Design Requirements and Software Specification for the Autonomous Energy Management Software System for Small Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems. Many of these buildings are small (<50,000 square feet), underserved, and use rooftop units for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the rooftop units heating and cooling set points, schedules, setbacks, and optimal start can result in 20 to 25 percent reduction in electricity consumption in small commercial buildings. In addition, improving demand flexibility of these buildings will result additional cost savings for the building owner. Therefore, the Department of Energy’s Building Technologies Office approved a project to address the needs for small commercial buildings. The project is led by Pacific Northwest National Laboratory (PNNL) with Intellimation LLC as the cooperative research and development agreement partner. The primary goal of the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, while providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage the vast experience of PNNL research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation, a company that plans to use it to scale their building energy efficiency (EE) and grid services offering. Widespread deployment of the AEMS system will improve the EE and demand flexibility of the building commercial building stock. It should also support cities and states in meeting their climate change mitigation goals. This document describes the various EE and grid service features of the AEMS system, infrastructure and data required to implement those features, and how the features should be automated. It also details how the various features will be tested and validated, including field validation. The document also details what flexibility the users have and how they will be able to leverage those capabilities exercise those. The intent is to create an AEMS system that would support scalable deployment, requires minimal configuration, and is easy to maintain over its expected lifespan. The initial alpha release of AEMS system is planned for March 2023, and the beta release is planned for the summer of 2023. The final release is planned for March 2024. Section 2 of the report documents the relevant building types that AEMS is suitable for. Section 3 documents EE features that will be supported. It will also include the data requirements, hardware requirements, implementation details, and how EE features will be tested and validated. Grid service features will be documented in section 4, including data requirements, hardware requirements, implementation details, and how the services will be tested and validated. Planned next steps are described in section 5.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

European Union's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement - but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda - whose broad purpose is to raise collective ambition - and the Global Power System Transformation (G-PST) Consortium - whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Chile's Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Chile↗

Australia's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Australia↗

India's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

United Kingdom's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Pathways for Tamil Nadu’s Electric Power Sector: 2020 - 2030

This report is part one of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) and Tamil Nadu Transmission Corporation Limited (TANTRANSCO) on power sector planning. This Pathways for Tamil Nadu’s Electric Power Sector 2020-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State power system and evaluate multiple scenarios of system evolution given resource constraints, costs of technologies, and power sector policies. A broad stakeholder group comprised of TANGEDCO leadership, developers, regulators, and researchers from within the power sector community in Tamil Nadu helped to guide the main objectives of the study and provided technical feedback to the research team. The outcomes of this effort include multiple pathways for power sector growth to 2030 and a robust model of Tamil Nadu's power system that can be used to continually analyze the impact of new policies, regulations, or system changes. The second report in this series will build on the bulk system analysis by focusing on the rapidly transforming distribution network in the State. The report will outline a framework developed by NREL and TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of an Energy Efficient and Cost Effective Autonomous Vehicle Research Platform

Commercialization of autonomous vehicle technology is a major goal of the automotive industry, thus research in this space is rapidly expanding across the world. However, despite this high level of research activity, literature detailing a straightforward and cost-effective approach to the development of an AV research platform is sparse. To address this need, we present the methodology and results regarding the AV instrumentation and controls of a 2019 Kia Niro which was developed for a local AV pilot program. This platform includes a drive-by-wire actuation kit, Aptiv electronically scanning radar, stereo camera, MobilEye computer vision system, LiDAR, inertial measurement unit, two global positioning system receivers to provide heading information, and an in-vehicle computer for driving environment perception and path planning. Robotic Operating System software is used as the system middleware between the instruments and the autonomous application algorithms. After selection, installation, and integration of these components, our results show successful utilization of all sensors, drive-by-wire functionality, a total additional power* consumption of 242.8 Watts (*Typical), and an overall cost of $118,189 USD, which is a significant saving compared to other commercially available systems with similar functionality. This vehicle continues to serve as our primary AV research and development platform.

33 ADVANCED PROPULSION SYSTEMS↗

The Renewable Opportunity in Mining

Renewable energy can provide mine operators with solutions to several of the challenges they face today, including energy costs, fossil fuel volatility, social license to operate, and meeting environmental, societal, and governance goals. However, the integration of wind, solar, storage, and other renewable technologies presents several technical barriers that are generally not well understood by the mining industry. Many of these barriers will require further research, development, demonstration, and deployment (RDD&D) before we see higher levels of renewables adoption in the mining industry.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Deliverable D11 – Data Sharing, Storage, Security Protocols, and a Specification of a Potential Data Sharing Portal

Pacific Northwest National Laboratory (PNNL) and Technical University of Denmark (DTU) completed this deliverable as part of Work Package 2: Data Information Catalog for Distributed Wind Research for the International Energy Agency (IEA) Wind Technology Collaboration Programme Task 41: Enabling Wind to Contribute to a Distributed Energy Future. As part of the work plan, Deliverable D11 requires the development of data sharing, storage, and security protocols for metadata to be stored on the platform, if needed. The specification of a potential data sharing portal that expands on the catalog is also required.

17 WIND ENERGY↗

Advanced Simulation and Computing (FY22 Implementation Plan Rev 0)

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) Program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY22. The Initial IP, effective , should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Water & Energy Interdependencies Across Economic Sectors of the United States

The motivation of the Integrated Water Power Resilience Project is to identify and develop opportunities for improving resilience in the water and power sectors through coordinated planning, investment, and operations and thereby provide benefits to power and water utilities, consumers, and the environment. Water and power systems are interdependent, subject to many of the same natural and manmade hazards, and are critical for the well-being of communities and society. Because of the interconnectedness of water and power systems, there are substantial economic, social, and environmental benefits to co-managing the market sectors for resilience instead of managing them separately. To support this initiative and future research in this area, a county level water and energy flow dataset was developed to build, calculate, and visualize interconnections in water and energy between various sectors. This report presents county and regional water and energy visualizations across nine economic sectors of the United States: agriculture, commercial, electricity generation, industrial, mining, public water supply, residential, transportation, and wastewater treatment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Functional Requirements for the WEIS Toolset to Enable Controls Co-Design of Floating Offshore Wind Turbines

The goal of the new Wind Energy with Integrated Servo-control (WEIS) toolset under development is to provide the offshore wind industry and research communities with an open-source, user-friendly, flexible tool to enable true controls co-design (CCD) of the physical design of a floating offshore wind turbine together with the controller. WEIS will use a multifidelity library of models built on the foundations of WISDEM® and OpenFAST formerly known as FAST). This paper presents the WEIS development plan, including the functional requirements of WEIS (including improvements to WISDEM and OpenFAST) together with associated rationale for their establishment and a qualitative description of the modeling approaches that will be implemented to address these functional requirements. The development of WEIS is a project under the Aerodynamic Turbines Lighter and Afloat with Nautical Technologies and Integrated Servo-control program funded by the U.S. Department of Energy Advanced Research Projects Agency – Energy.

27 ARPA - Advanced Research Projects Agency-Energy↗

Subtask 1.5 – CO2 Injection Monitoring with an Optimized Scalable, Automated, Semipermanent Seismic Array

The scalable, automated, semipermanent seismic array (SASSA) method is a flexible and relatively cost-effective surface geophysical method for regular time-lapse monitoring of the movement of injected carbon dioxide (CO2) in a reservoir for CO2 enhanced oil recovery (EOR) or geologic CO2 storage operations. It has the advantages of a low-environmental-footprint while monitoring regions of a reservoir from the surface without the need for a regular grid distribution of receivers. Automated data collection is possible. As only time-lapse amplitude changes at the reservoir level due to CO2 movement within the reservoir are monitored, the turnaround time to deliver results from the SASSA method can be short, without the need for long, time-consuming data-processing workflows. As data is collected and processed, incremental information can be provided to the field operator. The Energy & Environmental Research Center (EERC) conducted a SASSA field test from September 2018 to November 2020 in a portion of the Bell Creek Field in Montana, which implemented new CO2 EOR field activities during the study period. Lessons learned from a proof-of-concept study were incorporated to improve the data quality of the SASSA method and demonstrate the viability of the technology. The EERC implemented several enhancements to improve data quality, including 1) an iterative survey design, which allowed placing the receivers in strategic locations where the movement of the CO2 in the reservoir could be tracked with minimum interference by the cultural noise in the study area; 2) the use of powerful seismic sources in the form of surface orbital vibrators, and 3) data acquisition during optimal periods. History-matched reservoir simulation was performed to predict gas saturation and pressure response induced by CO2 injection in the study area. The results were compared with the SASSA-measured responses to CO2 injection as a partial validation technique. A match between the two methods was observed for most of the SASSA points predicted to have intersected a CO2 saturation change. The validated results provide confidence that the SASSA method can be used independently as a CO2 saturation monitoring technique. As data are collected and processed, incremental information can be provided to the field operator. The critical components of the SASSA workflow for a successful application of the method are the following: Iterative survey design with information about CO2 injection activities from the oilfield operator. A detailed CO2 injection plan is the key driver to select the strategic monitoring location of the SASSA sensors. After this information is incorporated in the initial distribution of sources and receivers in the study area, high-resolution satellite images are used to identify ground locations not affected by cultural noise sources, such as power lines, pipelines/flow lines, or roadways. In the next iteration of the survey design, a scouting trip to the study area is needed to understand more details of the noise sources identified in the previous step and the intensity of the field activities that can also generate noise during the monitoring. Integrating the information from the scouting trip into the survey design to select the optimum source and receiver locations is the final step. Noise attenuation. The variety of noise types during seismic monitoring of an oil field is enormous. Tailored noise characterization and processing at a node-by-node level can enhance the performance and sensitivity of the SASSA technique. Future advancements that could improve the efficiency and application of the SASSA technology include: Gaining a better understanding of the noise field produced by the seismic source to aid the choice of receiver location. Surface noise from the source can overwhelm the small signal changes due to CO2 that the SASSA method measures. Improved data-processing workflow to automatically analyze and adapt to dynamic noise conditions associated with industrial settings. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE- FE0024233.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Visual Modeling for Complex System Valuation: Implementation Guidance

Within the Transactive Systems Program (TSP) at Pacific Northwest National Laboratory (PNNL) the need to incorporate a valuation analysis design early within the research process of transactive energy systems led to development of a valuation methodology. This methodology allows the modeling of economic exchanges within a complex system and supports the evaluation of individual stakeholder economic outcomes in addition to systemwide costs and benefits. The use of visual modeling practices enables the research team to reach common understanding and agreement on the analysis design within the complex system. While this methodology was developed for the valuation of transactive energy systems, it can be applied to any complex system where a granular economic analysis is desired. It allows for the inclusion of equity analyses and ties individual activities and microeconomic outcomes with the systemwide macroeconomic impacts. This document serves as implementation guidance for analysts planning to deploy the methodology within a research study. The appendixes provide specific guidance on how this methodology is deployed within the TSP at PNNL for analysts seeking guidance for deployment within that context.