Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Construction of Synthetic Populations with Key Attributes: Simulation Set-up while Accommodating Multiple Approaches within a Flexible Simulation Platform

In this paper, we describe our concept for overcoming the data barriers of building credible synthetic populations to assist the transformation between social theories and mathematical models. We specifically developed a 31-million-agent model of Afghanistan s population to demonstrate the ability to computationally control and analytically manipulate a system with the large number of agents (i.e., 108) necessary to model regions at the individual level using the LandScan Global population database. Afghanistan was selected for this case study because gathering data for Afghanistan was thought to be especially challenging. The LandScan Global population database is used by a majority of key U.S. and foreign agencies as their database system for worldwide geospatial distribution of populations. Assigning attributes to disaggregated population was achieved by fusing appropriate indicator databases using two forms of aggregation techniques geographical and categorical. A new approach of matching attributes to theoretical constructs was illustrated. The other data sources used include data on military and peacekeeper forces loyalties, readiness, and deployment collected through a combination of UN and classified force projections; economic data collected at the national level and disaggregated using data fusion techniques; data on social attitudes, beliefs, and social cleavages through anthropological studies, worldwide polling, and classified sources; and data on infrastructure and information systems and networks.

99 GENERAL AND MISCELLANEOUS↗

Phasor-Measurement-Unit-Based Data Analytics Using Digital Twin and PhasorAnalytics Software

A major objective of this project was to apply GE’s commercial machine learning and data analytics toolsets to large-scale, real-world, anonymized Phasor Measurement Unit (PMU) datasets in order to extract signatures, correlated and/or causal factors, and precursor patterns associated with significant power system phenomena. The project had a particular emphasis on extraction of insights relevant to asset health monitoring, real-time load modeling and cybersecurity monitoring. Additionally, the team was directed to undertake a comprehensive data quality analysis for the provided datasets and encouraged to estimate the ‘machine-learning readiness’ of the datasets by documenting any major obstacles to the application of commercial machine learning algorithms. To accomplish the aforementioned objectives, the project team’s work centered around the identification of key event signatures and application of the identified event signatures for event detection and event classification. The industry-validated, semi-supervised machine learning strategy employed for event signature identification involved several major tasks, including data-preprocessing, generation of an overabundance of features, normal data identification, normality modeling, and event signature identification through a methodical, quantitative ranking of features in order of relevance to each studied event type. Throughout the project, data quality issues and mitigation techniques were investigated. In this report, insights are provided regarding the readiness of the provided synchrophasor datasets for application of machine learning and data analytics. The methodologies employed for this technical strategy are summarized in this report. With regards to data preprocessing and feature generation, the provided Training and Test Datasets were ingested into GE’s big data environment. Subsequently, the team applied bad data cleansing and data imputation scripts, event detection scripts, and application programming interfaces (APIs) to the datasets for convenient data access. The project team completed development and validation of dozens of physics-based, statistics-based and transformation-based feature functions used for the extraction of over 60 synchrophasor features. Using a new parallel feature generation technology developed on this project, over 60 features have been rapidly generated for the full two years’ worth of Training and Test Dataset data associated with both the Eastern and Western interconnects. Even accommodating for temporal down-sampling inherent to the feature extraction procedure, this parallel feature generation activity resulted in a massive feature set with a storage requirement approximately equal to that of the raw training dataset itself. With regards to normal data identification and normality modeling, a normality model was built using the feature data extracted from the Training Dataset and iteratively refined subsequent to incremental adjustments and expansions of the Training Dataset feature data. With respect to event characterization and signature identification, an event signature identification pipeline was developed and used in conjunction with the normality model to identify over 15 event signatures for key event categories within the Training Dataset. The identified event signatures were used to characterize hundreds of key events in terms of relative severity, duration, and location of the event. An investigation was undertaken to identify correlated and causal factors involved in transformer events. A separate investigation into temporal trends in ring-down analysis results was undertaken to determine possible associations between system dynamics and various other factors such as loading, season or year. To validate the identified event signatures, additional work was undertaken to develop signature-based anomaly detection and classification tools suitable for convenient application to the synchrophasor datasets. The anomaly detection and classification tools, suitable for online application, were then applied to the entirety of the Eastern Interconnect Training and Test Datasets. Performance of the event detection and classification tools was evaluated upon receipt of the Test Dataset event logs (i.e., the labels for events contained in the Test Dataset), and promising results were obtained despite several challenges (documented herein) associated with application of supervised or semi-supervised machine learning methods to large-scale, anonymized datasets. Finally, the detection and classification tools were used to detect, classify, and characterize thousands of new events not included in the original event logs provided by the DOE within both the Training and Test Datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measure Guideline: Deep Energy Enclosure Retrofit for Interior Insulation of Masonry Walls and Flat Roofs

Measure Guideline: Deep Energy Enclosure Retrofit for Zero Energy Ready House Flat Roofs BSC TO5 Task 7.4 Deep Energy Enclosure Retrofit (DEER) for Interior Insulation of Masonry Walls Lawrence, MA 01840 This Measure Guideline describes a deep energy enclosure retrofit solution for insulating mass masonry buildings from the interior. It describes the retrofit assembly, technical details, and installation sequence for retrofitting masonry walls. Interior insulation of masonry retrofits might adversely affect the durability of the wall. This guideline includes a review of decision criteria pertinent to retrofitting masonry walls from the interior and the possible risk of freeze-thaw damage. This Measure Guideline is intended to support contractors who are implementing an interior insulation-based high-performance enclosure retrofit for masonry buildings and designers who are looking to design such retrofits. It may also be helpful to building owners who wish to learn more about strategies that are available for deep energy enclosure retrofit of masonry residential buildings on the interior. This Measure Guideline is important to the high-performance retrofit industry because the solution described here provides an opportunity to retrofit masonry buildings with ambitious energy performance goals by insulating them from the interior without disturbing their exterior appearance. BSC TO5 Task 7.4 Deep Energy Enclosure Retrofit (DEER) for Zero Energy Ready House (ZERH) Flat Roofs House Jamaica Plain, MA 02130 This Measure Guideline provides design and construction information for a deep energy enclosure retrofit solution of a flat roof assembly. It describes the strategies and procedures for an exterior retrofit of a flat wood-framed roof with brick masonry exterior walls using exterior and interior (framing cavity) insulation. The approach supported in this guide could also be adapted for use with flat wood-framed roofs with wood-framed exterior walls. Designers, contractors, and building code officials will benefit from the information contained in this Measure Guideline. The guide may also be helpful to building owners who wish to learn more about strategies for deep energy enclosure retrofit of flat roofs. This Measure Guideline is important to the high-performance retrofit industry because it demonstrates techniques for retrofitting flat roofs from the exterior, which is less disruptive to the living space and allows the structure to remain occupied during the project. It also illustrates a solution for preparing homes to become zero energy ready.

Array↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Advancements to Lower Costs of Electrochromic Window Glazing

An Electrochromic (EC) Window is a solar control device that can electronically regulate the flow of sunlight and heat. In the case of the SageGlass{reg_sign} EC window, this property derives from a proprietary all-ceramic, intrinsically durable thin-film stack applied to an inner surface of a glass double-pane window. As solar irradiation and temperatures change, the window can be set to an appropriate level of tint to optimize the comfort and productivity of the occupants as well as to minimize building energy usage as a result of HVAC and lighting optimization. The primary goal of this project is to replace certain batch processes for EC thin film deposition resulting in a complete in-line vacuum process that will reduce future capital and labor coats, while increasing throughput and yields. This will require key technology developments to replace the offline processes. This project has enabled development of the next generation of electrochromic devices suitable for large-scale production. Specifically, the requirements to produce large area devices cost effectively require processes amenable to mass production, using a variety of different substrate materials, having minimal handling and capable of being run at high yield. The present SageGlass{reg_sign} production process consists of two vacuum steps separated by an atmospheric process. This means that the glass goes through several additional handling steps, including venting and pumping down to go from vacuum to atmosphere and back, which can only serve to introduce additional defects associated with such processes. The aim of this project therefore was to develop a process which would eliminate the need for the atmospheric process. The overall project was divided into several logical tasks which would result in a process ready to be implemented in the present SAGE facility. Tasks 2 and 3 were devoted to development and the optimization of a new thin film material process. These tasks are more complicated than would be expected, as it has been determined in the past that there are a number of interactions between the new material and the layers beneath, which have an important effect on the behavior of the device. The effects of these interactions needed to be understood in order for this task to be successful. Tasks 4 and 5 were devoted to production of devices using the novel technology developed in the previous tasks. In addition, characterization tests were required to ensure the devices would perform adequately as replacements for the existing technology. Each of these tasks has been achieved successfully. In task 2, a series of potential materials were surveyed, and ranked in order of desirability. Prototype device structures were produced and characterized in order to do this. This satisfied the requirements for Task 2. From the results of this relatively extensive survey, the number of candidate materials was reduced to one or two. Small devices were made in order to test the functionality of such samples, and a series of optimization experiments were carried out with encouraging results. Devices were fabricated, and some room temperature cycling carried out showing that there are no fundamental problems with this technology. This series of achievements satisfied the requirements for Tasks 3 and 4. The results obtained from Task 3 naturally led to scale-up of the process, so a large cathode was obtained and installed in a spare slot in the production coater, and a series of large devices fabricated. In particular, devices with dimensions of 60-inch x 34-inch were produced, using processes which are fully compatible with mass production. Testing followed, satisfying the requirements for Task 5. As can be seen from this discussion, all the requirements of the project have therefore been successfully achieved. The devices produced using the newly developed technology showed excellent optical properties, often exceeding the performance of the existing technology, equivalent durability results, and promise a significantly simplified manufacturing approach, thereby suggesting higher yields as a result of less handling, and therefore lower costs.

14 SOLAR ENERGY↗

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Advanced Physics-Based Fluid System Performance Monitoring to Support Nuclear Power Plant Operations. Final CRADA report

This project targeted performance monitoring requirements for nuclear power plants with the goal of improving plant economics. We introduced a new and innovative technology to the industry that can reduce operations staffing levels by automating surveillance and can reduce maintenance staffing levels by providing early detection of degrading equipment. A beta-stage release of the PRO-AID power plant equipment fault diagnostic software ready for deployment in nuclear power plants will be delivered and demonstrated in a utility pilot project. To provide for efficient use of DOE funds the aim is to generate a minimum viable product for which we can prove the value of the product. The end state product will be serviceable for use in either a simulator environment or plant environment. The former provides a means for demonstration of the diagnostic capability for faults unlikely to be encountered in day-to-day operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the 2013-2015 Association of Residents in Radiation Oncology Survey of Chief Residents in the United States

Purpose: The purpose of this project was to survey radiation oncology chief residents to define their residency experience and readiness for independent practice. Methods and Materials: During the academic years 2013 to 2014 and 2014 to 2015, the Association of Residents in Radiation Oncology (ARRO) conducted an electronic survey of post-graduate year-5 radiation oncology residents in the United States during the final 3 months of training. Descriptive statistics are reported. Results: Sixty-six chief residents completed the survey in 2013 to 2014 (53% response rate), and 69 completed the survey in 2014 to 2015 (64% response rate). Forty to 85% percent of residents reported inadequate exposure to high-dose rate and low-dose rate brachytherapy. Nearly all residents in both years (>90%) reported adequate clinical experience for the following disease sites: breast, central nervous system, gastrointestinal, genitourinary, head and neck, and lung. However, as few as 56% reported adequate experience in lymphoma or pediatric malignancies. More than 90% of residents had participated in retrospective research projects, with 20% conducting resident-led prospective clinical trials and 50% conducting basic science or translational projects. Most chief residents reported working 60 or fewer hours per week in the clinical/hospital setting and performing fewer than 15 hours per week tasks that were considered to have little or no educational value. There was more than 80% compliance with Accreditation Council for Graduate Medical Education (ACGME) work hour limits. Fifty-five percent of graduating residents intended to join an established private practice group, compared to 25% who headed for academia. Residents perceive the job market to be more competitive than previous years. Conclusions: This first update of the ARRO chief resident survey since the 2007 to 2008 academic year documents US radiation oncology residents' experiences and conditions over a 2-year period. This analysis may serve as a valuable tool for those seeking to improve training of the next generation of oncology leaders.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Casing Annulus Monitoring of CO 2 Injection Using Wireless Autonomous Distributed Sensor Networks

Effective and secure carbon subsurface storage, involving the deep underground injection of CO 2 into geological formations where it is permanently trapped, is paramount to mitigating CO 2 emissions (Figure I). Ensuring the integrity of these storage sites and detecting potential leakage through the casing annulus necessitates robust monitoring. This work provides the first integrated demonstration of a wireless casing-annulus monitoring architecture that can operate in highly attenuating cement-brine environments relevant to CO 2 storage. This project focused on developing and validating a novel sensor system for integration with autonomous monitoring near the cement reservoir interface. The goal was a fully integrated Technology Readiness Level (TRL) 4/5 field validation of a distributed wireless intelligent sensor system providing real-time, direct subsurface formation measurements to enhance fluid movement monitoring in the cemented casing annulus. Achieving this objective required the development and integration of 1) wireless autonomous microsensor technology by California Institute of Technology (Caltech); 2) sensor packaging and emplacement technology by Research Triangle Institute (RTI); and 3) smart well completions using wireless active casing collars and NOV pipe by the Sandia National Lab (SNL). The collaboration with the Caltech team in this project aimed to develop millimeter-scale radio frequency identification (RFID) sensors capable of detecting CO 2 , pH, and/or methane levels. These sensors are engineered to be impervious to fluids, allowing them to be mixed with cement and installed within the casing annulus. They operate using RFID protocols at frequencies of 902–928 MHz for both power and communication. A Sandia National Laboratories’ team engaged their expertise in the development of a Smart Collar system designed for the wireless data collection from these RFID sensors embedded in the cement annulus and transmission of this information to the ground surface via IntelliPipe/IntelliServ NOV drill pipe. This is accomplished through inductive coupling at the collar, which facilitates data transfer through each segment of the pipe. Because the system cannot transmit a direct current signal to power the Smart Collar, both power and communication were implemented using alternating current and electromagnetic signals at varying frequencies. Furthermore, the developed microsensor technology had to be demonstrated and validated in comparison with reference transducer measurements in a field test site at The University of Texas at Austin (UT-Austin). Although the full sensor suite did not reach field-deployment readiness, the system-level integration achieved in this project establishes a validated pathway for future incorporation of advanced microsensors.

47 OTHER INSTRUMENTATION↗

Tracking and Positioning System for Floating Solar (CRADA Abstract)

The project goal is to develop a floating solar photovoltaics (FPV) tracking & position system that: (1) increases annual energy production of FPV projects by >10%, (2) lowers levelized cost of energy (LCOE) for FPV by >10%, and (3) leverages U.S. contract supply chain & manufacturing. The outcome of the project will be a certified tracking product that has undergone extensive field testing and is ready for commercial sales. The primary objectives for each budget period are: • BP1: Define product requirements, develop initial controls architecture and design other sub-components, complete small-scale pilot testing, install a larger-scale pilot, secure sites for commercial pilots, and develop the beta-version of a user portal. • BP2: complete control system and sub-component design, successful demonstration and testing at a commercial pilot, certification & bankability, finalize user portal, and complete various commercialization activities related to supply chain, customer acquisition, and sales. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. This effort represents PNNL’s first opportunity to support the floating solar photovoltaics (FPV) industry with capabilities, facilities, and personnel developed to contribute to the marine energy (e.g., wave and tidal energy) sector. This portfolio expansion leverages internal and DOE EERE investments and the growing visibility of PNNL-Sequim’s Marine and Coastal Research Laboratory (MCRL) and our marine research capabilities, in general. The development of effective and low-cost FPV platforms is a potential way to increase the nation’s set of tools for providing emission-free electricity without utilizing valuable terrestrial resources. Successful commercialization of such a project may lead to economic benefits through job creation, supply chain creation, and access to a cheaper source of electricity.

14 SOLAR ENERGY↗

Development of Gyrosole and Solar Thermal HVAC Technology for 20-60kW Applications, CRADA No. TC02164.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Sol Xorce LLC to develop LLNL’s GyrosoleTM solar thermal energy system. The original scope of the CRADA project was to develop LLNL’s GyrosoleTM thermal-powered motor technology for solar thermal energy system use, and was originally entitled, "Development of GyrosoleTM Solar Thermal Technology for 20-60 kW Applications". The scope and title of the project were later modified under Amendment One to the CRADA. The technical objective of this CRADA project was to develop GyrosoleTM motor technology so that it is marketplace-ready.

14 SOLAR ENERGY↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

Development of Gyrosole™ and Solar Thermal HVAC Technology for 20-60kW Applications, Final Report, CRADA No. TC02164.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Sol Xorce LLC to develop LLNL’s Gyrosole™ solar thermal energy system. The original scope of the CRADA project was to develop LLNL’s Gyrosole™thermal-powered motor technology for solar thermal energy system use, and was originally entitled, "Development of Gyrosole™ Solar Thermal Technology for 20-60 kW Applications". The scope and title of the project were later modified under Amendment One to the CRADA. The technical objective of this CRADA project was to develop Gyrosole™ motor technology so that it is marketplace-ready, and to produce a motor prototype that: Produces 50kW power at >22% efficiency; Operates oil-free; Has sufficient reliability and lifetime to be suitable for both commercial and residential applications; Costs less than $100 per kW installed to produce at scale; and, Can be combined cost-effectively to produce 200kW. The motor prototype would be integrated into model systems that provide electricity generation in combination with air/water heating, heat-pump driven cooling, desiccant dehumidification, and light industrial heat supply.

14 SOLAR ENERGY↗

Ionization Cooling using Parametric Resonances

Ionization Cooling using Parametric Resonances was an SBIR project begun in July 2004 and ended in January 2008 with Muons, Inc., (Dr. Rolland Johnson, PI), and Thomas Jefferson National Accelerator Facility (JLab) (Dr. Yaroslav Derbenev, Subcontract PI). The project was to develop the theory and simulations of Parametric-resonance Ionization Cooling (PIC) so that it could be used to provide the extra transverse cooling needed for muon colliders in order to relax the requirements on the proton driver, reduce the site boundary radiation, and provide a better environment for experiments. During the course of the project, the theoretical understanding of PIC was developed and a final exposition is ready for publication. Workshops were sponsored by Muons, Inc. in May and September of 2007 that were devoted to the PIC technique. One outcome of the workshops was the interesting and somewhat unexpected realization that the beam emittances using the PIC technique can get small enough that space charge forces can be important. A parallel effort to develop our G4beamline simulation program to include space charge effects was initiated to address this problem. A method of compensating for chromatic aberrations by employing synchrotron motion was developed and simulated. A method of compensating for spherical aberrations using beamline symmetry was also developed and simulated. Different optics designs have been developed using the OptiM program in preparation for applying our G4beamline simulation program, which contains all the power of the Geant4 toolkit. However, no PIC channel design that has been developed has had the desired cooling performance when subjected to the complete G4beamline simulation program. This is believed to be the consequence of the difficulties of correcting the aberrations associated with the naturally large beam angles and beam sizes of the PIC method that are exacerbated by the fringe fields of the rather complicated channel designs that have been attempted. That is, while the designs developed and tested using the matrix program OptiM can work well, a real simulation with lumped dipoles, quadrupoles, and solenoids and their associated fringe fields has not succeeded. As a consequence of this realization, a new approach is being attempted that is based on the use of a helical solenoid (HS) channel that is made of simple coils that provide a much more homogeneous magnetic field. However, in order to use the HS a new approach was required to generate a variable dispersion that is needed according to the PIC theory described above. This approach and its first implementation will be described at EPAC08 in June, 2008.

43 PARTICLE ACCELERATORS↗

The High-Repetition-Rate Advanced Petawatt Laser System

The High-Repetition-Rate Advanced Petawatt Laser System (HAPLS), being developed at Lawrence Livermore National Laboratory (LLNL), recently completed a significant milestone: demonstration of continuous operation of an all diode-pumped, high-energy femtosecond petawatt laser system. The system is now ready for delivery and integration at the European Extreme Light Infrastructure Beamlines facility project (ELI Beamlines) in the Czech Republic.

42 ENGINEERING↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗