Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Site Characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Nevada National Security Site Environmental Report Summary 2016

This document is a summary of the full 2016 Nevada National Security Site Environmental Report (NNSSER) prepared by the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/ NFO). This summary provides an abbreviated and more readable version of the full NNSSER. NNSA/NFO prepares the NNSSER to provide the public an understanding of the environmental monitoring and compliance activities that are conducted on the Nevada National Security Site (NNSS) to protect the public and the environment from radiation hazards and from potential nonradiological impacts. It is a comprehensive report of environmental activities performed at the NNSS and offsite facilities over the previous calendar year. The NNSS is currently the nation’s unique site for ongoing national security–related missions and high-risk operations. The NNSS is located about 65 miles northwest of Las Vegas. The approximately 1,360-square-mile site is one of the largest restricted access areas in the United States. It is surrounded by federal installations with strictly controlled access as well as by lands that are open to public entry. In 2016, National Security Technologies, LLC (NSTec), was the NNSS Management and Operations Contractor accountable for ensuring work was performed in compliance with environmental regulations. NNSS activities in 2016 continued to be diverse, with the primary goal to ensure that the existing U.S. stockpile of nuclear weapons remains safe and reliable. Other activities included weapons of mass destruction first responder training; the controlled release of hazardous material at the Nonproliferation Test and Evaluation Complex (NPTEC); remediation of legacy contamination sites; characterization of waste destined for the Waste Isolation Pilot Plant in Carlsbad, New Mexico, or the Idaho National Laboratory in Idaho Falls, Idaho; disposal of low-level and mixed low-level radioactive waste; and environmental research. Facilities and centers that support the National Security/Defense mission include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility (DAF), National Criticality Experiments Research Center (NCERC) located in the DAF, Joint Actinide Shock Physics Experimental Research (JASPER) Facility, Dense Plasma Focus (DPF) Facility located in the Los Alamos Technical Facility (LATF), and the Radiological/ Nuclear Countermeasures Test and Evaluation Complex (RNCTEC). Facilities that support the Environmental Management mission include the Area 5 Radioactive Waste Management Complex (RWMC) and the Area 3 Radioactive Waste Management Site (RWMS), which has been in cold standby since 2006.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repurposing Drilling Control Diagnostics for Subsurface Edge Detection and Boundary Advisement During Planetary Drilling

Informed decision-making during lunar drilling and sampling missions will require data monitoring tools and specialized ground data systems. Accurate and updated situational awareness, with ongoing data monitoring, is critical for timely responses by to incoming science data. Traverse plans and scheduled activities may need to be flexibly changed in order to react to unexpected data or situations. Unlike (for example) Mars missions, the relative lightspeed closeness of the Moon allows for near-real-time ground processing of incoming mission and instrument data. An Apollo-class lunar regolith drill will in a sense “travel” a meter or two vertically at a given subsurface characterization site. As the drill penetrates into lunar regolith, it is likely to encounter a range of material densities, orientations, fracture toughness, and (perhaps) ice percentages. Lunar drill telemetry can provide science teams with a valuable first look into the subsurface structure, the regolith bulk properties, and constituents at each drilled site. Real-time AI-based recognition and reaction to downhole situations has been developed for automated deeper drilling on Mars and beyond. We can leverage the same knowledge bases and pattern-matching as areal-time interpreter of the subsurface, a situational awareness tool during drilling operations. We recently (Sept. 2019) demonstrated this AI drilling monitoring and analysis capability, in control of in-situ drilling and sampling operations, mounted on a KREX-2 rover in Chile’s Atacama Desert. Terrestrial automated drilling log analyses in oil exploration have used similar machine learning techniques in classifying and identifying features in drilling logs –but these typically are designed assuming a drilling fluid influencing downhole measurements and data (permeability, resistivity). Drilling models and existing AI software designed to detect and respond to drilling faults and hard materials can be repurposed, for near-real-time (ground-based) interpretation of drilling telemetry –a potentially valuable advisory tool for strata boundaries and changes in drilling parameters. On the Moon, this approach could be used to study the structure and to some extent the composition of lunar regolith vs. borehole depth, based on recognizable variations in fracture hardness, drilling energy and penetration rates while actively drilling. Since the early 2000s, a series of increasingly-capable real-time drilling telemetry interpretation and characterization software tools have been developed. These subsurface models and software tools have monitored the real-time drilling data received, and automatically identified changes in drill behavior (e.g., encountering a harder target layer, bit inclusions, drill choking due to infall downhole, and others) correlating these with subsurface structures and features. We discuss the mappings between drill borehole parameters, faults or events detected, and modeled changes in rock layer boundaries, in examples drawn from field testing at analog sites in an Arctic impact crater, Rio Tinto, and Chile’s Atacama Desert. These demonstrate how subsurface structural boundaries led to fault detections and responses by the software.

drilling advisor↗

Modeling of time-lapse seismic monitoring using CO 2 leakage simulations for a model CO 2 storage site with realistic geology: Application in assessment of early leak-detection capabilities

Time-lapse surface seismic surveys have been widely used at carbon sequestration sites for site characterization, monitoring subsurface CO 2 plume migration, and detecting potential CO 2 leakage from a storage reservoir. Monitoring in the first permeable unit directly above the primary seal is important for early detection of CO 2 leakage. Forward modeling of time-lapse seismic data can be used to assess the utility of the seismic method for CO 2 leakage detection. We develop a workflow for forward modeling of time-lapse seismic data, including constructing seismic velocity models using flow simulation outputs, modeling of pre-stack and post-stack synthetic seismic data following seismic data processing sequence and analysis of processed synthetic time-lapse seismic data. We apply the forward modeling and analysis workflow to assessing the detectability and the earliest detection time of seismic monitoring using the hypothetical CO 2 leakage scenarios for a model geologic storage site with realistic geology. We then derive the detection thresholds using the simulated normalized root-mean-square (NRMS) differences for the no-leakage case at a range of signal-to-noise ratios, representing the background noise levels in seismic data. We then compare NRMS differences triggered by the CO 2 leakage to the detection thresholds at each time step to quantify the detectability and the earliest detection time of seismic monitoring. We analyze the effects of the acquisition parameters and elastic parameters on the produced synthetic seismic data and earliest detection time. Our modeling results indicate that high signal-to-noise ratio is needed to detect the CO 2 leakage at the model site. Minimizing the background noise in seismic data is crucial for improving the detectability of the seismic method. Increasing the shot density or increasing the dominant frequency of the source wavelet is likely to increase the possibility of the leakage detection and reduce the time needed for the detection. The elastic parameters used in the rock physics modeling have significant effects on the resultant seismic velocity models and synthetic seismic data, highlighting their critical roles in understanding and interpreting time-lapse seismic reflection data associated with CO 2 monitoring, verification and accounting activities.

58 GEOSCIENCES↗

ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT- CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS

The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations, addressing attenuation-based remedies at the Savannah River Site F Area and performance assessment for a representative waste tank, illustrate integration of linked ASCEM capabilities and initial integration efforts with tools from the Cementitious Barriers Partnership.

54 ENVIRONMENTAL SCIENCES↗

ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT – CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS

The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations, addressing attenuation-based remedies at the Savannah River Site F Area and performance assessment for a representative waste tank, illustrate integration of linked ASCEM capabilities and initial integration efforts with tools from the Cementitious Barriers Partnership.

DOE Environmental Management, advanced simulation,↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗

Helping Mother Earth Heal: Diné College and Enhanced Natural Attenuation Research at U. S. Department of Energy Uranium Processing Sites on Navajo Land

Dine College is a key stakeholder and partner with the U.S. Department of Energy in efforts to develop and implement sustainable and culturally acceptable remedies for soil and groundwater contamination at uranium mill tailings processing and disposal sites on Navajo Nation land. Through an educational philosophy grounded in the Navajo traditional living system which places human life in harmony with the natural world, the College has helped guide researchers to look beyond ­traditional engineering approaches and seek more sustainable remedies for soil and groundwater contamination at former uranium mill sites near Monument Valley, Arizona, and Shiprock, New Mexico. Students and researchers are asking first, what is Mother Earth already doing to heal a land injured by uranium mill tailings, and second, what can we do to help her? This guidance has led researchers to investigate applications of natural and enhanced attenuation remedies involving native plants – phytoremediation, and indigenous microorganisms – bioremediation. College faculty, student interns, and local residents have contributed to several aspects of the pilot studies including site characterization, sampling designs, installation and maintenance of plantings and irrigation systems, monitoring, and data interpretation. Research results look promising.

42 ENGINEERING↗

Zinc ion coordination as a modulating factor of the ZnuA histidine-rich loop flexibility: A molecular modeling and fluorescence spectroscopy study

Highlights: Black-Right-Pointing-Pointer Fluorescence data indicate that the His-loop of ZnuA interacts with Zn{sup +2} ions. Black-Right-Pointing-Pointer The ZnuA structural model proposed validates these spectroscopic findings. Black-Right-Pointing-Pointer It is proposed that a zinc loaded His-loop may facilitate the ZnuA-ZnuB recognition. -- Abstract: ZnuA is the soluble component of the high-affinity ZnuABC zinc transporter belonging to the ATP-binding cassette-type periplasmic Zn-binding proteins. The zinc transporter ZnuABC is composed by three proteins: ZnuB, the membrane permease, ZnuC, the ATPase component and ZnuA, the soluble periplasmic metal-binding protein which captures Zn and delivers it to ZnuB. The ZnuA protein contains a charged flexible loop, rich in histidines and acidic residues, showing significant species-specific differences. Various studies have established that this loop contributes to the formation of a secondary zinc binding site, which has been proposed to be important in the acquisition of periplasmic Zn for its delivery to ZnuB or for regulation of zinc uptake. Due to its high mobility the structure of the histidine-rich loop has never been solved by X-ray diffraction studies. In this paper, through a combined use of molecular modeling, mutagenesis and fluorescence spectroscopy, we confirm the presence of two zinc binding sites characterized by different affinities for the metal ion and show that the flexibility of the loop is modulated by the binding of the zinc ions to the protein. The data obtained by fluorescence spectroscopy have then be used to validate a 3D model including the unsolved histidine-rich loop.

60 APPLIED LIFE SCIENCES↗

Model Comparison and Uncertainty Quantification for Geologic Carbon Storage. The Sim-SEQ Initiative

Sim-SEQ is a model comparison initiative for geologic carbon storage (GCS). In Sim-SEQ, fifteen different modeling teams are developing conceptual models for flow and transport of an injected CO 2 plume at the Sim-SEQ study site (or the S-3 site) located near Cranfield, Mississippi. The objective of the project is to understand the sources of model uncertainty in GCS, and if possible, to quantify these uncertainties through comparison of the different conceptual models and also through comparison with observed data from the S-3 site. In this paper, we compare six different conceptual models of the S-3 site, and present a preliminary uncertainty analysis of these six models using a generalized linear model approach. We show that differences in model conceptualization and interpretation of site characterization data caus a significant range in predictions.

54 ENVIRONMENTAL SCIENCES↗

Optimized, Budget-constrained Monitoring Well Placement Using DREAM

Defining the ideal suite of monitoring technologies to be deployed at a carbon capture and storage (CCS) site presents a challenge to project developers, financers, insurers, regulators and other stakeholders. The monitoring, verification, and accounting (MVA) toolkit offers a suite of technologies to monitor an extensive range of parameters across a wide span of spatial and temporal resolutions, each with their own degree of sensitivity to changes in the parameter being monitored. Understanding how best to optimize MVA budgets to minimize the time to leak detection could help to address issues around project risks, and in turn help support broad CCS deployment. This paper presents a case study demonstrating an application of the Designs for Risk Evaluation and Management (DREAM) tool using an ensemble of CO 2 leakage scenarios taken from a previous study on leakage impacts to groundwater. Impacts were assessed and monitored as a function of pH, total dissolved solids (TDS), and trace metal concentrations of arsenic (As), cadmium (Cd), chromium (Cr), and lead (Pb). Using output from the previous study, DREAM was used to optimize monitoring system designs based on variable sampling locations and parameters. The algorithm requires the user to define a finite budget to limit the number of monitoring wells and technologies deployed, and then iterates well placement and sensor type and location until it converges on the configuration with the lowest time to first detection of the leak averaged across all scenarios. To facilitate an understanding of the optimal number of sampling wells, DREAM was used to assess the marginal utility of additional sampling locations. Based on assumptions about monitoring costs and replacement costs of degraded water, the incremental cost of each additional sampling well can be compared against its marginal value in terms of avoided aquifer degradation. Applying this method, DREAM identified the most cost-effective ensemble with 14 monitoring locations. Here, while this preliminary study applied relatively simplistic cost and technology assumptions, it provides an exciting proof-of-concept for the application of DREAM to questions of cost-optimized MVA system design that are informed not only by site-specific costs and technology options, but also by reservoir simulation results developed during site characterization and operation.

47 OTHER INSTRUMENTATION↗

Simulation of carbon dioxide injection at the FutureGen2.0 site: Class VI permit model and local sensitivity analysis

Numerical simulation was conducted to evaluate supercritical CO 2 (scCO 2 ) storage in the Mt. Simon sandstone at the FutureGen 2.0 site in Morgan County, Illinois. The simulations illustrate the recent modeling effort conducted to successfully obtain a Class VI permit under the Underground Injection Control Program of the U.S. Environmental Protection Agency. The scCO2 was injected into a highly stratified reservoir, distributed among four lateral wells. Results show that each of the multiple reservoir layers with low permeability traps a fraction of the scCO 2 beneath it so that the injected scCO 2 does not reach the top of the reservoir by the end of the simulation period. Hence, all of the injected scCO 2 is considered to be safely trapped by the stratified structure within the reservoir. A local sensitivity analysis (LSA) was conducted for injectivity and plume size at the end of the 20 year injection period. The LSA indicates that the imposed initial conditions and the hydraulic properties of the injection layer contribute the most to the sensitivity. Overall, the simulation outputs are very sensitive to only a small fraction of the inputs. However, the parameters that are important for controlling CO 2 injectivity are not the same as those controlling the plume area. The three most sensitive inputs for injectivity are the horizontal permeability and the residual aqueous saturation of the injection layer, and the initial fracture-pressure gradient. For the plume area, the most sensitive inputs are the horizontal permeability of the injection layer and the residual aqueous saturation of the two adjacent layers above the injection layer. Furthermore, the advantages of requiring just a single set of simulation results, scalability to the proper parameter errors, and straightforward calculation of the composite sensitivities make the proposed analysis attractive for guiding site characterization, injection well design, estimating AoR uncertainty and, and monitoring network design.

54 ENVIRONMENTAL SCIENCES↗

The cost of getting CCS wrong: Uncertainty, infrastructure design, and stranded CO 2

Carbon capture, and storage (CCS) infrastructure will require industry—such as fossil-fuel power, ethanol production, and oil and gas extraction—to make massive investment in infrastructure. The cost of getting these investments wrong will be substantial and will impact the success of CCS technology. Multiple factors can and will impact the success of commercial-scale CCS, including significant uncertainties regarding capture, transport, and injection-storage decisions. Uncertainties throughout the CCS supply chain include policy, technology, engineering performance, economics, and market forces. In particular, large uncertainties exist for the injection and storage of CO 2 . Even taking into account upfront investment in site characterization, the final performance of the storage phase is largely unknown until commercial-scale injection has started. We explore and quantify the impact of getting CCS infrastructure decisions wrong based on uncertain injection rates and uncertain CO 2 storage capacities using a case study managing CO 2 emissions from the Canadian oil sands industry in Alberta. We use Sim CCS, a widely used CCS infrastructure design framework, to develop multiple CCS infrastructure scenarios. Each scenario consists of a CCS infrastructure network that connects CO 2 sources (oil sands extraction and processing) with CO 2 storage reservoirs (acid gas storage reservoirs) using a dedicated CO 2 pipeline network. Each scenario is analyzed under a range of uncertain storage estimates and infrastructure performance is assessed and quantified in terms of cost to build additional infrastructure to store all CO 2 . We also include the role of stranded CO 2 , CO 2 that a source was expecting to but cannot capture due substandard performance in the transport and storage infrastructure. Results show that the cost of getting the original infrastructure design wrong are significant and that comprehensive planning will be required to ensure that CCS becomes a successful climate mitigation technology. Here, we show that the concept of stranded CO 2 can transform a seemingly high-performing infrastructure design into the worst case scenario.

54 ENVIRONMENTAL SCIENCES↗

Assessment of options for the development of a stacked storage complex in the Northern Michigan Basin, USA

The Northern Michigan Basin (NMB) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Integrated Pre-Feasibility Project is part of the U.S. Department of Energy’s (DOE) CarbonSAFE initiative. Our objective of the NMB CarbonSAFE pre-feasibility project was to assess the feasibility of an integrated, commercial-scale carbon dioxide (CO 2 ) storage complex in the NMB, which includes one or more deep saline geologic formations with sufficient capacity to permanently store at least 50 million metric tons of CO 2 over a 20- to 30-year period. Subsurface injection of CO 2 into depleted oil reservoirs for enhanced oil recovery (EOR) was also evaluated in the pre-feasibility study as an additional geologic storage mechanism because there are hundreds of depleted pinnacle reef reservoirs in the NMB, along with an established CO 2 -EOR operation, a feature that distinguishes this area from most other locations in the United States. Additionally, these reefs are co-located with the most favorable saline formations in the basin – the St. Peter sandstone and the Bass Islands dolomite – making stacked storage a real possibility. The study demonstrates that there are multiple locations in the northern Michigan study area that could support a commercial-scale storage complex with either saline storage or associated storage via CO 2 -EOR in the depleted pinnacle reefs alone (i.e., each storage mechanism has sufficient capacity alone) or via a combination of the two storage mechanisms. The term stacked storage refers to the concept of using both mechanisms together, in the same area, to achieve the required storage capacity. Key sites were identified in the northern part of the southern Michigan Peninsula that had sufficient geologic storage, nearby CO 2 sources, a favorable social and economic setting, and a strong developed team.

58 GEOSCIENCES↗

A quantitative risk assessment framework for fault reactivation in underground hydrogen storage: Coupled simulation and deep learning approach

Underground hydrogen storage (UHS) is emerging as a critical solution for large-scale energy storage. However, like all subsurface fluid injection activities, UHS poses the risk of injection-induced fault reactivation. Accurate risk assessment is essential to ensuring the safety and efficiency of UHS operations. This study presents the development of deep-learning surrogate models for fault reactivation prediction in UHS, trained on a comprehensive database of fully coupled fluid flow-geomechanics simulations. Our findings reveal that analytical models often yield unreliable estimates, with errors up to 54% in the allowable injection pressure, potentially leading to a 40% reduction in UHS operational capacity. The developed surrogate models were incorporated into a quantitative risk assessment (QRA) framework, enabling probabilistic evaluation of fault reactivation risk while accounting for uncertainties in the input variables. Site-specific features, such as horizontal stress gradients, fault’s dip and strike angles, and operational parameters like bottom-hole injection pressure and well-fault distance, were identified as the primary drivers of fault reactivation across various stress regimes. Whereas other hydraulic, geological, and poroelastic reservoir properties were found to have a secondary impact. Notably, we observed that the risk of fault reactivation for a critically oriented fault with a static friction coefficient greater than 0.55 remains below 10% in a normal faulting stress regime. However, the risk significantly increases as the stress regime transitions from normal to strike-slip and ultimately to reverse faulting conditions. These findings underscore the importance of rigorous site characterization and comprehensive QRA evaluations to optimize UHS performance and minimize geomechanical risks.

25 ENERGY STORAGE↗

A practical method for modeling temporally-averaged ocean wave frequency-directional spectra for characterizing wave energy climates

Wave energy resource characterization investigations have been hindered because frequency-directional wave spectra are not broadly available for many coastal regions due to the insufficient spatial coverage of buoy observation networks and spectral wave model hindcast outputs. We address this problem by developing and validating a practical method for approximating temporally-averaged frequency-directional wave spectra averaged over periods of months or years from bulk wave parameters, which are available at a much greater coverage and resolution than frequency-directional wave spectra. While the temporally averaged frequency-directional wave spectrum over these periods cannot be used for analyzing a single sea state, it aggregates multiple sea states, identifies dominant wave energy systems representing wave climate, and resolves their spectral characteristics. Therefore, modelling temporally averaged frequency-directional wave spectra is of great value for planning and designing wave energy projects, e.g., resource characterization, site assessment, and conceptual design of wave energy converters. Temporally-averaged frequency-directional wave spectra and related important wave energy parameters approximated using this method are found to be more accurate than commonly used parametric wave spectrum models. This method can be applied to a wide range of wave climates given its universality and high accuracy. Also, the availability of bulk wave parameters from multi-decade high-resolution wave model hindcasts is increasing.

16 TIDAL AND WAVE POWER↗

Effect of Acid-Washing on the Nature of Bulk Characteristics of Nitrogen-Doped Carbon Nanostructures as Oxygen Reduction Reaction Electrocatalysts in Acidic Media

In this work, CN x catalysts were synthesized using Fe-doped MgO as a growth substrate. The oxygen reduction reaction (ORR) performance of the synthesized samples was evaluated in a half-cell. Acid-washing improved the ORR activity for the synthesized CN x samples. This is attributed to the removal of the exposed metal, which is likely to be blocking the active sites. Characterization experiments suggest that acid-washing totally eliminates the support material (MgO) and renders carbon more graphitic. This is likely to be due to elimination of amorphous or less crystalline species during washing. In addition, characterization experiments reveal significant differences in the metallic species that are exposed versus those encased in the carbon nanostructure.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗