Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SNS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

STATUS OF NEW 2.5 MEV TEST FACILITY AT SNS

A new 2.5MeV beam test facility is being built at SNS. It consists of a 65 keV H- ion source, a 2.5MeV RFQ, a beam line with various beam diagnostics and a 6 kW beam dump. The facility is capable of producing one-ms-long pulses at 60Hz repetition rate with up to 50mA peak current. The commissioning with reduced average beam power is planned for fall 2014 to verify operation of all systems. The full power operation is scheduled to begin in 2015. The status of the facility will be presented as well as a discussion of the future R&D program.

Aleksandrov, Alexander V↗

HIGH RESOLUTION EMITTANCE MEASUREMENTS AT SNS FRONT END

The Spallation Neutron Source (SNS) linac accelerates an H- beam from 2.5MeV up to 1GeV. Recently the emittance scanner in the MEBT (2.5 MeV) was upgraded. In addition to the slit - harp measurement, we now can use a slit installed on the same actuator as the harp. In combination with a faraday cup located downstream in DTL part of the linac, it represents a classical slit-slit emittance measurement device. While a slit slit scan takes much longer, it is immune to harp related problems such as wire cross talk, and thus looks promising for accurate halo measurements. Time resolution of the new device seems to be sufficient to estimate the amount of beam in the chopper gap (the scanner is downstream of the chopper), and probably to measure its emittance. This paper describes the initial measurements with the new device and some model validation data.

emittance measurement↗

A NEW DIFFERENTIAL AND ERRANT BEAM CURRENT MONITOR FOR THE SNS* ACCELERATOR

A new Differential and errant Beam Current Monitor (DBCM) is being implemented for both the Spallation Neutron Source's Medium Energy Beam Transport (MEBT) and the Super Conducting Linac (SCL) accelerator sections. These new current monitors will abort the beam when the difference between two toroidal pickups exceeds a threshold. The MEBT DBCM will protect the MEBT chopper target, while the SCL DBCM will abort beam to minimize fast beam losses in the SCL cavities. The new DBCM will also record instances of errant beam, such as beam dropouts, to assist in further optimization of the SNS Accelerator. A software Errant Beam Monitor was implemented on the regular BCM hardware to study errant beam pulses. The new system will take over this functionality and will also be able to abort beam on pulse-to-pulse variations. Because the system is based on the FlexRIO hardware and programmed in LabVIEW FPGA, it will be able to abort beam in about 5 us. This paper describes the development, implementation, and initial test results of the DBCM, as well as errant beam examples.

beam current monitor↗

Recent Performance and Ignition Tests of the pulsed SNS H- Source for 1-MW Neutron Production

After acquiring several reliable spare targets, SNS ramped the beam power from 850 kW to 1.4 MW, which required an increase in H- beam pulse length from 0.88 to 1.0 ms at 60 Hz. This increase initially produced slow 2-MHz power ramp-ups and, after several weeks of uninterrupted operation, it produced plasma outages every time the pulse length was raised above ~0.95 ms. Similar outages were previously observed towards the end of long service cycles, which were believed to indicate that the breakdown voltage of the high purity hydrogen started to exceed the induced electric fields. In 2011 the RF was reconfigured to start with 10 cycles of 1.96 MHz, which yielded the shortest H- beam rise times and apparently eliminated those plasma outages. The new, pulse-length dependent outages were eliminated by increasing the initial frequency to 1.985 MHz. However, careful frequency studies are unable to justify this frequency. In addition, the paper discusses the issues and solutions for the electron-dump voltage, which starts to sag and become unstable after several weeks of high current operation.

43 PARTICLE ACCELERATORS↗

Neutronics analyses in support of rotating target developments at SNS

A second target station (STS) for Spallation Neutron Souce (SNS) very likely being operated in long-pulse mode is in the early design phase, will complement the ORNL neutron sources, which presently consist of a short-pulse spallation source and the HFIR research reactor. As an alternative to the stationary liquid metal target, a rotating target is being considered. Neutronics studies in support of a 3MW power 20 Hz repetition rate rotating target feasibility study funded through the laboratory LDRD program, was extended towards a 1.5 MW STS design. The scope of work included in-operation heat deposition rates in target structures for thermal and structural analyses, target radionuclide inventory for decay heat and safety analyses, lifetime estimations due to radiation-driven material damage of target and moderator components, moderator neutron performance and moderator cryogenic heatloads.

43 PARTICLE ACCELERATORS↗

EPICS V4 Evaluation for SNS Neutron Data

Version 4 of the Experimental Physics and Industrial Control System (EPICS) toolkit allows defining application-specific structured data types (pvData) and offers a network protocol for their efficient exchange (pvAccess). We evaluated V4 for the transport of neutron events from the detectors of the Spallation Neutron Source (SNS) to data acquisition and experiment monitoring systems. This includes the comparison of possible data structures, performance tests, and experience using V4 in production on a beam line.

43 PARTICLE ACCELERATORS↗

Recent Performance of and Plasma Outage Studies with the SNS H- Source

SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

H- ion source↗

SUPERCONDUCTING LINAC UPGRADE PLAN FOR THE SECOND TARGET STATION PROJECT AT SNS

The beam power of the Linac for the Second Target Station (STS) at the Spallation Neutron Source (SNS) will be doubled to 2.8 MW. For the energy upgrade, seven additional cryomodules will be installed in the reserved space at the end of the linac tunnel to produce linac output energy of 1.3 GeV. The cryomodules for STS will have the same physical length but will incorporate some design changes based on the lessons learned from operational experience over the last 10 years and from the high beta spare cryomodule developed in house. The average macro-pulse beam current for the STS will be 38 mA which is about a 40 % increase from the present beam current for 1.4 MW operation. Plans for the new cryomodules and for the existing cryomodules to support higher beam current for the STS are presented in this paper.

Kim, Sang-Ho↗

NEUTRONICS ANALYSES FOR SNS TARGETS DEPOSITIONS

In order to deposit Spallation Neutron Source (SNS) spent facility components replaced due to end-of-life radiation-induced material damage or burn-up, or because of mechanical failure or design improvements, waste classification analyses are being performed. These analyses include an accurate estimate of the radionuclide inventory, on which base components are classified and an appropriate container for transport and storage is determined. After the choice for the container is made, transport calculations are performed for the facility component to be placed inside the container, ensuring compliance with waste management regulations. When necessary, additional shielding is added. Most of the effort is concentrated on the target deposition, which normally takes place once or twice per year. Additionally, the second target station (STS) is in a process of design and waste management analyses for the STS target are being developed to support a deposition plan

Popova, Irina I↗

NEUTRONIC ANALYSES TO SUPPORT WASTE MANAGEMENT FOR SNS

According to the Spallation Neutron Source (SNS) operations plan the facility components are replaced, when they reach their end-of-life. These components must be safely removed, placed in a container for storage, and transported from the site. In order to classify components and suggest appropriate shipping container an accurate estimate of the radionuclide inventory is performed. After choice for the container is made, it is being modelled with the facility component, placed inside, in order to perform transport calculations to ensure that the container is compliant with the waste management regulations

Popova, Irina I↗

Laser System Design and Operation for SNS H- Beam Laser Stripping

Recently, a high-efficiency laser assisted hydrogen ion (H-) beam stripping was successfully carried out in the Spallation Neutron Source (SNS) accelerator. The experiment was not only an important step toward foil-less H- stripping for charge exchange injection, it also served as a first example of using megawatt ultraviolet (UV) laser in an operational high power proton accelerator facility. This talk reports the design, implementation, and commissioning results of the macropulse laser system, laser transport line, and laser operation for the laser stripping experiment. The macropulse laser consists of a mode-locked picosecond pulsed seed laser and a burst-mode Nd:YAG laser amplifier. The general design concept can be adapted to any temporal beam structures in most accelerators. We have achieved UV pulses with the pulse widths varying between 34 to 54 ps and a maximum peak power over 3.5 MW. A laser transport line is installed to deliver the UV beam to the laser stripping chamber at a transmission efficiency of 70%. Laser operation including remote control and monitor of laser parameters will be described.

Liu, Yun↗

Technical Workings of the 6D Phase Measurement at SNS

The Beam Test Facility (BTF) is a functional duplicate of the Spallation Neutron Source (SNS) frontend with a 2.5 MeV beam on which the first six-dimensional phase space measurement has been completed. This presentation will show the technical underpinnings involved in performing the 6D scan with the BTF. The first part will examine the diagnostic setup involving apertures, a screen, and a bunch shape monitor and how the integrated system functions. The next part will cover the scan logic used in the software. The last part will briefly discuss ongoing efforts to analyze 6D measurements and identify correlations.

Cathey, Brandon↗

A SUITE OF SNS NEUTRON INSTRUMENT MODELS

MCSTAS models of the Spallation Neutron Source (SNS) neutron scattering instruments are being developed in a unified approach. Models aid performance assessment of the instruments, diagnosis of the component setup, and provide a tool for experiment planning and evaluation for the user community. The MCSTAS code has become a standard tool for neutron optics simulations in the neutron scattering community. Neutrons are tracked through the instrument model starting from moderator emission profiles through beam shaping components to the scattering at the sample and neutron detection. Models for the POWGEN, TOPAZ, VULCAN, and NOMAD instruments were completed utilizing as-built information as much as possible. Simulation results with the models are validated with measured data. While measurements and simulations of the neutron spectra incident to the sample location can agree within 10%, as for VULCAN, discrepancies have been identified for POWGEN and TOPAZ that indicate misalignment of components as neutron guide segments. Ideally, these misalignments are traced down and corrected as found.

Geoghegan, Ceris↗

Bubble Generation in the SNS 2 MW Mercury Target

The accelerator at the Spallation Neutron Source is currently being upgraded to increase the proton beam power from 1.4 MW to 2.8 MW. About 2 MW will go to the first target station, while the rest will go to the future second target station. The first target station uses a mercury target. When the short proton beam pulse hits it, strong pressure waves are developed inside the mercury and the vessel itself, causing weld failures and cavitation erosion. The pressure wave can be significantly mitigated by injecting small helium bubbles into the mercury. SNS has been injecting helium since 2017 using small orifices but has met challenges in fabrication and operations with them. Thus, for the 2 MW target, swirl bubblers will be used to increase gas injection and improve reliability. A 2 MW prototypical target was built and tested in a mercury process loop available at Oak Ridge National Laboratory. Acrylic viewports on the top of the target were used to determine the bubble size distribution (BSD) generated by the swirl bubblers. It was found that the bubblers were not only capable of generating small bubbles but that the BSD was independent of gas injection rate.

Barbier, Charlotte↗

SNS Credited Beam Power Limit System Preliminary Design

The Controls Group at the Spallation Neutron Source (SNS) is designing a programmable signal processor based credited safety control that calculates pulsed beam power based on beam kinetic energy and charge. The system must reliably shut off the beam if the average power exceeds 2.145 MW averaged over 60 seconds. This paper discusses architecture and design choices needed to develop the system under the auspices of a programmable radiation-safety credit control.

Deibele, Craig↗

Simulations of Beam Chopping for Potential Upgrades of the SNS LEBT Chopper

The LEBT chopper is a critical element of the SNS accelerator system. In this work, the benefit of increasing the chopping voltage amplitude for the present chopping pattern is shown with beam simulations, and an ongoing hardware upgrade of the chopper pulser units is discussed. In addition, with the prospect of higher voltage capability of the new pulser design, two alternative chopping patterns which reduce the switching frequency of the chopper pulsers down to 1/2 or 1/4 of the present chopping pattern, are also explored with beam simulations.

Han, Baoxi↗

Progress on Machine Learning for the SNS High Voltage Converter Modulators

The High-Voltage Converter Modulators (HVCM) used to power the klystrons in the Spallation Neutron Source (SNS) linac were selected as one area to explore machine learning due to reliability issues in the past and the availability of large sets of archived waveforms. Progress in the past two years has resulted in generating a significant amount of simulated and measured data for training neural network models such as recurrent neural networks, convolutional neural networks, and variational autoencoders. Applications in anomaly detection, fault classification, and prognostics of capacitor degradation were pursued in collaboration with the Jefferson Laboratory, and early promising results were achieved. This paper will discuss the progress to date and present results from these efforts.

Pappas, Chris↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗