Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholders Meeting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis (CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks, planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but workarounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues in the future.

Erica E. Bruno↗

The Dual-Axis Radiographic Hydrodynamic Test Facility Capability eXpansion (DCX) Strategy

This document details the strategy proposed to meet the National Nuclear Security Administration (NNSA) requirement for the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility Sustainment and Modernization projects identified in multiple NNSA Stockpile Stewardship and Management Plan (SSMP) reports to Congress [NNSA, 2020; 2021; 2022; 2023; 2024]. DARHT has become indispensable for the certification of the primaries of U.S. nuclear weapons since the current U.S. moratorium halted underground nuclear testing more than 30 years ago. However, aging facilities, evolving technology, and other issues are limiting or threatening the capability of DARHT to meet NNSA’s expanding mission needs now and into the future. This DARHT Capability eXpansion (DCX) strategy was developed to address NNSA needs by extending DARHT’s reliability and resilience, increasing the quality and quantity of DARHT data, and enabling hydrodynamic measurements in complex environments. The strategy can be implemented through integration of line-item projects, acquisition of major items of equipment, and other actions coordinated with the execution of the SSMP. This strategy document is intended for U.S. Government officials, particularly authorizers, appropriators, and program leaders. It may also be furnished to DARHT users, customers, collaborators, stakeholders, and visitors as needed

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Key Considerations for Adoption of Technical Codes and Standards for Battery Energy Storage Systems in Thailand

Battery storage is “technology that enables power system operators and utilities to store energy for later use. A battery energy storage system (BESS) is an electrochemical device that charges (or collects energy) from the grid or a power plant and then discharges that energy at a later time to provide electricity or other grid services when needed”. As countries in Asia consider the inclusion of BESS in their power systems to meet policy objectives, renewable energy goals, increase resilience, and expand energy access, there is an opportunity to learn from the experiences of other regions and jurisdictions that have developed more advanced storage markets and deployment methodologies. This report presents global best practices of codes, standards, and interconnection procedures developed to support the safe and reliable deployment of BESS. Several relevant case studies highlight current efforts to ensure safe operation of BESS and showcase potential pathways for adoption of relevant codes and standards. Specifically, this report is intended to support the Thailand Office of Energy Regulatory Commission (OERC) and other stakeholders in their efforts to develop technical codes and standards to govern the installation and operation of BESS; it may also be utilized as a guide for other countries as interest in the deployment of BESS technologies continues to grow.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Shelter Island, New York, Energy Reliability Assessment and Local Generation Options

Shelter Island's Green Options Committee (GOC), an all-volunteer committee tasked with considering all environmental conservation issues, requested technical assistance under the U.S. Department of Energy (DOE)-funded Energy Technology Innovation Partnership Project (ETIPP). The primary goals of this technical assistance project included: 1. Informing the GOC about energy use trends within the community as well as distributed solar, wind and storage opportunities; 2. Providing additional resources and technical feasibility information for geothermal, agrivoltaics and tidal energy; 3. Supporting the development of a community engagement plan; and 4. Supporting collaboration between the GOC and PSEG in order to find mutually beneficial follow-on projects. Assistance from NLR to help the GOC meet these overall project goals was provided through the following primary tasks: 1. Collaborate with the local utility in order to collect energy use data and inform the community on energy use patterns through a baseline assessment; 2. Technical analysis of distributed renewable and resiliency opportunities (solar, wind and storage) that best align with the community's energy priorities; 3. Provide high level feasibility support for future renewable energy scenarios that include agrivoltaic solutions, tidal energy, and geothermal projects on Shelter Island, and 4. Integrate all findings into a Community Outreach presentation to help the GOC engage with community stakeholders to build support and awareness of chosen resilience strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis(CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks,planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but work-arounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues.

ERICA E. BRUNO↗

Integrated, Coordinated, Open, and Networked (ICON) Science to Advance the Geosciences: Introduction and Synthesis of a Special Collection of Commentary Articles

Abstract The sciences struggle to integrate across disciplines, coordinate across data generation and modeling activities, produce connected open data, and build strong networks to engage stakeholders within and beyond the scientific community. The American Geophysical Union (AGU) is divided into 25 sections intended to encompass the breadth of the geosciences. Here, we introduce a special collection of commentary articles spanning 19 AGU sections on challenges and opportunities associated with the use of ICON science principles. These principles focus on research intentionally designed to be Integrated, Coordinated, Open, and Networked (ICON) with the goal of maximizing mutual benefit (among stakeholders) and cross‐system transferability of science outcomes. This article (a) summarizes the ICON principles; (b) discusses the crowdsourced approach to creating the collection; (c) explores insights from across the articles; and (d) proposes steps forward. There were common themes among the commentary articles, including broad agreement that the benefits of using ICON principles outweigh the costs, but that using ICON principles has important risks that need to be understood and mitigated. It was also clear that the ICON principles are not monolithic or static, but should instead be considered a heuristic tool that can and should be modified to meet changing needs. As a whole, the collection is intended as a resource for scientists pursuing ICON science and represents an important inflection point in which the geosciences community has come together to offer insights into ICON principles as a unified approach for improving how science is done across the geosciences and beyond.

Goldman, A. E.↗

Detecting the undetected: Dealing with non-routine events using advanced M&V meter-based savings approaches

In a rapidly evolving energy industry, utilities are dealing with new challenges like integrating distributed energy resources and market saturation for advanced lighting retrofits. Demand-side management programs require new approaches to meet aggressive carbon reduction goals. Advanced measurement & verification (M&V) is an energy data analysis method using smart meter data in combination with analytics to quantify energy efficiency project savings. Advanced M&V shows great promise for supporting next generation commercial programs including retro commissioning, multi-measure retrofits, and behavior change programs. Advanced M&V captures real project impacts at the meter, but sometimes non-project events can also impact consumption (so-called “non-routine events” [NREs]). Accurately detecting and accounting for NREs is important for reducing uncertainty of savings estimates and helps manage investment risk for different stakeholders (e.g., utilities, building owners, ESCOs). Recent research has shown promise in establishing data-driven techniques to identify and adjust for NREs, but fundamental questions still remain, such as: how can you distinguish NREs from acceptable noise in energy consumption profiles? What is the frequency and magnitude of NREs? Can their detection and adjustment be automated and streamlined? This paper documents the state of the art in NRE quantification and analysis. The results of research to quantify the frequency, nature and direction of NREs, and methods and metrics for determining a trigger threshold for taking action on NREs are presented. The paper also documents the latest technical guidance on application of NRE detection and adjustment methods.

Fernandes, Samuel↗

Novel Carbon Storage Monitoring Methods

Conference presentation at American Institute of Chemical Engineers (AIChE) Annual Meeting, San Diego, California, October 27–31, 2024. We presented a high-level overview of many novel and sustainable carbon storage monitoring methods that are at various stages of planning or demonstration to accelerate the deployment of CCS technologies at future CCS sites across the United States. Our work impacts the general CCS industry by providing novel and more sustainable methods for tracking CO 2 plume migration and performing assurance monitoring. Our work primarily benefits three parties: 1) CCS community members through knowledge sharing of lessons learned; 2) CCS operators through commercialization of additional methods, including improvements on workflows and simplification of fieldwork; and 3) stakeholders of CCS projects through implementation of low-impact and more autonomous monitoring solutions.

02 PETROLEUM↗

Licensing, Regulations and Developing Guidance for Nuclear Technology Deployment for Embarking countries in Africa

The African region is witnessing an increased number of countries at different stages of implementing or considering the introduction of peaceful nuclear power programs to meet the demand of their rapidly growing economies as well as clean energy needs. Grid size, cost, licensing, and regulations will be some of the challenges to deploying larger power reactors. A key element of the regulatory framework will be the inclusion of nuclear security information and assurance that security is integrated into the license review process.As each country continue to implement and consider different reactor designs from several vendors, the significance of customer knowledge of licensing, Regulations, and guidance document to facilitate the deployment and operational needs for nuclear technology cannot be over-emphasized. This special session will bring together a selected panel of key stakeholders and policymakers from embarking countries in Africa to participate in a panel discussion to share their experience in the licensing, regulations, and development of guidance for power plant deployment. The session will also consider and identify potential gaps that may affect the licensing and regulatory applications for the future nuclear infrastructure. As well, the panel will promote regional networking and communication to increase capacities in readiness for the potential deployment of additional technology, such as Small Modular Reactors.

Dahunsi, Stephen↗

Calculating Behind-the-Meter Energy Storage Incentives on an Avoided Cost Basis

Behind-the-meter (BTM) energy storage offers the potential for shared investment by utilities and their customers, in which both parties share in the costs and benefits of battery investment. Several utilities and a handful of states have begun providing incentives to help customers purchase BTM energy storage, and in exchange, operate that battery on behalf of the customer to realize grid benefits such as meeting peak capacity needs. But there is wide variation in the value and structure of these incentives, suggesting a lack of clarity on the value of BTM storage to the grid and to non-participating customers who fund the incentives for participating customers. This paper provides an objective framework for establishing BTM energy storage incentives based on the avoided cost of generation from a marginal, gas-fired peaking plant. It also conducts several sensitivity analyses to see how those avoided costs vary with emissions pricing, gas prices, plant heat rates, and utility capital structures. This work may be of use to utilities, regulators, and energy system stakeholders in providing a value-based framework for BTM incentive programs that can be used in the absence of policy guidance.

Twitchell, Jeremy B.↗

Deeper Dive into Interoperability and Its Implications for LunaNet Communications and Navigation Services

The Artemis program being developed by United States’ (US) National Aeronautics and Space Administration (NASA) is developing the capabilities to return humans to the Moon and establish an initial base camp and associated infrastructure with extensive contributions from international and commercial partners. In planning for cislunar exploration and science missions, space agencies are collaborating to enable communications, networking, and Positioning, Navigation, and Timing (PNT) systems—called LunaNet—to exchange information and provide services to cislunar spacecraft and space systems, thus helping each other to achieve their shared goals. To achieve commonality and lower cost for mutual benefit, the strategy of interoperability is being adopted to help fit all the pieces together and function smoothly. Facilitating interoperability should benefit lunar missions by providing the ability to operate in a collaborative environment similar to the terrestrial Internet. Interoperability allows them to share information, navigate safely despite increasing radio frequency congestion, and follow common processes and procedures for effective joint operations. Unlike prior government-dominated efforts, this ecosystem is expected to include and benefit for-profit (commercial) businesses, non-profit organizations, and academic institutions as active stakeholders. Ultimately, the goal is to enable a cislunar ecosystem of service providers and users to contribute to and/or utilize infrastructure and capabilities to achieve mission objectives that span the full range of human endeavors while supporting a variety of business models. This approach enables a Systems of Systems (SoS), such as a Network-of-Networks, to be sustainable in the context of the LunaNet ecosystem as systems evolve over time in technologies, standards, components, and user applications. This paper reports on the results of an effort to help frame the development of the international LunaNet architecture by providing a canonical definition of interoperability broad enough to meet these needs, examining architectural and operational implications of the definition, and exploring interoperability strategies and tactics to deploy and evolve the services proposed for cislunar exploration and science missions.

interoperability↗

Advancing uncertainty characterization for understanding projected water scarcity in multi-sector, multi-actor river basins across scales.

Invited Talk at AGU Fall Meeting 2023 Modeling how human institutions and infrastructure interact with the water cycle is essential to better understand the vulnerability, and resilience of water resources systems from the local to the global scale. This is especially true when investigating multi-sector, multi-actor responses to the effects of long-term changes and short-term shocks. It is also well recognized that uncertainty present throughout the modeling cycle (e.g., in data, functional relations, and model coupling approaches) limits our ability to trace the interactive dynamics of human-water systems, as well as to quantify their implications for management and planning. Systems with large numbers of diverse stakeholders further compound this challenge, as uncertain drivers and complex dynamics might have very disparate effects on water users. The work presented is conducted through the Integrated Multisector Multiscale Modeling (IM3) Science Focus Area, which explores how human and natural systems co-evolve in response to change. Through this multi-year effort, we have developed exploratory modeling methods to better characterize how the uncertain human and natural drivers of water scarcity yield consequential vulnerabilities in institutionally complex, multi-sectoral systems. This talk will specifically present on a series of uncertainty characterization experiments performed in the Upper Colorado River Basin, a sub-basin of the Colorado with thousands of water users. These complementary and systematic experiments are aimed at understanding: How are various uncertain stressors (e.g., climate change, demand growth) affecting the diverse water users of this basin in terms of water shortage? What are the key drivers of this shortage for each user? Methods and results from this work are used to address additional questions on the ability of adaptation to modulate the effects of these uncertain drivers, and on their compounding effects across spatial scales and through sectoral interactions.

Hadjimichael, Antonia↗

Models for Facilitating Government-Funded Activities in the Post-ISS LEO Ecosystem

NASA is preparing for the retirement of the ISS and transition of LEO activities to one or more Commercial LEO Destinations (CLDs) by 2030. This transition necessitates new models for connecting NASA and other government-funded users of the LEO environment to platforms and opportunities. This paper describes for consideration six models for facilitating government-funded activities in the post-ISS LEO ecosystem. These six models are illustrative and represent a wide trade space of potential options, each relying on unique mechanisms for facilitating activities on one or more commercial LEO platforms or vehicles. We assessed each model across three possible future scenarios varying in number and diversity of LEO activities and commercial offerings, and across five stakeholder-driven model evaluation criteria. We present the highlights of the analysis, including ways to modify and strengthen each model. The Government Research Broker model performs best across all future scenarios, followed by Innovation Campus, Anchor Tenant, and Fee for Service. While Matchmaker and Institute Network exhibit positive aspects, these models perform most favorably in future scenarios with well-established communities and markets. While each model has strengths and weaknesses, no single model in its current form performs well across all criteria in all three future scenarios. NASA leadership can adjust models as desired to align closer to their priorities using combinations of unique model mechanisms. A model that meets leadership priorities is likely a combination of features from multiple models.

Erica Rodgers↗

Models for Facilitating Government-Funded Activities in the Post-ISS LEO Ecosystem

NASA is preparing for the retirement of the ISS and transition of LEO activities to one or more Commercial LEO Destinations (CLDs) by 2030. This transition necessitates new models for connecting NASA and other government-funded users of the LEO environment to platforms and opportunities. This paper describes for consideration six models for facilitating government-funded activities in the post-ISS LEO ecosystem. These six models are illustrative and represent a wide trade space of potential options, each relying on unique mechanisms for facilitating activities on one or more commercial LEO platforms or vehicles. We assessed each model across three possible future scenarios varying in number and diversity of LEO activities and commercial offerings, and across five stakeholder-driven model evaluation criteria. We present the highlights of the analysis, including ways to modify and strengthen each model. The Government Research Broker model performs best across all future scenarios, followed by Innovation Campus, Anchor Tenant, and Fee for Service. While Matchmaker and Institute Network exhibit positive aspects, these models perform most favorably in future scenarios with well-established communities and markets. While each model has strengths and weaknesses, no single model in its current form performs well across all criteria in all three future scenarios. NASA leadership can adjust models as desired to align closer to their priorities using combinations of unique model mechanisms. A model that meets leadership priorities is likely a combination of features from multiple models.

Erica Rodgers↗

Models for Facilitating Government-Funded Activities in the Post-ISS LEO Ecosystem

NASA is preparing for the retirement of the ISS and transition of LEO activities to one or more Commercial LEO Destinations (CLDs) by 2030. This transition necessitates new models for connecting NASA and other government-funded users of the LEO environment to platforms and opportunities. This paper describes for consideration six models for facilitating government-funded activities in the post-ISS LEO ecosystem. These six models are illustrative and represent a wide trade space of potential options, each relying on unique mechanisms for facilitating activities on one or more commercial LEO platforms or vehicles. We assessed each model across three possible future scenarios varying in number and diversity of LEO activities and commercial offerings, and across five stakeholder-driven model evaluation criteria. We present the highlights of the analysis, including ways to modify and strengthen each model. The Government Research Broker model performs best across all future scenarios, followed by Innovation Campus, Anchor Tenant, and Fee for Service. While Matchmaker and Institute Network exhibit positive aspects, these models perform most favorably in future scenarios with well-established communities and markets. While each model has strengths and weaknesses, no single model in its current form performs well across all criteria in all three future scenarios. NASA leadership can adjust models as desired to align closer to their priorities using combinations of unique model mechanisms. A model that meets leadership priorities is likely a combination of features from multiple models.

Erica Rodgers↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Product Lifecycle Management and the Quest for Sustainable Space Explorations

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting.

Caruso, Pamela W.↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.

Caruso, Pamela W.↗