W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Tracking the PACE of household energy usage: Energy usage impacts of projects financed through Property Assessed Clean Energy programs in California

This report examines the household-level energy impacts of residential property assessed clean energy (R-PACE) projects using normalized metered energy consumption methods. Our analysis covers projects that occurred through an R-PACE program between 2009 and 2017 and includes more than 25,000 electricity meters and 15,000 gas meters. We employ a comparison group, drawn from other R-PACE households with similar locational and usage characteristics whose projects were implemented at different times, to control for some non-project and non-weather factors that may impact energy use. We find that projects consisting of energy efficiency technologies save, on average, about 3% of household electricity usage and 3.5% of household gas usage. R-PACE financing, however, can be used to install central heating or air conditioning equipment for the first time. These projects would be expected to increase energy consumption. Since our data do not directly indicate which projects are new installations, we develop a simple algorithm for identifying them. Removing these inferred installation projects yields average savings of about 5% for electricity and 6% for gas for those households that remain in the sample. Given the mild California climate and the results of another study of similar California projects using similar methods, these results are in line with expectations. Solar PV projects yield large reductions in grid electricity use, averaging 69% of household consumption. We estimate that, collectively, all R-PACE projects installed in California through 2019 would generate annual reductions in grid-tied electricity consumption of 506 GWh (mostly due to solar PV) and gas consumption reductions of 2 million therms in a normal weather year. These impacts are equivalent to the electricity consumption of about 74,000 California households (including both efficiency and PV generation) and the gas consumption of about 4700 California households.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARPA-E Impacts: A Sample of Project Outcomes, Volume III

As the Advanced Research Projects Agency-Energy (ARPA-E) enters its ninth year of funding transformative R&D in energy technology, we are proud to present the third compilation booklet of project impact sheets. This booklet provides a glimpse into the diverse and sophisticated research portfolio of advanced energy technologies that will enable the United States to tackle our most pressing energy challenges. The projects in this booklet illustrate a wide range of impacts—from scientific breakthroughs to products in the marketplace. Statistical measures help demonstrate the achievements of ARPA-E funded projects at different stages of innovation. Since 2009, ARPA-E has provided approximately $1.8 billion in R&D funding for more than 660 potentially transformational energy technology projects. As of February 2018, ARPA-E project teams have published 1,724 peer-reviewed journal articles that have been cited 42,535 times, and have been awarded 245 patents by the U.S. Patent and Trademark Office. Moreover, 71 ARPA-E project teams have formed new companies, 127 have partnered with another government agency to continue their technology development, and 149 teams have together raised more than $2.9 billion in reported funding from the private sector to bring their technologies to market. Another way to understand the Agency’s success is through the specific scientific and engineering challenges that ARPA-E project teams have overcome. To provide greater insight into ARPA-E’s project successes, this booklet documents the opportunities and challenges project teams have faced in technologies related to energy efficiency, energy storage, and transportation. The booklet also includes a review of ARPA-E’s power electronics portfolio. We expect that ARPA-E’s project teams will continue to demonstrate impact, and that, as a result, we will continue to publish their successes. Please share this report with your colleagues—we hope to encourage innovative scientists and engineers to continue to engage us with their ideas and consider joining our team.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental test plan for PWR sister rods in the high burnup spent fuel data project

The High Burnup Spent Fuel Data Project (herein referred to as the 'project'), sponsored by the US Department of Energy (DOE) Office of Nuclear Energy (NE), is focused on experimentally defining the effects of long-term storage and transportation on high burnup (HBU) pressurized water reactor (PWR) fuel (>45 gigawatt days per metric ton uranium). The goals of the project are to provide confirmatory data for model validation and potential improvement; to provide input to future dry storage cask design; to support license renewals and new licenses for Independent Spent Fuel Storage Installation facilities; and to support transportation licensing for high burnup used fuel. In support of these project goals, an instrumented TN-32B bolted-lid cask at the North Anna reactor site will be loaded with intact, HBU PWR fuel assemblies (project assemblies) having four different kinds of cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO, and M5. In approximately 10 years, the instrumented cask will be opened for inspection and several fuel rods from the project assemblies will be characterized. To support the project goals, the project pulled 25 'sister rods', 9 from the project assemblies and 16 from similar HBU assemblies, for characterization. The 25 sister rods are all high burnup and cover the range of cladding alloys. The 25 sister rods were shipped to Oak Ridge National Laboratory (ORNL) in early 2016 for detailed nondestructive and destructive examination. Examinations are intended to provide baseline data on the initial physical state of the cladding and fuel prior to the loading, drying, and long-term dry storage process. Further examinations are focused on determining the effects of temperatures encountered during and following drying. Similar tests will be performed on rods taken from the project assemblies at the end of the storage period (the 'cask rods') to identify any significant changes in the fuel rods that may have occurred during the dry storage period. Additionally, some of the sister rods will be used for separate effects testing to expand the applicability of the project data to the fleet, and to address some of the data-related gaps associated with extended storage and subsequent transportation of high burnup fuel. A draft test plan is being developed that describes the experimental work to be conducted on the sister rods. This paper summarizes the draft test plan and necessary coordination activities for the multi-year experimental program to supply data relevant to the assessment of the safety of long-term storage followed by transportation of high burnup used fuel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Estimates for NPP Decommissioning Projects and Insights from Cost Analysis - 18118

The technical ability to decommission NPPs shut down after normal operation has been well demonstrated. However, concerns remain about the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international guidance on quality cost estimates for nuclear decommissioning projects and explores the potential added value that could be attained through more systematic analysis and reporting of decommissioning project costs. The OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) have long been concerned about the need to promote greater transparency in decommissioning costing and have collaborated in a number of initiatives in pursuit of this objective. Together with the European Commission, they published 'The International Structure for Decommissioning Costing (ISDC)' in 2012. The ISDC provides a useful common reporting format for decommissioning costing. The NEA has also published guidance on the international peer reviews of decommissioning cost studies (2014) and on the practice of decommissioning cost estimation (2015). In September 2017, the NEA and IAEA published detailed guidance on addressing uncertainties in decommissioning cost estimates (the 'Addressing Uncertainties' report). This joint report sets out an approach to treating uncertainties reflecting current good practices in cost estimating. Specifically, it describes how uncertainties in decommissioning cost estimation can be addressed using standardized methods of estimating uncertainty and risk analysis. Its recommendations aim at enabling a consistent and comprehensive treatment of risk and uncertainty in the preparation of decommissioning cost estimates. Together these publications establish a good basis for producing comprehensive and high-quality cost estimates for nuclear decommissioning projects and for enhancing confidence in the estimates through improving transparency concerning the underpinning data and calculations, and more explicit representation of the uncertainties that may impact on project costs. There is increasing attention on understanding variations between cost estimates and apparent escalation of decommissioning costs. This arises both from the need to assure the adequacy of financing arrangements for future decommissioning projects and the ambition to improve the performance and ensure value-for-money in the delivery of decommissioning projects and services. A systematic analysis of actual decommissioning project costs in relation to the cost estimates would be expected to yield valuable insights about key cost drivers in actual decommissioning projects, and the extent to which current cost estimates accurately capture and reflect these. Aligning the reporting of decommissioning project costs with the underpinning cost estimates for the projects would also facilitate the identification of causes of major deviations between projected and actual costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 120B: DOE Portsmouth Paducah Project Office (PPPO) Update

This panel focused on the Portsmouth/Paducah Project Office (PPPO) of the US DOE Office of Environmental Management, Lexington, Kentucky, the US DOE Featured Site for Thursday. It showcased recent progress, challenges and planned efforts in radioactive waste management, waste disposition, environmental remediation and D and D at the Portsmouth (Ohio) and Paducah (KY) Gaseous Diffusion Plant Sites, as well as the Depleted Uranium Hexafluoride (DUF6) Conversion Project with facilities at both sites Presentations proposed include: 1 - Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, US DOE Portsmouth/Paducah Project Office (USA)); 2 - Portsmouth (Jeff Bettinger, US DOE Portsmouth/Paducah Project Office (USA)); 3 - Paducah (Jennifer Woodard, US DOE Portsmouth/Paducah Project Office (USA)); 4 - Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, US DOE Portsmouth/Paducah Project Office (USA)); 5 - Portsmouth Deactivation and Demolition Project (Bob Smith, Fluor-BWXT Portsmouth (USA)); 6 - Paducah Deactivation and Remediation Project (Jeff Bradford, Four Rivers Nuclear Partnership - FRNP (USA)); 7 - Seven Lines-One Project (Zack Smith, SNC Lavalin (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Government Renewable Energy Projects

The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

17 WIND ENERGY↗

Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.

13 HYDRO ENERGY↗

A Section 110 Evaluation of the Project 57 Rad-Safe Area Personnel Decontamination Building, Nye County, Nevada

Project 57 was an open-air, plutonium-dispersal safety test conducted by the United States in 1957 on a portion of the Nevada Test and Training Range (NTTR) (formerly the Las Vegas Bombing and Gunnery Range). The Project 57 test area, once known as Area 13, was a block of land abutting the northeastern boundary of the Nevada Test Site (NTS). The NTS was renamed the Nevada National Security Site (NNSS) in 2010. In keeping with the historical Cold War period designation, NTS will be used when discussing historic period events, while NNSS will be applied for contemporary activities. During Project 57, the high explosives of a nuclear weapon were triggered asymmetrically to simulate an accidental detonation. The test was conducted to study the extent of plutonium contamination from a nonnuclear yield accident, as well as assess the biological and environmental hazards such an event could create. Following the conclusion of the experiment, the contaminated area surrounding the ground zero (GZ) was fenced off and some of the contaminated equipment was buried in place. The Project 57 Rad-Safe area was abandoned. In 1981, the U.S. Department of Energy (DOE) decontaminated and decommissioned the Project 57 site. This Section 110 documentation was prompted by recognition that more than five decades have passed since the abandonment of the Project 57 Rad-Safe area, particularly the personnel decontamination building, which leaves the temporary structure vulnerable to natural forces of weathering and decay. However, these temporary facilities remain partially standing, allowing for a condition assessment and recommendations regarding the Rad-Safe area’s historical significance. The National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) determined there was no area of potential effect (APE) (direct, indirect, or visual) because there is no planned undertaking and the Project 57 Rad-Safe area will continue to remain unused. Instead, a 4.5-acre study area was established to facilitate recording the Project 57 personnel decontamination building and the remaining accessory resources. The study area is bounded on the east by Valley Road and it extends to the east far enough to encompass the former Project 57 Rad-Safe area (Figure A-2). The Section 110 study area is located in the northwest quarter of Section 35, Township 07S Range 54E Mount Diablo Base and Meridian. It is on the 1962 Groom Mine SW USGS 7.5-minute series topographic quadrangle. Desert Research Institute (DRI) surveyed the Section 110 study area, resulting in the recording and evaluation of the Project 57 Rad-Safe area personnel decontamination building and four accessory resources (AR-1 through AR-4). Copies of the building form and report are on file at DRI and with the NNSA/NFO in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

A Strategic Project Appraisal framework for ecologically sustainable urban infrastructure

Actors in the built environment are progressively considering environmental and social issues alongside functional and economic aspects of development projects. Infrastructure projects represent major investment and construction initiatives with attendant environmental, economic and societal impacts across multiple scales. To date, while sustainability strategies and frameworks have focused on wider national aspirations and strategic objectives, they are noticeably weak in addressing micro-level integrated decision making in the built environment, particularly for infrastructure projects. The proposed approach of this paper is based on the principal that early intervention is the most cost-effective and efficient means of mitigating the environmental effects of development projects, particularly macro infrastructure developments. A strategic overview of the various project alternatives, taking account for stakeholder and expert input, could effectively reduce project impacts/risks at low cost to the project developers but provide significant benefit to wider communities, including communities of future stakeholders. This paper is the first exploratory step in developing a more systematic framework for evaluating strategic alternatives for major metropolitan infrastructure projects, based on key sustainability principles. The developed Strategic Project Appraisal (SPA) framework, grounded in the theory of Strategic Environmental Assessment (SEA), provides a means of practically appraising project impacts and alternatives in terms of quantified ecological limits; addresses the neglected topic of metropolitan infrastructure as a means of delivering sustainability outcomes in the urban context and more broadly, seeks to open a debate on the potential for SEA methodology to be more extensively applied to address sustainability challenges in the built environment. Practically applied and timed appropriately, the SPA framework can enable better decision-making and more efficient resource allocation ensuring low impact infrastructure development.

54 ENVIRONMENTAL SCIENCES↗

Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodology calibration purposes because, in the public domain, it is a highly characterized geothermal system in the Basin and Range with a considerable amount of geoscience and most importantly, well data. The overall project area is 2500km2 with the Calibration Area (Dixie Valley Geothermal Wellfield) being about 170km2. The project was subdivided into five tasks (1) collect and assess the existing public domain geoscience data; (2) design and populate a GIS database; (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area at 0.5km intervals to identify EGS drilling targets at a scale of 5km x 5km; (4) collect new geophysical and geochemical data, and (5) repeat Task 3 for the enhanced (baseline + new ) data. Favorability maps were based on the integrated assessment of the three critical EGS exploration parameters of interest: rock type, temperature and stress. A complimentary trust map was generated to compliment the favorability maps to graphically illustrate the cumulative confidence in the data used in the favorability mapping. The Final Scientific Report (FSR) is submitted in two parts with Part I describing the results of project Tasks 1 through 3 and Part II covering the results of project Tasks 4 through 5 plus answering nine questions posed in the proposal for the overall project. FSR Part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature. However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region.

15 GEOTHERMAL ENERGY↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Framework for Probabilistic Projections of Energy-Relevant Streamflow Indicators under Climate Change Scenarios for the U.S.

This project focuses on uncertainty in streamflow forecasting under climate change conditions. The objective is to develop easy to use methodologies that can be applied across a range of river basins to estimate changes in water availability for realistic projections of climate change. There are three major components to the project: Empirical downscaling of regional climate change projections from a range of Global Climate Models; Developing a methodology to use present day information on the climate controls on the parameterizations in streamflow models to adjust the parameterizations under future climate conditions (a trading-space-for-time approach); and Demonstrating a bottom-up approach to establishing streamflow vulnerabilities to climate change. The results reinforce the need for downscaling of climate data for regional applications, and further demonstrates the challenges of using raw GCM data to make local projections. In addition, it reinforces the need to make projections across a range of global climate models. The project demonstrates the potential for improving streamflow forecasts by using model parameters that are adjusted for future climate conditions, but suggests that even with improved streamflow models and reduced climate uncertainty through the use of downscaled data, there is still large uncertainty is the streamflow projections. The most useful output from the project is the bottom-up vulnerability driven approach to examining possible climate and land use change impacts on streamflow. Here, we demonstrate an inexpensive and easy to apply methodology that uses Classification and Regression Trees (CART) to define the climate and environmental parameters space that can produce vulnerabilities in the system, and then feeds in the downscaled projections to determine the probability top transitioning to a vulnerable sate. Vulnerabilities, in this case, are defined by the end user.

54 ENVIRONMENTAL SCIENCES↗

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗