we made a first attempt to determine the quantity of DERs affected by a variety of transmission-level faults as well as a granular response of distribution-simulated DERs to a few types of IEEE 1547-2003 interpretations and IEEE 1547-2018 voltage ride-through categories. The distribution-informed transmission studies show that the category of IEEE 1547 adherence, particularly with the new 2018 standard, can have a significant impact on the amount of DER-based generation lost following transmission-level fault events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2020 State of the Science Report, Chapter 8: Encounters of Marine Animals with Marine Renewable Energy Device Mooring Systems and Subsea Cables

Many marine renewable energy (MRE) technologies, including floating or midwater wave and tidal devices, require mooring systems (i.e., mooring lines and anchors) to maintain their position within the water column or on the sea surface. In the case of some devices such as tidal kites, these lines and cables can be highly dynamic. An array of non-bottom-mounted devices may also include transmission cables within the water column interconnecting devices to one another, or to offshore substations or hubs on the seabed. The potential for these lines and cables to present hazards for marine animals that may become entangled or entrapped in them, or confused by their presence remains an issue of uncertainty. The degree to which mitigation to avoid or reduce entanglement risk might be required for future MRE installations is yet to be determined, pending greater understanding of the actual nature of the risk. In this chapter, the entanglement or entrapment of a marine animal is defined as the cause to become caught in a system without possibility of escaping. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-8-moorings

16 TIDAL AND WAVE POWER↗

Flexible Large Power Solid State Transformer (FLP-SST)

A large power transformer (LPT) is a major component in the electric power system grid. With the passage of time their reliability in terms of failure and service maintenance has been a big concern. According to a report by EPRI, various agencies have emphasized, and recent events have demonstrated, the critical nature of power transformers in the face of possible high-impact, low-frequency (HILF) events. The HILF events include intentional malicious events (e.g., physical attacks, cyber-attacks, coordinated attacks, electromagnetic pulse weapons, and others), natural disasters (e.g., hurricanes, earthquakes, severe geomagnetic disturbances, etc.), and non-intentional or accidental events such as nuclear power plant accidents. With aging, the line frequency transformers (LFTs) are also prone to failure due to insulation degradation, coolant leakage, mechanical failure, inadequate maintenance, etc. and thus poses a bigger threat to the electrical grid. Moreover, these transformers are custom made to fit the needs at the substation and weighs approximately between 100-400 tons, hence are neither interchangeable nor stored as a spare one. Hence reasonable efforts need to be made regarding the replacement of the LPT with a more feasible technology that does not pose similar issues. The concept of Flexible Large Power Solid-State Transformer (FLPSST) has addressed the aforementioned issues to provide an economical solutions for the failure of LPTs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Penetration Power Electronics Grid: Modeling and Simulation Gap Analysis

Increased penetration of power electronics in the grid is happening through development of high-power drives (like in Type 3 or 4 wind turbines, industrial drives, etc.), high-voltage direct current (HVdc) systems, flexible alternating current transmission systems (FACTS), energy storage systems (ESSs), inverter-based renewables like solar and wind, electric vehicle chargers, and other technologies. Ongoing research and development in new power electronic technologies including, but not limited to, solid-state power substations (SSPS), extreme fast charging (XFC), solid-state transformers, and multi-port power electronics that integrate multiple sources/loads will further increase penetration levels. To ensure stakeholders can integrate high penetration of power electronic technologies safely and reliably requires tools and methods to assess and evaluate their impact on the grid. Objectives: This report surveys, assesses, and analyzes commercially available and open-source tools that can support the assessment and evaluation of power electronics in future grids with high penetration levels. The study includes aspects that range from power flow analysis to dynamics evaluation (including hardware-in-the-loop – HIL testing) for such systems. The challenges and gaps associated with the current generation of toolsets available to assess the technical impact of introducing high penetration of power electronics are reported. The method is summarized in Figure ES-1.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Early-Time (E1) High-Altitude Electromagnetic Pulse Effects on Transient Voltage Surge Suppressors

Determining the effectiveness of surge and pulse protection devices in the United States power grid against effects of a High-Altitude Electromagnetic Pulse (HEMP) is crucial in determining the present state of grid resilience. Transient Voltage Surge Suppressors (TVSS) are used to protect loads in substations from transient overvoltages. Designed to mitigate the effects of lightning, their response to a HEMP event is unknown and was determined. TVSSs were tested in two unique configurations using a pulser that generates pulses in the tens of nanoseconds scale to determine their protective capability as well as to determine their self-resilience against HEMP pulses. Testing concluded that TVSS devices adequately protect against microsecond scale pulses like lightning but do not protect against pulses resembling HEMP events. It suggests that TVSS devices should not be relied upon to mitigate the effects of HEMP pulses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust Distributed State Estimator for Interconnected Transmission and Distribution Networks (Final Report RPPR-1)

This project’s objective is to develop a combined transmission and distribution state estimator which accounts for very large system size and model complexity (by way of distributing the computations) and large number of solar PV units connected to the distribution system on multiple feeders. The project not only provides a robust formulation and solution to this problem but also tests the solution by implementing it on a well-established large utility system. It introduces several improvements with respect to the state of the art in existing state estimation software: (a) The developed state estimator (SE) allows robust and accurate monitoring of bidirectional flows in distribution systems which result due to the distributed energy sources which are not observable and thus not incorporated in generation dispatch; (b) Large utility systems with tens of thousands of transmission buses and hundreds of thousands of distribution nodes are difficult to model as a single integrated system. This shortcoming is addressed by developing a “scalable distributed computational framework” which allows splitting the ultra large system models into several small subsystems and coordinating their solution by a robust and practical state estimation formulation; (c) Measurement errors irrespective of their locations are detected and removed by the developed state estimator. Historically, transmission and distribution systems were analyzed and operated as two independent systems. Given the non-transposed short feeder sections, unevenly loaded phases, strictly radial configuration and unidirectional power flows in the absence of remote generation, distribution system analysis was customized to account for these characteristics. However, some of these assumptions are no longer valid (non-radial configuration, bidirectional power flows) and thus distribution system analysis should be revisited. Furthermore, in the past, the interaction between the transmission and distribution systems was quite passive, where distribution substations were modeled as lumped loads in the transmission system model. With substantial generation injected by renewable generation located in the distribution systems, such modeling will no longer be accurate. The developed state estimator facilitates proper monitoring of the interactions between the transmission and distribution systems and enables smart dispatch of these units which are made observable by the state estimator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Tools for Attack Surface Reduction

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic well being. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyber attacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal is to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The team consisted of leading experts from two major universities – Iowa State University, Washington State University – complemented by reputed researchers from two DOE national laboratories – Pacific Northwest National Lab, and Argonne National Lab, one major utility vendor GE Global Research, and one utility partner – Cedar Falls Utilities (CFU). The team members have proven track record of successful academic-industry collaboration in interdisciplinary R&D projects, and bring onboard some of the best state-of-the-art testbed resources, industry-grade SCADA/EMS/DMS environment for experimentation and field demonstration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Physical Sciences Vistas Issue 3 2021

In this issue, highlights of our contributions to mission operations include descriptions of the following. • How exact and scrupulous planning in concert with sophisticated science enabled a first-ever direct measurement of a radionuclide with a half-life as short as six days. The work, which included operations at the Los Alamos Neutron Science Centers (LANSCE) Weapons Neutron Research Facility and the Isotope Production Facility’s hot cell facility, is a boon for both astrophysics and weapons science. • An introduction to Christie Davis and her role in ensuring the Lab’s execution of simultaneous excellence. • A look at progress by AOT’s Target and Experimental Support Team in reclaiming long-dormant space in a radiological controlled area for new work improving target systems for the Lujan Center. • A story showcasing a cross-organizational effort to minimize the directorate’s legacy and environmental footprint. Staff from across the Lab joined together to ensure the safe and efficient disposal of Rocky Flats legacy waste stored in a transportainer at the Target Fabrication Facility. • How the Lab’s Utilities and Infrastructure experts collaborated with stakeholders in our directorate to safety execute preventive maintenance on the LANSCE mesa’s large electrical substation. The Safe Conduct of Research principles provided a common framework for the planning and process. • A description of the resources called upon and the procedures undertaken by MPA to inventory the division’s time-sensitive chemicals, including the careful and conscientious response of an alert team member when something seemed amiss.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

GMLC Southeast Regional Consortium: Technology Driven Improvements to Power Grid Resiliency

Recognizing that electric grid challenges can differ by geographical regions across the US, the Department of Energy (DOE) created a pioneer regional partnership to provide technical assistance to stakeholders facing grid modernization challenges. The southeast regional teams will transfer technologies developed under DOE auspices to stakeholders for testing, evaluation, and market validation. Regional members will help define critical challenges and pave the way for transition of technologies to the commercial sector. Using the depth and expertise at Oak Ridge National Laboratory, Savannah River National Laboratory, University of Tennessee’s CURENT, CAPER and the Clemson 20 MVA Electrical Grid Laboratory—along with critical industry partners, such as Duke Energy, TVA, Southern Company, EPB, and Santee Cooper—the Southeast Regional Consortium team will conduct collaborative research to advance the state of the grid in the Southeast region and improve power system resiliency to enhance responsiveness, enable faster restoration of power, and increase distributed energy resource (DER) concentrations. This report provides details of the technical research and demonstration projects accomplished by Oak Ridge National Laboratory (ORNL) as part of the Southeast Regional Consortium. Specifically, ORNL analyzed the application of optical current and voltage measurements impedance relays which would enable step distance protection to be deployed on distribution systems. This would improve the precision of determining the geographic location of faults, increase network topology flexibility, and allow bi-directional power flow. Next, ORNL deployed time sensitive networking technology on the EPB fiberoptic data network to study the impact of increased sensor traffic on existing supervisory control and data acquisition data. The deterministic latency and high bandwidth were demonstrated by remotely inspecting a substation using a drone with full HD streaming video operated at the EPB Control Center. Finally, a new application-based communication and control system developed at ORNL call CSEISMIC was tested for future deployment on the EPB Control Center microgrid using a hardware-in-the-loop testbed that was also developed at ORNL. The controller was able to successfully optimize ancillary service when the microgrid is connected to the distribution network. The seamless islanding, resynchronization, and reconnection of the microgrid was also demonstrated through the testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effect of GPS Manipulation to Traditional and Next Generation Relay Protection (Final Report)

This project’s objective is to test the effect of GPS timing variations on relay protection algorithms to determine vulnerabilities and the associated hazards to the electric grid. This will focus on time domain protection which utilizes traveling waves measured on the transmission lines to detect the fault within a tower span. This requires the use of GPS to sync the two substations and can be vulnerable to GPS manipulation. However, the effects of GPS manipulation are not a commonly known risk. Therefore, this LDRD will address the risks of GPS manipulation for on a new protective relay technology that has the potential to change protective relaying. For time domain protection a GPS resilient architecture was implemented and tested for time domain protective relays through a direct serial fiber connection between the two relays. This allows for one relay to be the master and provide synchronization outside of timestamp for traveling wave protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SRNL EPC Installation Report

During the week of August 25th, 2021, three Electric Phenomenon Cluster (EPC) sensors were installed at the Savannah River Site (SRS) owned, Dominion Energy (DE) operated 504-2G substation.

47 OTHER INSTRUMENTATION↗

DSO+T: Transactive Energy Coordination Framework (DSO+T Study: Volume 3)

This report describes a transactive energy coordination scheme designed to integrate into existing day-ahead and real-time wholesale energy markets. This scheme was evaluated in the Distribution System Operator with Transactive (DSO+T) study to assess the engineering and economic performance of the transactive energy coordination of a large-scale deployment of distributed energy resources (DER). Transactive agents were developed for a range of DERs (heating, ventilation, and air conditioning units, water heaters, batteries, and electric vehicles) that optimize flexibility over a 48-hour horizon and adjust their strategy in response to changes in real-time prices. A transactive energy coordination scheme, executed by a DSO retail market operator, aggregates these DER bids from participating customers and clears them against a DSO supply curve using a double auction market mechanism. The process of constructing the price-quantity DSO supply curve includes distribution-level transportation constraints (for example, substation congestion limits) and forecast locational marginal price of the DSO’s connected transmission node. The resulting day-ahead and real-time quantities are then bid into a competitive wholesale market operated by an independent system operator. This report also details additional capabilities for proper marketplace simulation such as wholesale price, weather, and load forecasting. The report concludes with a discussion of lessons learned and key design features required to ensure successful operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

A Scalable Quantum Cryptography Network for Protected Automation Communication (Final Report)

This is the final report for a CEDS-funded project aimed at developing a new quantum technology for securing utility communication networks used to control and monitor electrical grid equipment. Securing these control networks represents a unique challenge as the performance of the security solution has a direct impact on the stability and reliability of the electrical grid. Traditional, software-based solutions - developed for information networks - are not suitable for utility control networks because they introduce latency, require burdensome maintenance and upgrades, are often incompatible with legacy equipment, and introduce operational complexity that reduces grid reliability. Consequently, many U.S. utilities do not use existing solutions and, instead, protect their critical control networks through the careful isolation and obscuration of their networked equipment. With more utilities embracing grid automation, the attack surface that utilities must defend from hackers has grown to an unmanageable size. To address this situation, Qubitekk and its partners proposed and developed a hardware-based solution that can secure critical control networks without negatively impacting grid performance. This new solution is based on quantum key distribution (QKD) techniques that guarantee secure key generation and distribution across a utility control network. Through deployment and field testing of a prototype QKD system, we have shown that this solution delivers long-term network security, is technically feasible to implement and maintain on a utility’s distribution substation network and does not negatively impact grid operations. In addition, the project has identified and solved key challenges associated with generating, transmitting, and measuring coherent photonic quantum states on a real-world fiber optic network. These additional findings are playing a critical role in advancing quantum networks for quantum computing applications. An overview of the QKD prototype development effort, field testing activities and results, and additional findings relevant to emerging quantum networks are presented in this report.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗