Chapter 33: Transportation: Shipping
No abstract prepared.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract prepared.
Not Available
The “Establish Americium-Oxide Production Capability” Project will produce purified 241 AmO 2 powder for the DOE-SC (Department of Energy - Office of Science) to be used in industrial applications.
Destructive and non-destructive examinations were performed on the components of the package 9975-02731 as part of a comprehensive Savannah River Site surveillance program for plutonium materials stored in the K-Area Complex (KAC). The package stored nuclear materials in KAC for 13.8 years. Inspection of the package during opening in KAC noted one non-conforming condition: a large discolored area on the upper fiberboard subassembly. The package was subsequently transferred to Savannah River National Laboratory for more detailed examination. In addition to the observation noted in KAC, the following conditions were observed: (1) Axial gap of 1.021 inch slightly exceeded the 1 inch maximum criterion, and (2) Lead shield height exceeded drawing tolerance of 24.7 inch by 0.019 inch. Visual examination of the upper fiberboard assembly and analysis of the discolored fiberboard indicate the discoloration was due to wood glue residue. The physical, thermal, and mechanical properties of the fiberboard met the acceptance criteria and/or were within the range of previously tested fiberboard and baseline samples. The visual, microscopic and tensile testing results were consistent with previous O-ring and baseline Viton results. The lead shield surface was covered with corrosion product as observed on other shields but there was no evidence of excessive blistering, flaking, or spalling. Besides minor and expected corrosion, no evidence of a degraded condition was found in this package. Examination of the 9975-02731 corroborates existing evidence that the 9975 package is robust and the components can perform their expected functions.
The influence of plastic deformation by ultrasonic smoothing on the surface roughness of 17Kh18N9 and 20Kh1M1F1TR steel billet in finishing is studied. In the experiments, a D-optimal Hartley–Kono design for four factors is employed. The four factors are the speed of billet rotation, the supply, the clamping force, and the ultrasonic power.
Support provided by USAS American Mariner, USNS Watertown, and USNS Huntsville for Mercury MA-8 mission
Explore the source record for details and available documents.
Not Available
Not Available
Explore the source record for details and available documents.
Explore the source record for details and available documents.