Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Techno-Economic Wind Blade Manufacturing Model to Identify Opportunities for Cost Improvements Phase II IACMI Project 4.6/4.8

In IACMI Project 4.6 and IACMI Project 4.8, an Excel-based Techno-Economic Model (TEM) of the manufacturing process for composite wind turbine blades and a DELMIA Factory Flow Simulation of a generic wind blade manufacturing facility was developed. Together, these two tools provide a combined economic modeling capability that accounts for the material, labor, overhead and full-lifecycle operating costs associated with wind blade manufacturing as well as the impact of process flow and factory layout on overall manufacturing efficiency. The tools provide a novel means of detailed comparative analysis of the economic feasibility of proposed technologies and process changes for blade manufacturing. The modeling tools were developed with close support from members of industry and visits to multiple blade manufacturing facilities. With industry oversight, a detailed generalized manufacturing process plan and facility layout were developed with manufacturing parameters, material costs and economic factors based on historical data. Dassault Systèmes and the University of Texas at Dallas (UTD) contributed to the development of the Techno-Economic Model by providing macros to enable the generation of Bill of Material (BOM) data from a 3D blade design in either CATIA or NuMAD format, respectively. The TEM was built with the capability to directly import a Bill of Materials for economic analysis, and with the addition of the macros provided by Dassault and UTD, the TEM can directly import blade designs from both CATIA and NuMAD file formats. The modeling tools developed in Project 4.6 were used to investigate four wind blade manufacturing concepts in detail and select one to explore with laboratory-scale experimentation in Project 4.8. The four manufacturing concepts that were investigated were down-selected by the full project team from a larger list of concepts. The selections were made based on a number of criteria ranking viability and level of interest for each concept. The ‘One-Step Close’ manufacturing concept was ultimately selected for investigation in Project 4.8 and the demonstration was performed at the NREL CoMET facility. The TPI advanced manufacturing facility in Warren, RI contributed the production of several prototype components, the designs for which were developed by Janicki Industries. The demonstration project provided clear indication of the viability of the One-Step Close manufacturing concept for blade manufacturing and good validation of the Techno-Economic Model’s prediction of its economic impact.

17 WIND ENERGY↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

Evaluating GHG Mitigation Potential from ESPC Projects [Slides]

This report explores the impact of implemented ESPC projects on the projected greenhouse gas (GHG) emissions reductions in the U.S. buildings sector, and the associated projected annual cost savings and marginal abatement costs. It is important to investigate the role that energy retrofits can play in achieving GHG emission reduction targets given the use of ESPC by public agencies to reduce emissions from energy use in addition to the historical use of ESPC to to achieve cost/energy savings and ancillary benefits (e.g., addressing deferred maintenance, aging infrastructure, etc.). The analysis draws from LBNL’s eProject Builder (ePB) database, which contains approximately 3,000 energy retrofit projects implemented by energy service companies (ESCOs), mostly energy savings performance contract (ESPC) projects. This is the first report to model GHG emission reductions from ongoing ESPC projects in the U.S public sector based on ePB project data. It is intended for policymakers, federal, state and local government officials and other potential ESPC customers, the ESCO industry, researchers, and other energy policy professionals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CMIP6-based Multi-model Streamflow Projections over the Conterminous US

This dataset presents an ensemble of streamflow projections based on the hydroclimate projections dataset supporting the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). The six-member General Climate Model (GCM) ensemble from the Coupled Models Intercomparison Project phase 6 (CMIP6) downscaled using statistical (i.e., DBCCA) and dynamical (i.e., RegCM) and bias-corrected using two meteorological reference observations (Daymet & Livneh) are driven through two calibrated hydrologic models (VIC & PRMS) to simulate projected future hydrologic responses. This leads to the production of an ensemble of hydroclimate projections, including total runoff (surface runoff and baseflow) for 1980–2019 baseline and 2020–2059 near-term future periods under multiple emission scenarios at 1/24° (~4 km) spatial resolution across the CONUS. The total runoff projections are routed through the Routing Application for Parallel computatIon of Discharge (RAPID) routing model to produce an ensemble of streamflow projections for both periods across 2.7 million NHDPlusV2 stream reaches in the CONUS.

13 HYDRO ENERGY↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗

Curvilinear projection developments

Gradient projection is a powerful algorithm for minimization of a function subject to constraints. Constraint nonlinearities hamper projection computations. The constraints must then be restored before another projection cycle. The restoration steps taken in the process of following nonlinear constraint surfaces can be used as a guide to the construction of a curve which more nearly follows the constraints than does the straight line in the projected gradient direction. This scheme, termed 'curvilinear projection', was explored in earlier research. The study presently reported carries out some computational experiments using a related version of the technique. Some other details of projection computations which turn out to be practically important are taken up: rules for updating the variable metric in projection when early termination of the one-dimensional search on constraint violation occurs, and active-constraint logic for screening inequalities that makes use of the Kuhn-Tucker necessary conditions.

Kelley, H. J.↗

Map projections for larger-scale mapping

For the U.S. Geological Survey maps at 1:1,000,000-scale and larger, the most common projections are conformal, such as the Transverse Mercator and Lambert Conformal Conic. Projections for these scales should treat the Earth as an ellipsoid. In addition, the USGS has conceived and designed some new projections, including the Space Oblique Mercator, the first map projection designed to permit low-distortion mapping of the Earth from satellite imagery, continuously following the groundtrack. The USGS has programmed nearly all pertinent projection equations for inverse and forward calculations. These are used to plot maps or to transform coordinates from one projection to another. The projections in current use are described.

Snyder, J. P.↗

Application of expert systems in project management decision aiding

The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

Harris, Regina↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Data management for support of the Oregon Transect Ecosystem Research (OTTER) project

Management of data collected during projects that involve large numbers of scientists is an often overlooked aspect of the experimental plan. Ecosystem science projects like the Oregon Transect Ecosystem Research (OTTER) Project that involve many investigators from many institutions and that run for multiple years, collect and archive large amounts of data. These data range in size from a few kilobytes of information for such measurements as canopy chemistry and meteorological variables, to hundreds of megabytes of information for such items as views from multi-band spectrometers flown on aircraft and scenes from imaging radiometers aboard satellites. Organizing and storing data from the OTTER Project, certifying those data, correcting errors in data sets, validating the data, and distributing those data to other OTTER investigators is a major undertaking. Using the National Aeronautics and Space Administration's (NASA) Pilot Land Data System (PLDS), a Support mechanism was established for the OTTER Project which accomplished all of the above. At the onset of the interaction between PLDS and OTTER, it was not certain that PLDS could accomplish these tasks in a manner that would aid researchers in the OTTER Project. This paper documents the data types that were collected under the auspices of the OTTER Project and the procedures implemented to store, catalog, validate, and certify those data. The issues of the compliance of investigators with data-management requirements, data use and certification, and the ease of retrieving data are discussed. We advance the hypothesis that formal data management is necessary in ecological investigations involving multiple investigators using many data gathering instruments and experimental procedures. The issues and experience gained in this exercise give an indication of the needs for data management systems that must be addressed in the coming decades when other large data-gathering endeavors are undertaken by the ecological science community.

Skiles, J. W.↗

NASA's Hypersonic Research Engine Project: A review

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

Andrews, Earl H.↗

The Ceres S'Cool Project: Operational but not Routine

The first Clouds and the Earth's Radiant Energy System (CERES) instrument has been returning useful data on Earth's radiation budget from the Tropical Rainfall Measuring Mission (TRMM) spacecraft since late 1997. Validation of the initial data is now intensively underway. As one component of this validation, the CERES Students' Cloud Observations On-Line (S'COOL) project has been operational since April 1998 - the 2nd CERES validation month. S'COOL involves school children in over 140 schools in 15 countries on 5 continents in making and reporting observations and measurements which they and CERES scientists can then compare to the satellite retrievals. The project is planned to continue through the life of the CERES Project (nominally 15 years), and new participants are invited to join on a continuous basis. This paper will report on the first year of the operational phase of the project, during which a number of exciting events occurred (a demonstration of the project to First Lady Hillary Rodham Clinton, and visits by CERES personnel to participating schools, among others). It will further report on some of the noteworthy observations and comparisons which have been made possible by this project. We have found that schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper will also report on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students' minds as a result of their active participation.

Chambers, Lin H.↗

Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine

How big is your project world? Is it big enough to contain other cultures, headquarters, hierarchies, and weird harpoon-like guns? Sure it is. The great American poet Walt Whitman said it best, 'I am large/I contain multitudes.' And so must you, Mr. and Ms. Project Manager. In this issue of ASK, we look outside the project box. See how several talented project managers have expanded their definition of project scope to include managing environments outside the systems and subsystems under their care. Here's a sampling of what we've put together for you this issue: In 'Three Screws Missing,' Mike Skidmore tells about his adventures at the Plesetek Cosmodrome in northern Russia. Ray Morgan in his story, 'Our Man in Kauai,' suggests we take a broader view of what's meant by 'the team.' Jenny Baer-Riedhart, the NASA program manager on the same Pathfinder solar-powered airplane, schools us in how to sell a program to Headquarters in 'Know Thyself--But Don't Forget to Learn About the Customer Too.' Scott Cameron of Proctor and Gamble talks about sharpening your hierarchical IQ in 'The Project Manager and the Hour Glass.' Mike Jansen in 'The Lawn Dart' describes how he and the 'voodoo crew' on the Space Shuttle Advanced Solid Rocket Motor program borrowed a harpoon-like gun from the Coast Guard to catch particles inside of a plume. These are just some of the stories you'll find in ASK this issue. We hope they cause you to stop and reflect on your own project's relationship to the world outside. We are also launching a new section this issue, 'There are No Mistakes, Only Lessons.' No stranger to ASK readers, Terry Little inaugurates this new section with his article 'The Don Quixote Complex.'

Post, Todd↗

X-43C Flight Demonstrator Project Overview

The X-43C Flight Demonstrator Project is a joint NASA-USAF hypersonic propulsion technology flight demonstration project that will expand the hypersonic flight envelope for air-breathing engines. The Project will demonstrate sustained accelerating flight through three flights of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs will be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA's Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center off the coast of California over water in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (approximately 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavy-weight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (approximately 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air-Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides the background for NASA's current hypersonic flight demonstration efforts.

Moses, Paul L.↗