Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Carbon Capture Simulation Initiative: A Case Study in Multi-Scale Modeling and New Challenges

Abstract: Advanced multi-scale modeling and simulation has the potential to dramatically reduce development time, resulting in considerable cost savings. The Carbon Capture Simulation Initiative is a partnership among national laboratories, industry and universities that is developing and deploying a suite of multi-scale modeling and simulation tools including basic data submodels, steady-state and dynamic process models, process optimization and uncertainty quantification tools, an advanced dynamic process control framework, high-resolution filtered computational-fluid-dynamic (CFD) submodels, validated high-fidelity device-scale CFD models with quantified uncertainty, and a risk analysis framework. These tools and models enable basic data submodels, including thermodynamics and kinetics, to be used within detailed process models to synthesize and optimize a process. The resulting process informs the development of process control systems and more detailed simulations of potential equipment to improve the design and reduce scale-up risk. Quantification and propagation of uncertainty across scales is an essential part of these tools and models.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Public Risk Assessment Program

The Public Entry Risk Assessment (PERA) program addresses risk to the public from shuttle or other spacecraft re-entry trajectories. Managing public risk to acceptable levels is a major component of safe spacecraft operation. PERA is given scenario inputs of vehicle trajectory, probability of failure along that trajectory, the resulting debris characteristics, and field size and distribution, and returns risk metrics that quantify the individual and collective risk posed by that scenario. Due to the large volume of data required to perform such a risk analysis, PERA was designed to streamline the analysis process by using innovative mathematical analysis of the risk assessment equations. Real-time analysis in the event of a shuttle contingency operation, such as damage to the Orbiter, is possible because PERA allows for a change to the probability of failure models, therefore providing a much quicker estimation of public risk. PERA also provides the ability to generate movie files showing how the entry risk changes as the entry develops. PERA was designed to streamline the computation of the enormous amounts of data needed for this type of risk assessment by using an average distribution of debris on the ground, rather than pinpointing the impact point of every piece of debris. This has reduced the amount of computational time significantly without reducing the accuracy of the results. PERA was written in MATLAB; a compiled version can run from a DOS or UNIX prompt.

Mendeck, Gavin↗

Program Promotion Can Distort Space Systems Engineering and Deny Risk

NASA's spectacular success in the Apollo moon landings was achieved against the odds by an obsessive dedication to reducing the great risk. But risk analysis predicted so many astronaut fatalities that it was thought to be unreasonably pessimistic and potentially damaging to the Apollo program. Risk analysis was discontinued, risk was neglected in space shuttle engineering, and so the space shuttle design was unnecessarily dangerous. Since the Apollo era it has been understood that long human space missions would recycle oxygen and water to avoid the very high launch cost of directly supplying them. The development of recycling systems was justified by the need to increase material closure and reduce launch mass. When it was recognized that increasing closure leads to rapidly diminishing returns, the program goal was changed to reducing launch mass and reliability, cost, and risk were considered irrelevant. Systems engineering and especially the discouraging problems of risk and cost have been deliberately ignored because they detract from program promotion, with unfortunate results. Current human launch system design does account for risk and the result strongly resembles Apollo. Current life support design continues to assume recycling, even though the recent great reduction in launch cost now allows direct supply of oxygen and water with significantly better quality, reliability, cost, and risk.

Advocacy↗

Risk-based analysis and decision making in multi-disciplinary environments

A risk-based decision-making process conceived of and developed at JPL and NASA, has been used to help plan and guide novel technology applications for use on spacecraft. These applications exemplify key challenges inherent in multi-disciplinary design of novel technologies deployed in mission-critical settings. 1) Cross-disciplinary concerns are numerous (e.g., spacecraft involve navigation, propulsion, telecommunications). These concems are cross-coupled and interact in multiple ways (e.g., electromagnetic interference, heat transfer). 2) Time and budget pressures constrain development, operational resources constrain the resulting system (e.g., mass, volume, power). 3) Spacecraft are critical systems that must operate correctly the first time in only partially understood environments, with no chance for repair. 4) Past experience provides only a partial guide: New mission concepts are enhanced and enabled by new technologies, for which past experience is lacking. The decision-making process rests on quantitative assessments of the relationships between three classes of information - objectives (the things the system is to accomplish and constraints on its operation and development), risks (whose occurrence detracts from objectives), and mitigations (options for reducing the likelihood and or severity of risks). The process successfully guides experts to pool their knowledge, using custom-built software to support information gathering and decision-making.

technology↗

Bridging the Engineering and Medicine Gap

A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

Walton, M.↗

Risk assessment of landfill disposal sites - State of the art

A risk assessment process can assist in drawing a cost-effective compromise between economic and environmental costs, thereby assuring that the philosophy of 'sustainable development' is adhered to. Nowadays risk analysis is in wide use to effectively manage environmental issues. Risk assessment is also applied to other subjects including health and safety, food, finance, ecology and epidemiology. The literature review of environmental risk assessments in general and risk assessment approaches particularly regarding landfill disposal sites undertaken by the authors, reveals that an integrated risk assessment methodology for landfill gas, leachate or degraded waste does not exist. A range of knowledge gaps is discovered in the literature reviewed to date. From the perspective of landfill leachate, this paper identifies the extent to which various risk analysis aspects are absent in the existing approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems Safety Evaluation Based on System Thinking

Every engineer knows well and always considers about 'The local optimization makes the entire worst', and therefore well balanced design is required. Even the total safety has been assured by the safety design based on defense in depth concept, operational problem would occur by the chain of the fallacy of the defense in depth, then safety culture degradation, and finely organizational accident eventually happened. Probabilistic approach is required to the problem. We should answer to the question 'Safety Goal: How safe is safe enough?' for public acceptance. To respond to the operational problem and safety goal question, PRA, Probabilistic Risk Analysis is required. Further, Risk Communication should include comparison and selection among technical systems by risk and benefit analysis. Therefore, systems safety consideration is important based on systems thinking with considering following characteristics: - Goal-oriented- Optimization, Alternative proposals; - Global perspective- Bird's Eye; - Hierarchy- Isomorphism; - Life Cycle: Plan-Design-Construction-Use-Disposal; - Learning and Evolution. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conversion of Questionnaire Data

During the survey, respondents are asked to provide qualitative answers (well, adequate, needs improvement) on how well material control and accountability (MC&A) functions are being performed. These responses can be used to develop failure probabilities for basic events performed during routine operation of the MC&A systems. The failure frequencies for individual events may be used to estimate total system effectiveness using a fault tree in a probabilistic risk analysis (PRA). Numeric risk values are required for the PRA fault tree calculations that are performed to evaluate system effectiveness. So, the performance ratings in the questionnaire must be converted to relative risk values for all of the basic MC&A tasks performed in the facility. If a specific material protection, control, and accountability (MPC&A) task is being performed at the 'perfect' level, the task is considered to have a near zero risk of failure. If the task is performed at a less than perfect level, the deficiency in performance represents some risk of failure for the event. As the degree of deficiency in performance increases, the risk of failure increases. If a task that should be performed is not being performed, that task is in a state of failure. The failure probabilities of all basic events contribute to the total system risk. Conversion of questionnaire MPC&A system performance data to numeric values is a separate function from the process of completing the questionnaire. When specific questions in the questionnaire are answered, the focus is on correctly assessing and reporting, in an adjectival manner, the actual performance of the related MC&A function. Prior to conversion, consideration should not be given to the numeric value that will be assigned during the conversion process. In the conversion process, adjectival responses to questions on system performance are quantified based on a log normal scale typically used in human error analysis (see A.D. Swain and H.E. Guttmann, 'Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications,' NUREG/CR-1278). This conversion produces the basic event risk of failure values required for the fault tree calculations. The fault tree is a deductive logic structure that corresponds to the operational nuclear MC&A system at a nuclear facility. The conventional Delphi process is a time-honored approach commonly used in the risk assessment field to extract numerical values for the failure rates of actions or activities when statistically significant data is absent.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study.

The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Price Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supply Chain Research and Analysis: Illuminating Risks in Complex Systems

Framing the strategic challenge posed by the interconnected, multitiered supply chains of mission projects managed by the NASA Goddard Space Flight Center. Discussing conditions and risks which can disrupt or threaten the availability, production and delivery of products and services for complex space systems. Utilizing a holistic analytical framework, business intelligence techniques, an integrated information system platform and analytics to produce insight into suppliers / supply chains and associated risks. Advancing supply chain risk management capabilities to support the successful performance of space missions.

supply chain risk management↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

Raven

RAVEN (Risk Analysis Virtual Environment) is a flexible and multi-purpose probabilistic risk analysis, uncertainty quantification, parameter optimization and data knowledge-discovering framework. https://raven.inl.gov/

Slaughter, AndrewE.↗

Safety Risk Reliability Model Library

SR2ML is a software package which contains a set of safety and reliability models designed to be interfaced with the INL developed RAVEN code. These models can be employed to perform both static and dynamic system risk analysis and determine risk importance of specific elements of the considered system. Two classes of reliability models have been developed; the first class includes all classical reliability models (Fault-Trees, Event-Trees, Markov models and Reliability Block Diagrams) which have been extended to deal not only with Boolean logic values but also time dependent values. The second class includes several components aging models. Models of these two classes are designed to be included in a RAVEN ensemble model to perform time dependent system reliability analysis (dynamic analysis). Similarly, these models can be interfaced with system analysis codes to determine failure time of systems and evaluate accident progression (static analysis).

Wang, Congjian↗

Industry Application ECCS / LOCA Integrated Cladding/Emergency Core Cooling System Performance: Demonstration of LOTUS-Baseline Coupled Analysis of the South Texas Plant Model

Under the auspices of the DOE LWRS Program RISMC Industry Application ECCS/LOCA, INL has engaged staff from both South Texas Project (STP) and the Texas A&M University (TAMU) to produce a generic pressurized water reactor (PWR) model including reactor core, clad/fuel design and systems thermal hydraulics based on the South Texas Project (STP) nuclear power plant, a 4-Loop Westinghouse PWR. A RISMC toolkit, named LOCA Toolkit for the U.S. (LOTUS), has been developed for use in this generic PWR plant model to assess safety margins for the proposed NRC 10 CFR 50.46c rule, Emergency Core Cooling System (ECCS) performance during LOCA. This demonstration includes coupled analysis of core design, fuel design, thermalhydraulics and systems analysis, using advanced risk analysis tools and methods to investigate a wide range of results. Within this context, a multi-physics best estimate plus uncertainty (MPBEPU) methodology framework is proposed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MEASURING RISK IMPORTANCE IN A DYNAMIC PRA FRAMEWORK

Risk importance measures are indexes that are used to rank systems, structures and components (SSCs) using risk-informed methods. The most used/known measures are: Risk Reduction Worth (RRW), Risk Achievement Worth (RAW), Birnbaum (B) and Fussell-Vesely (FV). Once obtained from classical Probabilistic Risk Analysis (PRA) analyses, these risk measures can be effectively employed to optimize component testing and maintenance. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. The objective of this paper is to present a series of algorithms that can be used to determine classical risk importance measures (RRW, RAW, B and FV) along with newly developed ones from a Dynamic PRA analysis.

97 MATHEMATICS AND COMPUTING↗