Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE↗

The current status of and future outlook for the NASA space program

A brief general overview of NASA programs and planning is presented. Topics discussed include long-term policy goals (creating commercial opportunities, construction of the International Space Station, and manned planetary missions), the scientific and technological projects planned for the Space Station, the key role of the Space Station in solar-system exploration, the pathfinder-technologies concept, and the comprehensive remote-sensing program Mission to Planet Earth.

Myers, D. D.↗

Sustainability on the urban scale: Proposal of a structure of indicators for the Spanish context

Some efforts to assess sustainability on the urban scale have been made and different tools for measuring the impact on and caused by cities have emerged. However, the sustainability concept varies from region to region, and indicators to measure it should be suitable for the context-specific conditions of the region under study. After doing a comprehensive review of the indicators included in 13 tools developed to assess urban sustainability of cities, this article proposes a new structure of indicators adapted to a Mediterranean city in Spain. The proposed structure is based on a two-level scheme that consists in 14 categories and 63 subcategories, which agglutinate urban sustainability indicators according to their purpose. This structure suggests a set of comprehensible qualitative and quantitative indicators that are easily applicable on neighbourhood or city scales. Given the similar features of Mediterranean countries in terms of environmental and socio-economic aspects, the proposed structure could be extrapolated to other countries with climatic and cultural similarities. Otherwise, the system is a useful tool in the decision-making process to help the different stakeholders involved in new urban developments and regeneration projects in existing neighbourhoods, such as developers, urban planners and public administrations. - Highlights: • Comprehensive review of 13 urban sustainability assessment tools • Proposal of a two-level structure to cluster urban sustainability indicators • Inclusion of sustainability criteria for urban planning projects and interventions.

54 ENVIRONMENTAL SCIENCES↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strategic health assessment for large scale industry development activities: An introduction

Attention to the determinants of health and health equity in impact assessment remains under-utilised at the project, Environmental Impact Assessment, level. Determinants focussed health impact assessment has developed at an upstream, policy level, but tends to assess draft proposals rather than form the basis of policies and plans. Project level health (risk) impact assessment tends to focus on a project by project basis, and generally eschews a broad model of health. One answer to this ‘health and impact assessment’ problem is to shift attention to the strategic level, in a similar manner to, and learning from, the development of Strategic Environmental Assessment and its theoretical and practical derivatives. In this article we explain the need for this shift both conceptually and practically by navigating the literature. Our analysis derives specifically from developing the Strategic Health Impact Assessment section of new international industry HIA guidance, coupled with work in and around health impact assessment and policy analysis for the past decade. We develop characteristics of conducting strategic health assessments for multiple industry development activities at the supra national, national or regional level. Our intended audience are public administrators, industry planners and financial sector investors. A particular focus is low and middle income countries, now seen by industry as emerging markets.

54 ENVIRONMENTAL SCIENCES↗

Systems engineering management plans.

The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

99 GENERAL AND MISCELLANEOUS↗

OES-IA Annex IV: Environmental Effects of Marine and Hydrokinetic Devices - Report from the Experts’ Workshop September 27th – 28th 2010 Clontarf Castle, Dublin Ireland

An experts' workshop was convened in Dublin Ireland September 27th – 28th 2010 in support of IEA Ocean Energy Systems Implementing Agreement Annex IV. PNNL was responsible for organizing the content of the workshop, overseeing the contractors (Irish Marine Institute) hosting the event, presenting material on Annex IV and materials applicable to the workshop intent. PNNL is also overseeing a contractor (Wave Energy Center/University of Plymouth – WEC/UP) in the collection and analysis of the Annex IV data. Fifty-eight experts from 8 countries attended the workshop by invitation, spending two days discussing the needs of Annex IV. Presentations by DOE (background on Annex IV), PNNL (process for developing Annex IV; presentation of the draft database for PNNL project, plans for incorporating Annex IV data), WEC/UP on the environmental effect matrix, and four MHK developers (two from the UK, one from Ireland and one from Sweden; each discussing their own projects and lessons learned for measuring and mitigating environmental effects, as well as interactions with consenting [permitting] processes) helped provide background. The workshop participants worked part of the time in the large group and most of the time in four smaller breakout groups. Participants engaged in the process and provided a wealth of examples of MHK environmental work, particularly in the European nations. They provided practical and actionable advice on the following: • Developing the Annex IV database, with specific uses and audiences • Strong consensus that we should collect detailed metadata on available data sets, rather than attempting to draw in copious datasets. The participants felt there would then be an opportunity to then ask for specific set of data as needed, with specific uses and ownership of the data specified. This is particularly important as many data collected, particularly in Europe but also in Canada, are proprietary; developers were not comfortable with the idea of handing over all their environmental effects data, but all said they would entertain the request if they specifics were clear. • The recommendation was to collect metadata via an online interactive form, taking no more than one hour to complete. • Although the idea of cases representing the “best practices” was recognized as useful, the participants pointed out that there are currently so few MHK projects in the water, that any and all projects were appropriate to highlight as “cases”. There was also discomfort at the implication that “best practices” implied “lesser practices”; this being unhelpful to a new and emerging industry. • Workshop participants were asked if they were willing to continue to engage in the Annex IV process; all expressed willingness. The workshop was successful in adequately addressing its objectives and through participation and interaction in the breakout sessions around the various topics. As a result of the workshop, many delegates are now better informed and have a greater understanding of the potential environmental effects of MHK devices on the marine environment. There is now a greater sense of understanding of the issues involved and consensus by those regulators, developers and scientists who attended the workshop. A strong network has also been built over the two days between European and US/Canadian technical experts in wave and tidal energy.

54 ENVIRONMENTAL SCIENCES↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Nuclear thermal propulsion workshop overview

NASA is planning an Exploration Technology Program as part of the Space Exploration Initiative to return U.S. astronauts to the moon, conduct intensive robotic exploration of the moon and Mars, and to conduct a piloted mission to Mars by 2019. Nuclear Propulsion is one of the key technology thrust for the human mission to Mars. The workshop addresses NTP (Nuclear Thermal Rocket) technologies with purpose to: assess the state-of-the-art of nuclear propulsion concepts; assess the potential benefits of the concepts for the mission to Mars; identify critical, enabling technologies; lay-out (first order) technology development plans including facility requirements; and estimate the cost of developing these technologies to flight-ready status. The output from the workshop will serve as a data base for nuclear propulsion project planning.

Clark, John S.↗

The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Baseline Cost Model for Hydropower (2023)

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

13 HYDRO ENERGY↗

MY EXES and EDM for Automated Remediation Data Quality Assessments - 19053

MY Electronic data exchange and Evaluation System (EXES) is a new web-based technology providing external admin access and full control to the Web-based EXES tool developed by GD for EPA for automated environmental remediation data quality assessments. EXES replaces most manual assessment processes, reducing remediation data review time and costs and ensuring that data are of known and documented quality. This tool is available from EPA to federal agencies and remediation firms and has successfully been used to support over 190 site investigations, 105 Remedial investigations and over 20 compliance monitoring efforts. The new MY EXES functionality has been developed for project managers and decision makers to setup projects, track receipt of environmental remediation monitoring data, assess data quality, and manage data. It is designed to be flexible and configurable to meet any government agency's data review and data management needs. It is accessible 24/7 through a secure portal. MY EXES efficiently evaluates analytical data regardless of the underlying method and data reporting requirements. It is a centralized project and data assessment tool that is scalable, flexible and configurable; improving data quality while reducing cost through the following: - Provides users with the ability to create a project and to specify the analytical methods corresponding to the data that will be submitted for that project. A project can be modified and managed anytime during the project's life cycle. - Allows users to manage a library of analytical methods that can be made available for association to their projects. - Users can specify the automated tests and assessment that needs to be performed on the analytical data deliverables based on specific requirements in the project's Quality Assurance Project Plan (QAPP). - Users specify: - The format of the incoming data deliverables from the laboratory; - The type and level of review services to be performed; - The assessment deliverables to be generated - output spreadsheets and reports; - Project owner sets up system access and permissions for members of the project team. - A faster (600%) and less expensive (85%) process than the traditional data usability/validation. The EXES Data Manager application (EDM) provides a centralized data repository to view and retrieve generated reports, spreadsheets, and other data deliverables as defined by the client, eliminating the need for data transfer between project team members. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Mixed Mode Combustor for Hydrogen F-Class Retrofit (Final Report)

This objective of this project was to develop a retrofittable combustor module for the GE Vernova Operations LLC (GE Vernova, GEV) frame 7F gas turbine (GT) that would allow operation on blends of hydrogen in Natural Gas (NG) between 0% and 100%. The new system was to be part of a package that retained current cycle performance while limiting the increase in NOx emissions to the equivalent of 25ppm (parts per million by volume dry at 15% O2, ppmvd15) with consideration for the impact of hydrogen fuel on the O2 correction. The expectation was that with the addition of Axial Fuel Staging (AFS), turndown within emission compliance would be extended to below 20% GT load. The original project plan included three budget periods (BPs): BP1 spanning October 1, 2022 through August 31, 2024; BP2 spanning September 1, 2024 through December 31, 2025; and BP3 spanning January 1, 2026 through September 30, 2026. The project was terminated early by the DOE on October 10, 2025 about three months prior to the end of BP2. BP3 activities were therefore cancelled. The program was on track to meet all objectives prior to the DOE termination. This Final Report covers work completed during BP1 and BP2 prior to the program termination.

08 HYDROGEN↗

Design options for a superconducting ion linac

Following a review of the design options for a superconducting ion linac, we present here an alternative design for the pre-stripper section of the superconducting driver linac for the rare isotope science project (RISP) of the Institute for Basic Science in Korea. The proposed alternative design takes advantage of the recent accelerator developments at Argonne, namely for the recent ATLAS intensity and efficiency upgrade and the Fermilab proton improvement plan project (PIP-II). In particular, the state-of-the-art performance of quarter-wave (QWRs) and half-wave resonators (HWRs), the integrated steering correctors and cold beam position monitors (BPMs) for a compact cryomodule design. In order to simplify the design and avoid frequency transitions, we used two types of QWRs at 81.25 MHz while the baseline design has QWRs at 81.25 MHz and HWRs at 162.5 MHz. The new QWR types were optimized for β ~0.05 and ~0.11, respectively, and corrected for beam steering effects. Nine cryomodules are required to reach the stripping energy of 18.5 MeV/u for uranium beam. An alternative radio-frequency quadrupole (RFQ) design was also developed. It is optimized with the multi-harmonic buncher (MHB) to produce a much smaller longitudinal emittance, offering much needed flexibility for beam tuning and more tolerance to errors. Following the lattice design optimization, end-to-end beam dynamics simulations including most important sources of machine error were performed. The results showed that the design is robust and tolerant to errors with no beam loss observed for typical machine errors.

43 PARTICLE ACCELERATORS↗

Experiences in managing the Prometheus Project

Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

nuclear↗

Thermal Analysis of Thermal Shield for PIP-II SSR1 Cryomodule

Fermilab's PIP-II project plans to enhance the onsite accelerator into the world's most intense neutrino beam, bringing Fermilab into the next generation of particle accelerators. The five different types of cryomodules are vital parts of the PIP-II project and each requires numerous engineering analyses to prove operation. For example, the thermal shield of the Single Spoke Resonator-1 (SSR1) cryomodule required a thermal analysis to ensure the design was operating as intended before fabrication commenced. The thermal shield is cooled by the supercritical helium inside of the extrusion and must remain between 45 and 80 Kelvin. The main purpose of the thermal shield is to intercept different high heat loads and thermal radiation and prevent them from reaching the more sensitive internal components. Finite Element Analysis (FEM) was used to determine temperature estimates of the thermal shield based on the location of a variety of heat sources. Results determined temperatures exceeding the design limit around the crucial component of the current leads. Due to superconducting properties, the areas around the current leads cannot surpass 68 Kelvin. Different solutions to the critical high-temperature areas will be proposed. These solutions range from changing the properties of the helium flow to designing an attachment for the thermal shield. Each proposition works as a viable solution, however, each proposition also has its own set of advantages and disadvantages that are described for further design consideration.

43 PARTICLE ACCELERATORS↗

Orbit Determination Covariance Analyses for the Parker Solar Probe Mission

This paper details pre-launch navigation covariance analyses for the Parker Solar Probe mission. Baseline models and error assumptions are outlined. The results demonstrate how navigation will satisfy requirements and are used to define operational plans. A few sensitivities are identified and the accompanying investigations are described. Predicted state uncertainty results show that most requirements are met with substantial margin. Moreover, navigation sensitivities may be accommodated operationally and this has been incorporated into project planning. Detailed results are presented only for select launch dates, however twenty unique trajectories (one per launch opportunity) have been assessed.

Jones, Drew Ryan↗

ISTAR: Project Status and Ground Test Engine Design

Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.

Quinn, Jason Eugene↗