Heavy quark spin symmetry breaking in near-threshold J PC =1 -- quarkoniumlike resonances
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
Strange multibaryon states with {Lambda}-hyperon and K{sub s}{sup 0} -meson subsystems has been studied from 700 000 stereo photographs or 10{sup 6} inelastic interactions which was obtained from expose of 2-m propane bubble chamber (PBC) LHEP, JINR to proton beams at 10 GeV/c. The obtained results from PBC can be divided into three subjects: in-medium effects of hadronic particles; baryon spectroscopy; hyper-nucleus production. At present the experimental situation is confused; so is theory. New accelerator research complexes has unique possibility for high-statistic and 4{pi}-geometry study of exotic states.
We report Lithium-Ion batteries are being considered as a high-energy density replacement for Nickel Metal Hydride (NiMH) batteries in Hybrid Electric Vehicles (HEVs) and in the new Plug-In Hybrids (PHEVs). Although these cells can result in significant reduction in weight and volume, they have several safety related issues that still need to be addressed. We report here on the thermal response of Li-ion cells specifically assembled in our laboratory to test new materials, electrolytes and additives. Finally, improvements in the thermal abuse tolerance of cells are reported and discussed in terms of the need for overall battery system safety.
Capillary Pressure to Relative Permeability water-wet algorithm.
These excel spreadsheets were used to develop the two-phase and three-phase methods for converting capillary pressure to relative permeability. Data was collected by the SWP and literature sources cited in the spreadsheets.
Explore the source record for details and available documents.
The first objective of this project was to develop, evaluate and compare two different CO2 separation (capture) systems. The second was to carry the preferred solution to pre-pilot development and testing. To achieve these objectives we undertook several infrastructure enabling elements: (1) development of a preferred catalyst coupled with its immobilization onto a microporous polymer membrane, (2) design and development of a microporous membrane-based, contained liquid membrane permeator and a membrane-based absorber/desorber apparatus, (3) development of a resin-wafer electrodialytic absorber/desorber apparatus, (4) development and demonstration of a pre-treatment process to condition the feed gas stream, (5) and development of computer modeling of the components and of the integrated system. The first technology was an enzyme catalyzed, membrane supported, contained liquid membrane apparatus whose gas capture was pressure/vacuum and temperature driven. A first embodiment was as a permeator, i.e. a combined absorber/desorber in a single housing. The second embodiment was as discrete absorber and desorber units. The second technology was an enzyme catalyzed, ion exchange resin wafer electrodialytically-based separation. For each of these technologies the objective was to design, manufacture, test and demonstrate the apparatus, first in the laboratory and then at pre-pilot scale, and to run it for sufficient time at the pre-pilot scale to demonstrate stability even in the face of upset. Tests would include several ranks of coal, which had been appropriately pre-treated to remove NOx, SOx and particles, to a pre-determined acceptance level, as a basis for demonstrating efficient CO{sub 2} capture. The pre-pilot tests would be run at the Energy and Environmental Research Center (EERC) in North Dakota. A larger scale test (400m{sup 2} test unit) would later be run also at EERC. An economic goal was to compare the cost of CO{sub 2} capture by each of these methods with values obtained when using MEA (monoethanolamine) as a baseline case. Other metrics included capital and operating expense, parasitic loss and cost of electricity. A final goal was to carry out an initial examination of market forces to understand what barriers to entry for installation of CO{sub 2} capture equipment might exist and their relative importance.
During the second iteration of the US NDC Modernization Elaboration phase (E2), the SNL US NDC Modernization project team completed follow-on COTS surveys & exploratory prototyping related to the Object Storage & Distribution (OSD) mechanism, and the processing control software infrastructure. This report summarizes the E2 prototyping work.
This thesis studied properties of the charmonium-like X(3872) state, which is an exotic matter candidate. The measurements are performed using a data sample collected with the CDF experiment.
This presentation is to be given at the 2017 Annual Health Physics Society Meeting, July 11. This is the presentation for the abstract which went through review in February, 2017 (STIP 690075). The audience consists of air monitoring experts from across the DOE complex. They are familiar with the CAP88 model and radiological terminology.
The PSL has reviewed the documentation and data provided by NNSS–Livermore Operations with respect to this proficiency test. This proficiency test was performed to assess NNSS–Livermore Operations’ ability to perform scattering parameter calibrations. The level of documentation was satisfactory. On 12/28/2021, NNSS–Livermore Operations reported the data for the proficiency test conducted on the attenuator. NNSS–Livermore Operations performed this proficiency test using an Anritsu vector network analyzer, an electronic calibration module, and verification kit. The PSL used a Keysight vector network analyzer and mechanical calibration kit. The PSL results included in this proficiency test report were taken on June 23, 2020.
The PSL has reviewed the documentation and data provided by NNSS–Livermore Operations with respect to this proficiency test. This proficiency test was performed to assess NNSS–Livermore Operations’ ability to perform scattering parameter calibrations. The level of documentation was satisfactory. On 5/19/2020, NNSS–Livermore Operations reported the data for the proficiency test conducted on the attenuator. NNSS–Livermore Operations performed this proficiency test using an Anritsu vector network analyzer, an electronic calibration module, and verification kit. The PSL used a Keysight vector network analyzer and mechanical calibration kit. The PSL results included in this proficiency test report were taken on June 23, 2020.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
Explore the source record for details and available documents.