Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Periodic systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Ever Changing X-ray Sky: X-ray Transients Observed With BATSE

X-ray transients are typically sources in our own galaxy. They are called "transient" because they usually spend more time in quiescence than in outburst. These transients consist of a compact object and a "normal" star in a binary system. The compact objects in some of these systems are known to be neutron stars because they exhibit X-ray bursts or periodic pulsations, Other systems are believed to contain black holes based upon their outburst behavior and in some cases, optical measurements of their masses. The Burst and Transient Source Experiment (BATSE), one of 4 instruments on the Compton Gamma Ray Observatory, was an all-sky instrument sensitive to photons from about 20 keV to 2 MeV, designed primarily to detect gamma-ray bursts. Transient and persistent hard X-ray point sources were extracted from the data using the Earth occultation method to measure source intensities. In this method, the change in count rate in a BATSE detector was measured just before and just after a source location was occulted by the Earth. For long period pulsars (>1 second) Fourier transforms and epoch-folded searches were used to measure pulse frequency and pulsed flux. Using these methods, 3 black hole candidates and 6 X-ray pulsars were discovered with BATSE during its 9 years in orbit. BATSE provided unprecedented temporal coverage in the 20 keV - 2 MeV band, allowing detection of numerous new outbursts of X-ray transients. In this talk, I will describe the BATSE instrument, discuss methods we use to detect hard X-ray sources, and describe observations of X-ray transients.

Wilson-Hodge, Colleen A.↗

Large liquid rocket engine transient performance simulation system

Phase 1 of the Rocket Engine Transient Simulation (ROCETS) program consists of seven technical tasks: architecture; system requirements; component and submodel requirements; submodel implementation; component implementation; submodel testing and verification; and subsystem testing and verification. These tasks were completed. Phase 2 of ROCETS consists of two technical tasks: Technology Test Bed Engine (TTBE) model data generation; and system testing verification. During this period specific coding of the system processors was begun and the engineering representations of Phase 1 were expanded to produce a simple model of the TTBE. As the code was completed, some minor modifications to the system architecture centering on the global variable common, GLOBVAR, were necessary to increase processor efficiency. The engineering modules completed during Phase 2 are listed: INJTOO - main injector; MCHBOO - main chamber; NOZLOO - nozzle thrust calculations; PBRNOO - preburner; PIPE02 - compressible flow without inertia; PUMPOO - polytropic pump; ROTROO - rotor torque balance/speed derivative; and TURBOO - turbine. Detailed documentation of these modules is in the Appendix. In addition to the engineering modules, several submodules were also completed. These submodules include combustion properties, component performance characteristics (maps), and specific utilities. Specific coding was begun on the system configuration processor. All functions necessary for multiple module operation were completed but the SOLVER implementation is still under development. This system, the Verification Checkout Facility (VCF) allows interactive comparison of module results to store data as well as provides an intermediate checkout of the processor code. After validation using the VCF, the engineering modules and submodules were used to build a simple TTBE.

Mason, J. R.↗

Spacecraft dynamics characterization and control system failure detection, volume 1

The work under this grant has been directed to two aspects of the control of flexible spacecraft: (1) the modeling of deployed or erected structures including nonlinear joint characteristics; and (2) the detection and isolation of failures of the components of control systems for large space structures. The motivation for the first of these research tasks is the fact that very large assemblies in space will have to be built or deployed in situ. A likely scenario is, in fact, a combination of these wherein modules which are folded for transportation into orbit are erected to their final configuration and then jointed with other such erected modules to form the full assembly. Any such erectable modules will have joints. It remains to be seen whether or not joints designed for operational assemblies will have nonlinear properties, but it seems prudent to develop a methodology for dealing with that possibility. The motivation for the second of these research tasks is the fact that we foresee large assemblies in space which will require active control to damp vibrations and/or hold a desired shape. Lightweight structures will be very flexible, with many elastic modes having very low frequencies. In order to control these modes well, the control system will likely require many sensors and many actuators, probably distributed over much of the structure. The combination of a large number of control system components with long operational periods virtually guarantees that these systems will suffer control system component failures during operation. The control system must be designed to tolerate failures of some sensors and actuators, and still be able to continue to perform its function.

Source record↗

Propellant and Purge System Contamination "2007: A Summer of Fun"

This slide presentation reviews the propellant and purge system contamination that occurred during the summer of 2007 at Stennis Space Center. During this period Multiple propellant/pressurant system contamination events prompted a thorough investigation, the results of which are reviewed.

Galloway, Randy↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

Evaluation of eddy-current proximity devices for measuring thin potassium film thicknesses

Two eddy current proximity probe systems were tested over a range of 0 to 508 micrometers (0 to 20 mils) of simulated potassium film thicknesses for simulated temperatures of 66 C (150 F), 232 C (450 F), and 666 C (1230 F). The results of short time calibration tests are presented. Instrument drift was a problem throughout the testing and, without correction, may limit the use of such systems to short periods of time. Additional development will be required prior to their being usable as practical instrumentation systems.

Asadourian, A. S.↗

Comparative studies of lunar, Martian, and Mercurian craters and plains

The spatial distribution of lunar smooth plains is not consistent with experimental simulations of melt rock emplacement during cratering in layered materials. Nor is it consistent with the location of melt rocks (suevite) near the Ries basin. Lunar smooth plains surrounding Imbrium are most extensive in areas where pre-existing craters are most degraded. This observation suggests that plains form by impact of basin and local primary crater ejecta, together with deposition of debris excavated by the resultant secondary cratering events. Craters within the belt of smooth plains surrounding the Caloris basin on Mercury are most degraded nearest the basin; this suggests that Mercurian smooth plains must, at least in part, be emplaced in a manner similar to plains surrounding the Imbrium basin. Mercurian uplands have a primary crater population deficient in small crater diameters (less than approximately 30 km). Lunar uplands far from major basins also have a crater population deficient in small crater sizes. Martian cratered terrain exhibits a similar crater deficiency, which was previously interpreted as due to obliteration of small craters (less than approximately 30 km) by some surface process. A crater size distribution deficient in small sizes (less than approximately 30 km) on the Mercurian, lunar, and Martian uplands has implications for the origin of debris bombarding the inner solar system during the period recorded by these surfaces. It is proposed that during late heavy bombardment, the inner solar system was inundated with bodies that broke up under tidal fission as they approached the planets. Such a mechanism would lend to production of a crater population deficient in small crater sizes, and it would also explain the large degree of spatial clustering of primary craters on Mercury, the moon, and Mars.

Oberbeck, V. R.↗

The Influence of Sound Cues on the Maintenance of Temporal Organization in the Sprague-Dawley Rat

Temporal organization is a fundamental property of living matter. From single cells to complex animals including man, most physiological systems undergo daily periodic changes in concert with environmental cues (e.g., light, temperature etc.). It is known that pulsed Environmental synchronizers, zeitgebers, (e.g. light) can modify rhythm parameters. Rhythm stability is a necessary requirement for most animal experiments. The extent to which sound can influence the circadian system of laboratory rats is poorly understood. This has implications to animal habitats in the novel environments of the Space-Laboratory or Space Station. A series of three white noise (88+/-0.82 db) zeitgeber experiments were conducted (n=6/experiment).The sound cue was introduced in the circadian free-running phase (DD-NQ) and in one additional case sound was added to the usual photoperiod (12L:12D) to determine masking effects. Circadian rhythm parameters of drinking frequency, feeding frequency, and gross locomotor activity were continuously monitored. Data analysis for these studies included macroscopic and microscopic methods. Raster plots to visually detect entrainment versus free-running period, were plotted for each animal, for all three parameters, during all sound perturbation tested. These data were processed through a series of detrending (robust locally weighted regression analyses) and complex demodulation analyses. In summary, these findings show that periodic "white" noise "influences" the rats circadian system but does not "entrain" the feeding, drinking or locomotor activity rhythms.

Winget, C. M.↗

Orbital coplanarity in solar-type binary systems: Implications for planetary system formation and detection

The equatorial inclinations of solar-type stars within visual binary systems are computed by combining v sin i measurements with rotational period information, or with expected rotational velocities based upon the age of the star in question. These inclinations are then compared with the orbital inclinations of the systems to test the alignment between the equatorial and orbital planes, and how the tendency for or against coplanarity varies as a function of parameters such as spectral type, separation, eccentricity, etc. The results are extended to planetary systems in order to determine the appropriateness of basing planetary search strategies upon a parent star's equatorial inclination, and to address issues in planetary system formation and evolution, including the stability of planetary orbits within binary systems. During the course of this project new or improved v sin i measurements are made for over 30 solar-type stars within binary systems, and (for the purposes of the study) tentative orbits are computed for thirteen long-period systems. The results suggest that approximate coplanarity between the equatorial and orbital planes exists solar-type binary systems with separations less than 30-40 AU. The coplanarity tendency, as well as this 'critical separation,' is not significantly affected by most of the other parameters studied. The one significant exception occurs with hierarchical multiple systems, where noncoplanarity may exist at relatively small separations. If it is assumed that planetary distances in our solar system are typical, the results suggest there is no reason to expect planets to orbit in planes significantly different from that of the parent star's equator, in turn suggesting that planetary formation models and search strategies dependent upon this assumption are valid from this standpoint. The results also suggest that noncoplanarity between the components of a binary system is not a significant issue in addressing the stability of planetary orbits within the system.

Hale, Alan↗

Two-story residence with solar heating--Newman, Georgia

Report evaluates performance of warm-air collector system for 11 month period and provides operation and maintenance information. System consists of 14 warm air collectors, rock-storage bin, air handler, heat exchangers, hot-water preheat tank, associated controls, plumbing, and air ducting. Average building temperature was maintained at 72 F (22 C); solar equipment provided 47 percent of space-heating requirement.

Source record↗

Turbulence Climatology at Dallas/Ft.Worth (DFW) Airport: Implications for a Departure Wake Vortex Spacing System

Potential adaptive wake vortex spacing systems may need to rely on wake vortex decay rather than wake vortex transport in reducing wake separations. A wake vortex takeoff-spacing system in particular will need to rely on wake decay. Ambient turbulence is the primary influence on wake decay away from the ground. This study evaluated 18 months of ambient turbulence measurements at Dallas/Ft. Worth (DFW) Airport. The measurements show minor variation in the turbulence levels at various times of the year or times of the day for time periods when a departure system could be used. Arrival system operation was also examined, and a slightly lower overall turbulence level was found as compared to departure system benefit periods. The Sarpkaya model, a validated model of wake vortex behavior, was applied to various turbulence levels and compared to the DFW turbulence statistics. The results show that wake vortices from heavy aircraft on takeoff should dissipate within one minute for the majority of the time and will rarely last two minutes. These results will need to be verified by wake vortex measurements on departure.

Perras, G. H.↗

Synthesis Methods for Robust Passification and Control

The research effort under this cooperative agreement has been essentially the continuation of the work from previous grants. The ongoing work has primarily focused on developing passivity-based control techniques for Linear Time-Invariant (LTI) systems. During this period, there has been a significant progress made in the area of passivity-based control of LTI systems and some preliminary results have also been obtained for nonlinear systems, as well. The prior work has addressed optimal control design for inherently passive as well as non- passive linear systems. For exploiting the robustness characteristics of passivity-based controllers the passification methodology was developed for LTI systems that are not inherently passive. Various methods of passification were first proposed in and further developed. The robustness of passification was addressed for multi-input multi-output (MIMO) systems for certain classes of uncertainties using frequency-domain methods. For MIMO systems, a state-space approach using Linear Matrix Inequality (LMI)-based formulation was presented, for passification of non-passive LTI systems. An LMI-based robust passification technique was presented for systems with redundant actuators and sensors. The redundancy in actuators and sensors was used effectively for robust passification using the LMI formulation. The passification was designed to be robust to an interval-type uncertainties in system parameters. The passification techniques were used to design a robust controller for Benchmark Active Control Technology wing under parametric uncertainties. The results on passive nonlinear systems, however, are very limited to date. Our recent work in this area was presented, wherein some stability results were obtained for passive nonlinear systems that are affine in control.

Kelkar, Atul G.↗

An analytical study and wind tunnel tests of an aeromechanical gust-alleviation system for a light airplane

The results of an analytical study of a system using stability derivatives determined in static wind tunnel tests of a 1/6 scale model of a popular, high wing, light airplane equipped with the gust alleviation system are reported. The longitudinal short period mode dynamics of the system are analyzed, and include the following: (1) root loci, (2) airplane frequency responses to vertical gusts, (3) power spectra of the airplane responses in a gust spectrum, (4) time history responses to vertical gusts, and (5) handling characteristics. The system reduces the airplane's normal acceleration response to vertical gusts while simultaneously increasing the pitching response and reducing the damping of the longitudinal short period mode. The normal acceleration response can be minimized by using the proper amount of static alleviation and a fast response system with a moderate amount of damping. The addition of a flap elevator interconnect or a pitch damper system further increases the alleviation while moderating the simultaneous increase in pitching response. The system provides direct lift control and may reduce the stick fixed longitudinal static stability.

Stewart, E. C.↗

Theory of a general class of dissipative processes.

Development of a theory of periodic processes that is of sufficient generality for being applied to systems defined by partial differential equations (distributed parameter systems) and functional differential equations of the retarded and neutral type (hereditary systems), as well as to systems arising in the theory of elasticity. In particular, the attempt is made to develop a meaningful general theory of dissipative periodic systems with a wide range of applications.

Hale, J. K.↗

Modelling chaotic vibrations using NASTRAN

Due to the unavailability and, later, prohibitive cost of the computational power required, many phenomena in nonlinear dynamic systems have in the past been addressed in terms of linear systems. Linear systems respond to periodic inputs with periodic outputs, and may be characterized in the time domain or in the frequency domain as convenient. Reduction to the frequency domain is frequently desireable to reduce the amount of computation required for solution. Nonlinear systems are only soluble in the time domain, and may exhibit a time history which is extremely sensitive to initial conditions. Such systems are termed chaotic. Dynamic buckling, aeroelasticity, fatigue analysis, control systems and electromechanical actuators are among the areas where chaotic vibrations have been observed. Direct transient analysis over a long time period presents a ready means of simulating the behavior of self-excited or externally excited nonlinear systems for a range of experimental parameters, either to characterize chaotic behavior for development of load spectra, or to define its envelope and preclude its occurrence.

Sheerer, T. J.↗

Data Assimilation Office (DAO) Operational Analyses and Reanalyses for Coordinated Enhanced Observing Period (CEOP)

The DAO operational assimilation system has produced and archived gridded data since 1998, and will continue through the CEOP period. However, major system upgrades and new assimilation variables will significantly affect the surface energy balance and data product. These changes will be discussed and the prospects for a CEOP reanalysis will be presented. W e will also review the data currently available and describe how to access the data.

Bosilovich, M.↗

Can the 62 Day X-ray Period of ULX M82 X-1 Be Due to a Precessing Accretion Disk?

We have analyzed all the archival RXTE/PCA monitoring observations of the ultraluminous X-ray source (ULX) M82 X-1 in order to study the properties of its previously discovered 62 day X-ray period (Kaaret & Feng 2007). Based on the high coherence of the modulation it has been argued that the observed period is the orbital period of the binary. Utilizing a much longer data set than in previous studies we find: (1) The phase-resolved X-ray (3-15 keV) energy spectra - modeled with a thermal accretion disk and a power-law corona - suggest that the accretion disk's contribution to the total flux is responsible for the overall periodic modulation while the power-law flux remains approximately constant with phase. (2) Suggestive evidence for a sudden phase shift-of approximately 0.3 in phase (20 days)-between the first and the second halves of the light curve separated by roughly 1000 days. If confirmed, the implied timescale to change the period is approx. = 10 yrs, which is exceptionally fast for an orbital phenomenon. These independent pieces of evidence are consistent with the 62 day period being due to a precessing accretion disk, similar to the so-called super-orbital periods observed in systems like Her X-1, LMC X-4, and SS433. However, the timing evidence for a change in the period needs to be confirmed with additional observations. This should be possible with further monitoring of M82 with instruments such as the X-ray telescope (XRT) on board Swift.

ULX M82↗