Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SAFETY REPORTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2016

The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in FY 2013 (Kelly et al. 2013). The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance and other surveillance findings, as well as results of the lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). The LANL SAVY-4000 Field Surveillance Plan Update was issued in 2014 (Kelly et al. 2014). This 2016 update reflects changes to the surveillance plan resulting from restrictions on handling residue materials greater than 500 g, the addition of specific engineering judgment containers, and 2015 surveillance findings. The SAVY-4000 container has a design life of five years, which was chosen as a conservative estimate of the functional properties of the materials used in the construction of the SAVY 4000 when exposed to the potential insults including temperature, corrosive materials and gases, and radiation. The SAVY-4000 container design basis is described in a safety analysis report (Anderson et al. 2013). In the National Nuclear Security Administration's (NNSA’s) approval of the safety analysis report, it was recommended that the design life clock begin on March 2014 (Nez et al. 2014). However, it is expected that a technical basis can be developed to extend the design life of the SAVY-4000 containers to approximately 40 years (Blair et al. 2012, Weis et al. 2015a). This surveillance plan update covers five years (2015–2019) and is developed to ensure SAVY-4000 containers meet their design criteria over the current five-year design life and to gather data that can be used in developing the technical basis for a 40-year design life. The technical basis for the longer design life will be developed based on the results of this surveillance plan and the concurrent lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). A long-term surveillance plan will be developed by the completion of this plan and will be based on the results of the first several years of this five-year surveillance plan and the lifetime extension studies. In addition, the current Hagan container population is so large (approximately 3,500 LANL-wide, approximately 3,000 in PF-4) that it is anticipated Hagan containers will be in use for many years to come. Therefore, this plan includes surveillance activities for the Hagan container system during the time it takes to replace the Hagan containers with manually-compliant containers such as the SAVY 4000. These Hagan examinations not only provide information to determine if additional Hagan surveillance is needed, but also support SAVY lifetime-extension studies because some of the container components are made from similar material (e.g., stainless steel and Viton).

42 ENGINEERING↗

Nuclear electric propulsion operational reliability and crew safety study: NEP systems/modeling report

The objective of this study was to establish the initial quantitative reliability bounds for nuclear electric propulsion systems in a manned Mars mission required to ensure crew safety and mission success. Finding the reliability bounds involves balancing top-down (mission driven) requirements and bottom-up (technology driven) capabilities. In seeking this balance we hope to accomplish the following: (1) provide design insights into the achievability of the baseline design in terms of reliability requirements, given the existing technology base; (2) suggest alternative design approaches which might enhance reliability and crew safety; and (3) indicate what technology areas require significant research and development to achieve the reliability objectives.

Karns, James↗

Liquid Fuel Qualification for Molten Salt Reactors: Identification of Gaps and Challenges

This report identifies and describes challenges in implementing the MSR fuel qualification process described in NUREG/CR-7299 Fuel Qualification for Molten Salt Reactors. This report provides additional information including examples and additional use case descriptions to assist applicants in understanding the content and structure of the information necessary to develop a fuel qualification report. In particular, the current report emphasizes the relationship of fuel salt qualification to the contents of the plant safety analysis report. This report is limited to the safety functions relevant to the reactor aspects of the nuclear power plant. MSRs that include significant fuel salt processing would also need to address the safety aspects of the processing facility. No significant gaps were found in NUREG/CR-7299. However, NUREG/CR-7299 focuses on generic descriptions of how the fuel salt supports achievement of plant fundamental safety functions. A fuel salt qualification report will need explicitly address the role of the fuel salt in meeting regulatory requirements for a particular plant. NUREG/CR-7299 also provides a regulatory mapping between NRC rules and the safety functions. However, by remaining at a fundamental level, NUREG/CR-7299 does not address plant specific safety analysis. Some aspects of the safety analysis may require additional emphasis for designs that incorporate particular features (such as additional confirmation of decay heat rejection performance for higher power reactors). This report provides additional structure to enable an applicant to develop their plant-specific safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Super B Progress Report: Detector

This report describes the present status of the detector design for Super B . It is one of four separate progress reports that, taken collectively, describe progress made on the Super B Project since the publication of the Super B Conceptual Design Report in 2007 and the Proceedings of Super B Workshop VI in Valencia in 2008.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

HFIR High Power HEU Neutronics Analyses

Department of Energy National Nuclear Security Administration Office of Material Management and Minimization’s mission includes the conversion of civilian research reactors from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. Analyses have shown that the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR) will need to operate at 95 MW for the LEU silicide dispersion fuel designs to match key performance metrics obtained with HEU fuel at 85 MW. To prove safe operation of HFIR after installation of plant modifications to increase power, a high power HEU test cycle was proposed. Neutronics model updates and reactor physics analyses are performed to support the development of safety design reports for the high power (HP) HEU test cycle. Reactor physics metrics evaluated herein include fuel depletion, actinide production, cycle length, fission rate density distributions, axial power peaking factors, and reactor kinetic parameters. These reactor physics analyses support the development of future LEU safety design reports by providing key input for future HP HEU HFIR thermal hydraulics and reactor transient safety analyses.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Effects Influencing Plutonium-Absorber Interactions and Distributions in Routine and Upset Waste Treatment Plant Operations

This report is the third in a series of analyses written in support of a plan to revise the Hanford Waste Treatment and Immobilization Plant (WTP) Preliminary Criticality Safety Evaluation Report (CSER) that is being implemented at the request of the U.S. Department of Energy (DOE) Criticality Safety Group. A report on the chemical disposition of plutonium in Hanford tank wastes was prepared as Phase 1 of this plan (Delegard and Jones 2015). Phase 2 is the provision of a chemistry report to describe the potential impacts on criticality safety of waste processing operations within the WTP (Freer 2014). In accordance with the request from the Environmental and Nuclear Safety Department of the WTP (Miles and Losey 2012), the Phase 2 report assessed the potential for WTP process conditions within and outside the range of normal control parameters to change the ratio of fissile material to neutron-absorbing material in the waste as it is processed with an eye towards potential implications for criticality safety. The Phase 2 study also considered the implications should WTP processes take place within the credible range of chemistry upset conditions. In the present Phase 3 report, the 28 phenomena described in the Phase 2 report were considered with respect to the disposition of plutonium and various absorber elements. The phenomena identified in the Phase 2 report are evaluated in light of the Phase 1 report and other resources to determine the impacts these phenomena might have to alter the plutonium/absorber dispositions and ratios. The outcomes of the Phase 3 evaluations then can be used to inform subsequent engineering decisions and provide reasonable paths forward to mitigate or overcome real or potential criticality concern in plant operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety and Function Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Safety and Function testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, duration, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Wind Turbine Safety and Function Test Report for the ARE 442 Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, four turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests that were performed on the turbines, including power performance, duration, noise, and power quality tests. Test results provide manufacturers with reports that can be used for small wind turbine certification. The test equipment includes an ARE 442 wind turbine mounted on a 100-ft free-standing lattice tower. The system was installed by the NWTC Site Operations group with guidance and assistance from Abundant Renewable Energy.

17 WIND ENERGY↗

Wind Turbine Safety and Function Test Report for the Mariah Windspire Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers to wind energy expansion by providing independent testing results for small wind turbines (SWT). In total, five turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests performed on the turbines, including power performance, duration, noise, and power-quality tests. NWTC testing results provide manufacturers with reports that may be used to meet part of small wind turbine certification requirements. The test equipment includes a Mariah Windspire wind turbine mounted on a monopole tower. L&E Machine manufactured the turbine in the United States. The inverter was manufactured separately by Technology Driven Products in the United States. The system was installed by the NWTC site operations group with guidance and assistance from Mariah Power.

17 WIND ENERGY↗

Wind Turbine Safety and Function Test Report for the Gaia-Wind 11-kW Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers to wind energy expansion by providing independent testing results for small wind turbines (SWT). In total, four turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests performed on the turbines, including power performance, duration, noise, and power-quality tests. The results of the testing provide the manufacturers with reports that can be used for small wind turbine certification. The test equipment includes a Gaia-Wind 11-kW wind turbine mounted on an 18-m monopole tower. Gaia-Wind Ltd. manufactured the turbine in Denmark. The system was installed by the NWTC site operations group with guidance and assistance from Gaia-Wind.

17 WIND ENERGY↗

A Comparison of Modifications to MELCOR versions 1.8.2 and 1.8.6 for ITER Safety Analysis

During the Engineering Design Activity of the International Thermonuclear Experimental Reactor (ITER), the MELCOR 1.8.2 code was selected as one of several codes to be used to perform ITER safety analyses [1]. MELCOR was chosen because it has the capability of predicting coolant pressure, temperature, mass flow rate, and radionuclide and aerosol transport in nuclear facilities and reactor cooling systems. MELCOR can also predict structural temperatures (e.g. first wall, blanket, divertor, and vacuum vessel) resulting from energy produced by radioactive decay heat and/or chemical reactions (oxidation). The Idaho National Laboratory (INL) Fusion Safety Program (FSP) made fusion specific modifications to the MELCOR 1.8.2 code [2-6], including models for water freezing, air condensation, beryllium, carbon, and tungsten oxidation in steam and air environments, flow boiling in coolant loops, and radiation in enclosures, that allowed MELCOR to assess the thermal hydraulic response of ITER cooling systems and the transport of radionuclides as aerosols during accident conditions. Recently, the ITER International Organization (IO) used a “pedigreed” version of MELCOR 1.8.2 [7] to perform accident analyses for ITER’s “Rapport Préliminaire de Sûreté” (Report Preliminary on Safety - RPrS). The MELCOR thermal-hydraulics code [8] is currently under development at the Sandia National Laboratory (SNL) for the US Nuclear Regulatory Commission (NRC). MELCOR is used to model the progression of severe accidents in light water fission reactors. Because MELCOR has undergone many improvements between version 1.8.2 and 1.8.6, the INL FSP decided to introduce fusion modifications into MELCOR 1.8.6, and thereby produce a version of MELCOR 1.8.6 with similar capabilities to the pedigreed version of MELCOR 1.8.2 used for the ITER RPrS. We have applied this version of MELCOR 1.8.6 to the same set of problems used in the MELCOR 1.8.2 pedigree analysis [7]. Section 2 describes a non-regression analysis that involves comparing the results from the modified version of MELCOR 1.8.6 against those predicted by the original, unmodified version of MELCOR 1.8.6. The purpose of this non-regression analysis is to demonstrate that the modifications made to the MELCOR 1.8.6 code do not drastically alter the intended functions of the MELCOR base code, and if they do to explain why the departure occurs and if the change is needed. The analysis was performed using the demonstration problem that came with the MELCOR 1.8.6 source distribution. Section 3 makes a comparison between the pedigreed version of MELCOR 1.8.2 and the new modified version of MELCOR 1.8.6 on a set of accident problems used by the ITER Joint Central Team (JCT) in the Generic Site Safety Report (GSSR) [9]. Finally, in section 4, the two versions of the code are compared on a series of developmental test problems described in the change documents [2-4, 6].

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System safety checklist Skylab program report

Design criteria statement applicable to a wide variety of flight systems, experiments and other payloads, associated ground support equipment and facility support systems are presented. The document reflects a composite of experience gained throughout the aerospace industry prior to Skylab and additional experience gained during the Skylab Program. It has been prepared to provide current and future program organizations with a broad source of safety-related design criteria and to suggest methods for systematic and progressive application of the criteria beginning with preliminary development of design requirements and specifications. Recognizing the users obligation to shape the checklist to his particular needs, a summary of the historical background, rationale, objectives, development and implementation approach, and benefits based on Skylab experience has been included.

Mcnail, E. M.↗