Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Degradation of ILW Drums Due to Internal Metallic Corrosion - 18036

Within the British nuclear inventory, metallic Intermediate Level Waste (ILW) is encapsulated in grout and stored in stainless steel drums. Based on recent inspections held in the relevant storage facilities (Sellafield, Cumbria), a proportion of these drums have exhibited considerable distortion, raising concerns about the long-term safety of the packages. Distortion may be caused by the generation of voluminous and potentially flammable substances resulting from metallic corrosion occurring within the drums' core. Potential oxygen influx in the event of steel fracture and consequently drum's failure could potentially cause release or even ignition of the encapsulated radioactive material. The mechanical degradation of the encapsulants (stainless steel and grout) induced from the progressive corrosion of the encapsulated metallic components (and the associated volume expansion) was investigated using both Finite Element Modelling (FEM) techniques as well as experimental trials. A parametric study using simplified 3D FE models was performed to determine their structural integrity under different scenarios. Synchrotron X-Ray tomography (XRT) was used to monitor the behaviour of miniaturized ILW drum-simulants, whilst the latter were subjected to controlled accelerated corrosion in situ. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Historical Waste Retrieval and Clean-up Operations at Nuclear facility no.56, at the Cadarache Nuclear Research Centre

Among the different activities of the CEA research centre in Cadarache, located in the south of France, one of the most important involves cleaning, cleansing dismantling, decommissioning, and recovery of legacy wastes. This presentation will give an overview of the waste retrieval project from the historical interim storage facility called INB 56. The project is divided into three different sub-projects: the historical unpacked waste retrieval, the historical canister retrieval and the draining and clean-up of the spent fuel pools. All the described operations are conducted in accordance with the ALARA principle and the optimization of the waste categorization. The overall project, including the complete clean-up of the facility and its de-licensing, is due to end by 2020. The aim of this document is to outline the general ongoing historical waste retrieval operations and future projects on the INB 56 at the Cadarache research centre. In the final analysis, it can be seen that most of the waste is to be sent to the new CEDRA facility. Nevertheless one major goal of this project is to optimize the waste categorization and therefore to send the canisters to the ANDRA LLW site whenever possible. Two means will allow us to reach this goal: - The sorting out of un-packed waste in order to constitute a LLW canister - A wide range of measurements (gamma spectrometry, neutron measurement, tomography) in order to assess the exact nature of the contents in the historical canisters. Taking waste treatment and conditioning into account well in advance is a factor of prime importance that must be managed early in the elaboration of the decommissioning scenario. Precise knowledge of the physical and radiological inventories is of the utmost importance in defining the best waste pathway. Overall operations on the facility are due to end by 2020 including complete clean-up of the facility and its de-licensing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Germany's First Steps in the Restarted Site Selection Process - 18015

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

9975 SHIPPING PACKAGE PERFORMANCE OF ALTERNATE MATERIALS FOR LONG-TERM STORAGE APPLICATION

The Model 9975 shipping package specifies the materials of construction for its various components. With the loss of availability of material for two components (cane fiberboard overpack and Viton{reg_sign} GLT O-rings), alternate materials of construction were identified and approved for use for transport (softwood fiberboard and Viton{reg_sign} GLT-S O-rings). As these shipping packages are part of a long-term storage configuration at the Savannah River Site, additional testing is in progress to verify satisfactory long-term performance of the alternate materials under storage conditions. The test results to date can be compared to comparable results on the original materials of construction to draw preliminary conclusions on the performance of the replacement materials.

42 ENGINEERING↗

Panel Session 38: Featured Country Canada: Nuclear Power Plant Waste Management

This panel focused on waste characterization, minimization, treatment, packaging, and management of Canadian NPP operational wastes and NPP SNF/UNF storage and management. Presentations proposed include: 1 - Waste Minimization and Innovation applied to Ontario Power Generation's Low and Intermediate Level Waste (Lise Morton, Ontario Power Generation (Canada)); 2 - Waste Prevention Strategy Discussion (Kent Anderson, UniTech Services Group Inc (USA)); 3 - Energy Solutions Canada (Tim Ryder, EnergySolutions (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning for Future Implementation of Section 180(c) of the Nuclear Waste Policy Act: DOE's Policy Implementation Exercise - 16612

The Department of Energy (DOE) Office of Nuclear Energy, Nuclear Fuels Storage and Transportation Planning Project (NFST) is currently conducting a 2-year Section 180(c) Proposed Policy Implementation Exercise (the Exercise) with eight states and one Native American Tribe. Under Section 180(c) of the Nuclear Waste Policy Act of 1982 (NWPA), as amended, the DOE is responsible for providing technical and financial assistance to states and Tribes through whose jurisdictions the Secretary of Energy plans to transport spent nuclear fuel (SNF) or high-level radioactive waste to a NWPA-authorized facility for training of local public safety officials. In the 2000's, DOE staff worked closely with state and tribal representatives to develop a revised proposed policy to implement Section 180(c), including grants for assessment and planning activities, as well as training for public safety officials. This revised proposed policy was published in a Federal Register Notice in 2008 (2008 FRN) (73 Federal Register 64933, Oct. 31, 2008). The purpose of the current Exercise is to evaluate the efficacy of DOE's 2008 revised proposed policy for implementing Section 180(c), and identify and resolve outstanding issues. This paper describes how the Exercise was collaboratively designed between DOE and state and tribal stakeholders; how it is being conducted; the interim lessons learned from the first year of the Exercise; and how it may inform and improve future consultations between DOE and state, tribal, and local public safety officials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND Consortium - In-situ Identification of Surface Corrosion Products on Spent Nuclear Fuels - 20276

The management of spent nuclear fuel is a major ongoing concern for the UK owing to the cessation of reprocessing operations at Sellafield and the large, complex inventory arising from Magnox, AGR, PWR and prototype reactors. Retrieval and relocation operations for legacy fuels are imminent and therefore, any models that enhance our understanding of fuel evolution will help mitigate the risks associated with fuel storage and disposal. The TRANSCEND Consortium on nuclear waste management comprises four work packages, within this current paper we provide a summary overview of progress to date and illustrative results from Theme 3: Spent Nuclear Fuels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report: Characterization of Canister Mockup Weld Residual Stresses

Stress corrosion cracking (SCC) of interim storage containers has been indicated as a high priority data gap by the Department of Energy (DOE) (Hanson et al., 2012), the Electric Power Research Institute (EPRI, 2011), the Nuclear Waste Technical Review Board (NWTRB, 2010a), and the Nuclear Regulatory Commission (NRC, 2012a, 2012b). Uncertainties exist in terms of the environmental conditions that prevail on the surface of the storage containers, the stress state within the container walls associated both with weldments as well as within the base metal itself, and the electrochemical properties of the storage containers themselves. The goal of the work described in this document is to determine the stress states that exists at various locations within a typical storage canister by evaluating the properties of a full-diameter cylindrical mockup of an interim storage canister. This mockup has been produced using the same manufacturing procedures as the majority of the fielded spent nuclear fuel interim storage canisters. This document describes the design and procurement of the mockup and the characterization of the stress state associated with various portions of the container. It also describes the cutting of the mockup into sections for further analyses, and a discussion of the potential impact of the results from the stress characterization effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Innovative Approach to the Management of Waste Arising from the Decommissioning of a Redundant Plutonium Processing Facility - 17081

There are a number of redundant plutonium processing facilities located at Sellafield, in the North West of England within the United Kingdom (UK). Over past decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. Some of these challenges have recently been addressed through a new approach which introduces a number of innovations. The new approach seeks to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. A large bagless transfer system has been engineered to allow the transfer of whole gloveboxes into crates. This leads to a significant reduction in hazardous 'hands on' work in a highly contaminated environment. The crates are consigned directly to interim storage on the Sellafield site. These hazard minimisation activities have only been made possible through the development and implementation of a new approach to criticality safety assessment. This new approach has recently completed active commissioning with the first waste being safely exported in June 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposition of Newly Generated Transuranic Waste at ORNL - 20107

ORNL operates the High Flux Isotope Reactor, which provides a high neutron source for production of isotopes for medical, industrial, and nuclear research programs and is the US DoE's center for production, storage, and distribution for TRU isotopes (plutonium through californium). Operation of these facilities results in the generation of CH-TRU and RH-TRU waste for disposal at the WIPP. This paper describes the program ORNL is implementing in collaboration with the Carlsbad Field Office National TRU Program Difficult Waste Team to disposition newly generated TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TN International and ITS operational feedback regarding the decommissioning of obsolete casks dedicated to the transport and/or storage of nuclear raw materials, fuel and used fuel

Within the AREVA group, TN International is a major actor regarding the design of casks and transportation for the nuclear cycle. In the early 2005, TN International has started the project of decommissioning some of its own equipment and was hence the first company ever in the AREVA Group to implement this new approach. In order to do so, TN International has based this project by taking into account the AREVA Sustainable Development Charter, the French regulatory framework, the ANDRA (Agence Nationale pour la Gestion des Dechets Radioactifs - National Agency for the radioactive waste management) requirements and has deployed a step by step methodology such as radiological characterization following a logical route. The aim was to define a standardized process with optimized solutions regarding the diversity of the cask's fleet. As a general matter, decommissioning of nuclear casks is a brand new field as the nuclear field is more familiar with the dismantling of nuclear facilities and/or nuclear power plant. Nevertheless existing workshops, maintenance facilities, measurements equipments and techniques have been exploited and adapted by TN International in order to turn an ambitious project into a permanent and cost-effective activity. The decommissioning of the nuclear casks implemented by TN International regarding its own needs and the French regulatory framework is formalized by several processes and is materialized for instance by the final disposal of casks as they are or in ISO container packed with cut-off casks and big bags filled with crushed internal cask equipments, etc. The first part of this paper aims to describe the history of the project that started with a specific environmental analysis which took into account the values of AREVA as regards the Sustainable Development principles that were at the time and are still a topic of current concern in the world. The second part will deal with the definition, the design and the implementation of the decommissioning processes and the applied techniques. The third part will present a two years operational feedback. The last part will introduce new processes which are currently under investigation and will put into light that decommissioning of nuclear casks is a continuous activity that is in perpetual mutation. (authors)

42 ENGINEERING↗

Synthesis and Characterisation of Caesium Phosphomolybdate and Zirconium Molybdate found in the Highly Active Storage Tanks at Sellafield - 18154

Caesium phosphomolybdate (Cs{sub 3}PMo{sub 12}O{sub 40}.xH{sub 2}O, CPM) and zirconium molybdate (ZrMo{sub 2}O{sub 7}(OH){sub 2}.xH{sub 2}O, ZM) are two known fission products that precipitate out within the Highly Active Storage Tanks (HASTs) at Sellafield, potentially causing 'hot-spots' and blocking pipes. Currently, there is not enough behavioural understanding of these compounds present in the Highly Active Liquor (HAL) for effective Post Operational Clean Out (POCO) strategic planning. As the HASTs do not have an in situ monitoring system the behaviour of the HAL cannot be directly observed. Therefore, as with this research, non-radioactive simulants can be utilised to aid behavioural understanding to assist with the planning of future waste management programs. CPM, along with two different morphologies of ZM were characterised and compared to the common oxide particle material titanium dioxide (TiO{sub 2}). The study provides a detailed physical characterisation of the simulants including: particle shape, particle size, water content and crystal structure, along with zeta particle potential, suspension settling and compressive yield stress. CPM was found to be spheroidal in nature with a particle size of 275 nm and an x value of 13 H{sub 2}O which crystallises as a cubic lattice with space group Pn-3m. ZM was found to have a range of morphologies from cuboidal to wheat-sheaf, varying in size from 10 μm to 20 μm, with an x value of between 3 and 4 H{sub 2}O, which crystallise as a body-centred tetragonal lattice with space group I4{sub 1cd}. TiO{sub 2} used as a comparison simulant was found to be spheroidal in shape with particle size of 725 nm. The isoelectric points (IEPs) of the two ZM samples (ZM-A and ZM-B) with different morphologies were found to be pH 2.5, while for TiO{sub 2} it was pH 3.2. For CPM it could not be confidently identified due to its instability within the acidic environment. The settling rates and compressive yield stress of all simulants were tested in both water and 2 M nitric acid, conditions that replicate the HASTs. TiO{sub 2}, ZM-A and ZM-B all found settled faster in acid than in water. For CPM, slightly faster settling in acid was measured. For all samples it was found that as the particle concentration increased the settling rate decreased, which is a result of hindered settling. For compressive yield stress, similar trends were observed for CPM with little variation in its behaviour in acid and water, suggesting that the particles are highly aggregated in both fluids. For ZM samples little change in equilibrium volume fraction was measured with an increase in pressure (both acid and water). However, overall the sediment bed was denser in water, a result of the rapid settling in acid not allowing the non-spherical particles to pack in an ordered manner. It has been highlighted that both CPM and ZM within the acidic conditions of the HASTs, result in unstable and aggregated compounds, which settle quickly to form large open networks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

219-S CORROSION STUDY

A minor leak was detected in a drain line for Hood 2B located in the 222-S Laboratory. The line transfers radioactive waste, spent analytical standards, and chemicals used in various analytical procedures. Details are in the report provided by David Comstock, 2B NDE June 2008, work package LAB-WO-07-2012. Including the noted leak, the 222-S Laboratory has experienced two drain line leaks in approximately the last two years of operation. As a consequence, CH2M HILL Hanford Group, Inc. (CH2M HILL) requested the support of ChemMet, Ltd., PC (ChemMet) at the Hanford Site 222-S Laboratory. The corrosion expertise from ChemMet was required prior to preparation of a compatibility assessment for the 222-S Laboratory waste transfer system to assure the expected life of the piping system is extended as much as practicable. The system includes piping within the 222-S Laboratory and the 219-S Waste Storage and Transfer Facility and Operations Process. The ChemMet support was required for an assessment by 222-S staff to analyze what improvements to operational activities may be implemented to extend the tank/piping system life. This assessment will include a summary of the various material types, age, and locations throughout the facility. The assessment will also include a discussion of materials that are safe for drain line disposal on a regular basis, materials that are safe for disposal on a case-by-case basis including specific additional requirements such as flushing, neutralization to a specific pH, and materials prohibited from disposal. The assessment shall include adequate information for 222-S Laboratory personnel to make informed decisions in the future disposal of specific material types by discussing types of compatibility of system materials and potential wastes. The assessment is expected to contain some listing of acceptable waste materials but is not anticipated to be a complete or comprehensive list. Finally the assessment will encompass a brief discussion of acceptable limits for pipe degradation and references to applicable codes and standards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS OF PHYSICOCHEMICAL CHARACTERIZATION AND CAUSTIC DISSOLUTION TESTS ON TANK 241-C-108 HEEL SOLIDS

Based on an ENRAF waste surface measurement taken February 1, 2009, double-shell tank (DST) 241-AN-106 (AN-106) contained approximately 278.98 inches (793 kgal) of waste. A zip cord measurement from the tank on February 1, 2009, indicated a settled solids layer of 91.7 inches in height (280 kgal). The supernatant layer in February 2009, by difference, was approximately 187 inches deep (514 kgal). Laboratory results from AN-106 February 1, 2009 (see Table 2) grab samples indicated the supernatant was below the chemistry limit that applied at the time as identified in HNF-SD-WM-TSR-006, Tank Farms Technical Safety Requirements, Administrative Control (AC) 5.16, 'Corrosion Mitigation Controls.' (The limits have since been removed from the Technical Safety Requirements (TSR) and are captured in OSD-T-151-00007, Operating Specifications for the Double-Shell Storage Tanks.) Problem evaluation request WRPS-PER-2009-0218 was submitted February 9, 2009, to document the finding that the supernatant chemistry for grab samples taken from the middle and upper regions of the supernatant was noncompliant with the chemistry control limits. The lab results for the samples taken from the bottom region of the supernatant met AC 5.16 limits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗