Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PWR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Partial defect verification of spent fuel assemblies by PDET: Principle and field testing in Interim Spent fuel Storage Facility (CLAB) in Sweden

Here, the need for the development of a credible method and instrument for partial defect verification of spent fuel has been emphasized over a few decades in the safeguards communities as the diverted spent fuel pins can be the source of nuclear terrorism or devices. The need is increasingly more important and even urgent as many countries have started to transfer spent fuel to so called "difficult-to-access" areas such as dry storage casks, reprocessing or geological repositories. Partial defect verification is required by IAEA before spent fuel is placed into "difficult-to-access" areas. Earlier, Lawrence Livermore National Laboratory (LLNL) has reported the successful development of a new, credible partial defect verification method for pressurized water reactor (PWR) spent fuel assemblies without use of operator data, and further reported the validation experiments using commercial spent fuel assemblies with some missing fuel pins. The method was found to be robust as the method is relatively invariant to the characteristic variations of spent fuel assemblies such as initial fuel enrichment, cooling time, and burn-up. Since then, the PDET system has been designed and prototyped for 17×17 PWR spent fuel assemblies, complete with data acquisition software and acquisition electronics. In this paper, a summary description of the PDET development followed by results of the first successful field testing using the integrated PDET system and actual spent fuel assemblies performed in a commercial spent fuel storage site, known as Central Interim Spent fuel Storage Facility (CLAB) in Sweden will be presented. In addition to partial defect detection initial studies have determined that the tool can be used to verify the operator declared average burnup of the assembly as well as intra-assembly bunrup levels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-pack Disposal Concepts for Spent Fuel (Rev. 0)

At the initiation of the Used Fuel Disposition (UFD) R&D campaign, international geologic disposal programs and past work in the U.S. were surveyed to identify viable disposal concepts for crystalline, clay/shale, and salt host media (Hardin et al., 2012). Concepts for disposal of commercial spent nuclear fuel (SNF) and high-level waste (HLW) from reprocessing are relatively advanced in countries such as Finland, France, and Sweden. The UFD work quickly showed that these international concepts are all “enclosed,” whereby waste packages are emplaced in direct or close contact with natural or engineered materials . Alternative “open” modes (emplacement tunnels are kept open after emplacement for extended ventilation) have been limited to the Yucca Mountain License Application Design (CRWMS M&O, 1999). Thermal analysis showed that, if “enclosed” concepts are constrained by peak package/buffer temperature, waste package capacity is limited to 4 PWR assemblies (or 9-BWR) in all media except salt. This information motivated separate studies: 1) extend the peak temperature tolerance of backfill materials, which is ongoing; and 2) develop small canisters (up to 4-PWR size) that can be grouped in larger multi-pack units for convenience of storage, transportation, and possibly disposal (should the disposal concept permit larger packages). A recent result from the second line of investigation is the Task Order 18 report: Generic Design for Small Standardized Transportation, Aging and Disposal Canister Systems (EnergySolution, 2015). This report identifies disposal concepts for the small canisters (4-PWR size) drawing heavily on previous work, and for the multi-pack (16-PWR or 36-BWR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Pack Disposal Concepts for Spent Fuel (Revision 1)

At the initiation of the Used Fuel Disposition (UFD) R&D campaign, international geologic disposal programs and past work in the U.S. were surveyed to identify viable disposal concepts for crystalline, clay/shale, and salt host media. Concepts for disposal of commercial spent nuclear fuel (SNF) and high-level waste (HLW) from reprocessing are relatively advanced in countries such as Finland, France, and Sweden. The UFD work quickly showed that these international concepts are all “enclosed,” whereby waste packages are emplaced in direct or close contact with natural or engineered materials . Alternative “open” modes (emplacement tunnels are kept open after emplacement for extended ventilation) have been limited to the Yucca Mountain License Application Design. Thermal analysis showed that if “enclosed” concepts are constrained by peak package/buffer temperature, that waste package capacity is limited to 4 PWR assemblies (or 9 BWR) in all media except salt. This information motivated separate studies: 1) extend the peak temperature tolerance of backfill materials, which is ongoing; and 2) develop small canisters (up to 4-PWR size) that can be grouped in larger multi-pack units for convenience of storage, transportation, and possibly disposal (should the disposal concept permit larger packages). A recent result from the second line of investigation is the Task Order 18 report: Generic Design for Small Standardized Transportation, Aging and Disposal Canister Systems. This report identifies disposal concepts for the small canisters (4-PWR size) drawing heavily on previous work, and for the multi-pack (16-PWR or 36-BWR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thorium Fuel Options for Sustained Transuranic Burning in Pressurized Water Reactors - 12381

As described in companion papers, Westinghouse is proposing the adoption of a thorium-based fuel cycle to burn the transuranics (TRU) contained in the current Used Nuclear Fuel (UNF) and transition towards a less radio-toxic high level waste. A combination of both light water reactors (LWR) and fast reactors (FR) is envisaged for the task, with the emphasis initially posed on their TRU burning capability and eventually to their self-sufficiency. Given the many technical challenges and development times related to the deployment of TRU burners fast reactors, an interim solution making best use of the current resources to initiate burning the legacy TRU inventory while developing and testing some technologies of later use is desirable. In this perspective, a portion of the LWR fleet can be used to start burning the legacy TRUs using Th-based fuels compatible with the current plants and operational features. This analysis focuses on a typical 4-loop PWR, with 17x17 fuel assembly design and TRUs (or Pu) admixed with Th (similar to U-MOX fuel, but with Th instead of U). Global calculations of the core were represented with unit assembly simulations using the Linear Reactivity Model (LRM). Several assembly configurations have been developed to offer two options that can be attractive during the TRU transmutation campaign: maximization of the TRU transmutation rate and capability for TRU multi-recycling, to extend the option of TRU recycling in LWR until the FR is available. Homogeneous as well as heterogeneous assembly configurations have been developed with various recycling schemes (Pu recycle, TRU recycle, TRU and in-bred U recycle etc.). Oxide as well as nitride fuels have been examined. This enabled an assessment of the potential for burning and multi-recycling TRU in a Th-based fuel PWR to compare against other more typical alternatives (U-MOX and variations thereof). Results will be shown indicating that Th-based PWR fuel is a promising option to multi-recycle and burn TRU in a thermal spectrum, while satisfying top-level operational and safety constraints. Various assembly designs have been proposed to assess the TRU burning potential of Th-based fuel in PWRs. In addition to typical homogeneous loading patterns, heterogeneous configurations exploiting the breeding potential of thorium to enable multiple cycles of TRU irradiation and burning have been devised. The homogeneous assembly design, with all pins featuring TRU in Th, has the benefit of a simple loading pattern and the highest rate of TRU transmutation, but it can be used only for a few cycles due to the rapid rise in the TRU content of the recycled fuel, which challenges reactivity control, safety coefficients and fuel handling. Due to its simple loading pattern, such assembly design can be used as the first step of Th implementation, achieving up to 3 times larger TRU transmutation rate than conventional U-MOX, assuming same fraction of MOX assemblies in the core. As the next step in thorium implementation, heterogeneous assemblies featuring a mixed array of Th-U and Th-U-TRU pins, where the U is in-bred from Th, have been proposed. These designs have the potential to enable burning an external supply of TRU through multiple cycles of irradiation, recovery (via reprocessing) and recycling of the residual actinides at the end of each irradiation cycle. This is achieved thanks to a larger breeding of U from Th in the heterogeneous assemblies, which reduces the TRU supply and thus mitigates the increase in the TRU core inventory for the multi-recycled fuel. While on an individual cycle basis the amount of TRU burned in the heterogeneous assembly is reduced with respect to the homogeneous design, TRU burning rates higher than single-pass U-MOX fuel can still be achieved, with the additional benefits of a multi-cycle transmutation campaign recycling all TRU isotopes. Nitride fuel, due its higher density and U breeding potential, together with its better thermal properties, ideally suits the objectives and constraints of the heterogeneous assemblies. However, significant technological advancements must be made before nitride fuels can be employed in an LWR: its water resistance needs to be improved and a viable technology to enrich N in N-15 must be devised. Moreover, for the nitride heterogeneous configurations examined in this study, the enhancement in TRU burning performance is achieved not only by replacing oxide with nitride fuel, but also by increasing the fuel rod size. This latter modification, allowed by the high thermal conductivity of nitride fuel, leads however to a very tight lattice, which may challenge reactor coolant pumps and assembly hold-down mechanisms, the former through an increase in core pressure drop and the latter through an increase in assembly lift-off forces. To alleviate these issues, while still achieving the large fuel-to-moderator ratios resulting from using tight lattices, wire wraps could be used in place of grid spacers. For tight lattices, typical grid spacers are hard to manufacture and their replacement with wire wraps is known to allow for a pressure drop reduction by at least 2 times. The studies, while certainly very preliminary, provide a starting point to devise an optimum strategy for TRU transmutation in Th-based PWR fuel. The viability of the scheme proposed depends on the timely phasing in of the associated technologies, with proper lead time and to solve the many challenges. These challenges are certainly substantial, and make the current once-through U-based scheme pursued in the US by far a more practical (and cheaper) option. However, when compared to other transmutation schemes, the proposed one has arguably similar challenges and unknowns with potentially bigger rewards. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Critical heat flux impact due to cladding surface condition

This paper demonstrates how the cladding surface condition can impact fuel rod heat transfer and critical heat flux (CHF) performance at Pressurized Water Reactor (PWR) type conditions. The cladding surface that is investigated here is a surface with a crud deposit similar to ones observed in a PWR reactor. Tests are performed in the Westinghouse WALT (Westinghouse Advanced Loop Tester) loop test facility where a single ZIRLO clad electrically heated rod with approximately one-foot length is tested at PWR thermal hydraulic conditions and chemistry. Tests are performed for a normal clean rod surface, an oxide surface and with CRUD deposits to investigate the impact on fuel rod heat transfer and CHF performance. The CRUD deposit is characterized for thickness, chimney size and porosity. Test results are presented for the different cladding surface conditions along with comparisons to evaluations performed in the literature for different surfaces at pool boiling conditions. The results indicate that the WALT loop test facility can produce CHF test results which are repeatable for the same heater rod and for different rods with the same surface condition. CHF test results for a ZIRLO cladding surface with a CRUD deposit near 20 microns typical of PWR deposits show similar CHF performance to clean rod surfaces. A noticeable increase in CHF performance was observed for a ZIRLO cladding surface with a thermal oxide layer based on one CHF measurement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance Assessment of a Generic Nuclear Waste Repository in Shale - 18392

A performance assessment (PA) is an important component of a comprehensive safety analysis for a nuclear waste repository. In a PA, probabilistic simulations of the total repository system are performed, and results are evaluated against performance metrics. Uncertainty and sensitivity analyses help prioritize additional research and model development. The United States Department of Energy (DOE) has been developing a state of the art PA simulation software tool-kit, Geologic Disposal Safety Assessment (GDSA) Framework, that couples increasingly higher fidelity models of subsystem processes into total system PA simulations. Over the past several years, PAs of generic repositories in three geologic media (salt, shale, and crystalline rock) have demonstrated ongoing developments in capability. The current PA of a nuclear waste repository in a generic shale formation showcases GDSA Framework, including capabilities in domain discretization (Cubit), multi-physics simulations (PFLOTRAN), uncertainty and sensitivity analysis (Dakota), and visualization (Paraview). The generic shale reference case considers the disposal of 22,000 metric tons heavy metal of commercial spent nuclear fuel (SNF) in a generic shale formation. PA simulations account for the thermal load and radionuclide inventory of the waste form, components of the engineered barrier system including waste package and buffer, and components of the natural barrier system including the host rock shale and underlying and overlying stratigraphic units. Two repository layouts are considered, one for emplacement of waste packages containing 12 pressurized water reactor (PWR) assemblies, and one for 4-PWR waste package emplacement. Model domains are half-symmetry and contain between 7 and 22 million grid cells. Grid refinement captures the detail of individual waste packages, emplacement drifts, access drifts, and shafts. Simulations are run in a high-performance computing (HPC) environment on 512 or 2048 processes. The governing equations describing coupled heat and fluid flow and reactive transport are solved with PFLOTRAN, an open-source, massively parallel multiphase flow and reactive transport code. Additional simulated processes include waste package degradation; waste form dissolution; radioactive decay and ingrowth in aqueous, solid, and adsorbed phases; and a simple biosphere based on a pumping well. Simulations are run to 106 y; dose and radionuclide concentrations are observed within aquifers at a point approximately 5 km downgradient of the repository. Dakota is used to sample likely ranges of input parameters including waste form and waste package degradation rates and properties of engineered and natural materials to quantify uncertainty in predicted concentrations and sensitivity to input parameters. Given the assumptions of the reference case, results of 12-PWR and 4-PWR simulations are very similar. Dose at the pumping well 5-km downgradient of the repository does not exceed 10-9 Sv/y. I-129 is the largest contributor to dose. The dose due to Cl-36, the next largest contributor, is orders of magnitude smaller. At the pumping well, the concentration of I-129 5-km downgradient does not exceed 10-14 mol/L. Rank correlation coefficients indicate that the maximum concentration of I-129 within the aquifer is sensitive to shale (repository host rock) porosity and aquifer permeability. These results affirm that HPC-capable codes can be used to simulate important multi-physics couplings directly in a total system performance assessment of a geologic repository, and can be used in prioritization of future research and model development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Isotope Fidelity on Fuel Cycle Calculations

The purpose of this study is to examine the importance of the isotopic composition of plutonium on PWR MOX fuel fabrication as part of a multi-tiered fuel cycle, and the effect of its evolution during a transition. Two main effects can modify the isotopic composition of the plutonium used to build the PWR-MOX fuel: decay and depletion. This analysis is based on a transition of the nuclear fuel cycle to a configuration identified as 'Evaluation Group 29' or 'EG29', in the recently-published Evaluation and Screening (E and S) report. The EG29 fuel cycle corresponds to a double strata fleet. The first stratum is composed of sodium-cooled fast reactors (SFRs) multi-recycling plutonium. Surplus plutonium is sent to the second stratum composed of pressurized water reactors with full mixed oxide (U/Pu)O{sub 2} cores (MOX-PWRs). The PWR stratum is also multi-recycling its plutonium. The target energy generation ratio for the final EG29 system is 70:30 (SFR:PWR), with a 1% annual growth in nuclear energy demand. All the calculation of this study have been performed using the Cyclus fuel cycle simulator framework. The facility models are from the Cycamore package, developed by the Cyclus team, and containing a Pu-equivalent fuel fabrication model as well as a simple fixed mixing ratio fuel fabrication model. A new neural network model has also been contributed to the Cyclus environment using the cyCLASS tool, allowing the use of the fuel fabrication and depletion models from the CLASS tool in Cyclus. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Recent activities regarding the use of burnup credit in France - 14539

Burnup credit refers to the concept of taking credit for the reduction in reactivity due to irradiation of nuclear fuel. A working group, bringing together several French nuclear companies and institutions (AREVA, CEA, EDF and IRSN), was created in 1997 to analyze different propositions to introduce a limited number of fission products together with a more realistic axial burnup profile into the criticality safety studies for the nuclear fuel cycle. Initially, the discussions of the working group focused on PWR UOX fuel. The work and accomplishments performed by this working group on burnup credit regarding PWR UOX fuel assemblies has been presented in various publications. This paper gives an outlook of the French working group on burnup credit activities afterwards. These activities relate to industrial applications of burnup credit for PWR UOX fuel, burnup credit implementation for PWR MOX fuel allowing the plutonium recycling in French PWRs, as well as applications for BWR UOX fuel since it may be transported, stored and reprocessed in France. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Discerning the effect of various irradiation modes on the corrosion of Zircaloy-4

Using proton irradiation, this study investigates the individual influence of several factors on the corrosion kinetics of Zircaloy-4 in a hydrogenated water environment simulating a Pressurized Water Reactor (PWR). Using both simultaneous irradiation-corrosion and autoclave corrosion, we separately examine: (i) the effect of pre-irradiation on modifying the structure of the material, (ii) the impact of irradiation on creating defects in the growing oxide layer during corrosion, and (iii) the influence of irradiation on increasing the corrosion potential through radiolysis during corrosion. To replicate neutron-irradiated microstructure, two proton pre-irradiation schedules were employed: Schedule 1 (isothermal irradiation at 350 °C to 5 dpa) to simulate high-temperature PWR conditions, and Schedule 2 (two-step process: irradiation to 2.5 dpa at -10 °C followed by 2.5 dpa at 350 °C) to simulate lower temperature PWR and Boiling Water Reactor (BWR) conditions. Long-term autoclave corrosion testing over 360 days at 320 °C revealed no significant difference between unirradiated samples and those pre-irradiated according to either schedule, with all samples exhibiting sub-cubic kinetics within the pre-transition regime. Irradiated samples underwent Simultaneous Irradiation Corrosion (SIC) tests, corroding in 320 °C water while being irradiated with protons. Corrosion was found to accelerate in all SIC-tested samples relative to autoclave conditions, with the greatest increase observed in non-pre-irradiated samples. Pre-irradiation with either schedule resulted in a slower corrosion rate compared to non-pre-irradiated regions under SIC conditions. The degree of radiolysis observed in the SIC tests surpassed typical PWR conditions, approaching levels found in BWRs. Radiolysis products were identified as the primary contributors to accelerated corrosion, corroborated by radiolysis bar tests. Furthermore, these findings underscore the intricate interactions between irradiation, corrosion, and water chemistry in determining Zircaloy-4 corrosion kinetics within nuclear reactor environments.

Pressurized Water Reactor↗

Nuclear waste attributes of near-term deployable small modular reactors

The nuclear waste attributes of near-term deployable SMRs were assessed using established nuclear waste metrics, which are the DU mass, SNF mass, volume, activity, decay heat, radiotoxicity, and decommissioning LLW volumes. Metrics normalized per unit electricity generation were compared to a reference large PWR. Three SMRs, VOYGR, Natrium, and Xe-100, were selected because they represent a range of reactor and fuel technologies and are active designs deployable by the decade’s end. The SMR nuclear waste attributes show both some similarities to the PWR and some significant differences caused by reactor-specific design features. The DU mass is equivalent to or slightly higher than the PWR. Back-end waste attributes for SNF disposition vary, but the differences have a limited impact on long-term repository isolation. SMR designs can vary significantly in SNF volume (and thus heat generation density). However, these differences are amenable to design optimization for handling, storage, transportation, and disposal technologies. Nuclear waste attributes from decommissioning vary depending on design and decommissioning technology choices. Given the analysis results in this study and assuming appropriate waste management system and operational optimization, there appear to be no major challenges to managing SMR nuclear wastes compared to the reference PWR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fourier Transform-Plasmon Waveguide Spectroscopy: A Nondestructive Multifrequency Method for Simultaneously Determining Polymer Thickness and Apparent Index of Refraction

Fourier transform (FT)-plasmon waveguide resonance (PWR) spectroscopy measures light reflectivity at a waveguide interface as the incident frequency and angle are scanned. Under conditions of total internal reflection, the reflected light intensity is attenuated when the incident frequency and angle satisfy conditions for exciting surface plasmon modes in the metal as well as guided modes within the waveguide. Expanding upon the concept of two-frequency surface plasmon resonance developed by Peterlinz and Georgiadis [ Opt. Commun. 1996, 130, 260], the apparent index of refraction and the thickness of a waveguide can be measured precisely and simultaneously by FT-PWR with an average percent relative error of 0.4%. Measuring reflectivity for a range of frequencies extends the analysis to a wide variety of sample compositions and thicknesses since frequencies with the maximum attenuation can be selected to optimize the analysis. Additionally, the ability to measure reflectivity curves with both p- and s-polarized light provides anisotropic indices of refraction. FT-PWR is demonstrated using polystyrene waveguides of varying thickness, and the validity of FT-PWR measurements are verified by comparing the results to data from profilometry and atomic force microscopy (AFM).

36 MATERIALS SCIENCE↗

Analysis of Differential Die Away Instrument Simulated Performance Using Boiling Water Reactor Spent Fuel Assemblies

As part of evaluating the performance of various Non-Destructive Assay (NDA) instruments measuring the plutonium content and other information about spent nuclear fuel, the Next Generation of Safeguards Initiative (NGSI) Spent Fuel (SF) Project generated spent fuel libraries containing the composition of spent fuel assemblies originating from various reactors, initial enrichments (IE), burnups (BU), and cooling times (CT). Spent Fuel Library (SFL) number 5 (SFL5), representing Boiling Water Reactor (BWR) assemblies, was created as part of a “Gentleman’s Agreement” with Sweden to examine if the Differential Die Away (DDA) instrument performs similarly for BWR assemblies as for the Pressurized Water Reactor (PWR) ones. The difference between PWRs and BWRs is that BWRs have a large axial variation in moderator density because it is in the form of water at the bottom of the reactor but turns into steam as it gets warmer at the top of the reactor; thus, more plutonium builds up at the bottom of each assembly than at the top. In a PWR, the moderator density varies slightly from the bottom to the top, but since it is pressurized, the changes are not as significant with respect to the burnup and plutonium distributions. BWR assemblies are also typically smaller than PWR ones, which could affect detector performance. Since Sweden has both PWR and BWR assemblies, it is anticipated that we will be deploying the DDA instrument to measure both spent fuel assembly (SFA) types.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Irradiation Programs and Test Plans to Assess High-Fluence Irradiation Assisted Stress Corrosion Cracking Susceptibility.

. Irradiation assisted stress corrosion cracking (IASCC) is a known issue in current reactors. In a 60 year lifetime, reactor core internals may experience fluence levels up to 15 dpa for boiling water reactors (BWR) and 100+ dpa for pressurized water reactors (PWR). To support a safe operation of our fleet of reactors and maintain their economic viability it is important to be able to predict any evolution of material behaviors as reactors age and therefore fluence accumulated by reactor core component increases. For PWR reactors, the difficulty to predict high fluence behavior comes from the fact that there is not a consensus of the mechanism of IASCC and that little data is available. It is however possible to use the current state of knowledge on the evolution of irradiated microstructure and on the processes that influences IASCC to emit hypotheses. This report identifies several potential changes in microstructure and proposes to identify their potential impact of IASCC. The susceptibility of a component to high fluence IASCC is considered to not only depends on the intrinsic IASCC susceptibility of the component due to radiation effects on the material but to also be related to the evolution of the loading history of the material and interaction with the environment as total fluence increases. Single variation type experiments are proposed to be performed with materials that are representative of PWR condition and with materials irradiated in other conditions. To address the lack of IASCC propagation and initiation data generated with material irradiated in PWR condition, it is proposed to investigate the effect of spectrum and flux rate on the evolution of microstructure. A long term irradiation, aimed to generate a well-controlled irradiation history on a set on selected materials is also proposed for consideration. For BWR, the study of available data permitted to identify an area of concern for long term performance of component. The efficiency of hydrogen water chemistry mitigation technology may decrease as fluence increases for high-stress intensity factors. This report describes a program plan to determine the efficiency of hydrogen water chemistry as a function of the stress intensity factor applied and fluence. The use of existing, available, materials and the generation of additional materials via irradiation in a research reactor are considered.

36 MATERIALS SCIENCE↗

VERA-CS Verification & Validation Plan

This report summarizes the current status of VERA-CS Verification and Validation for PWR Core Follow operation and proposes a multi-phase plan for continuing VERA-CS V&V in FY17 and FY18. The proposed plan recognizes the hierarchical nature of a multi-physics code system such as VERA-CS and the importance of first achieving an acceptable level of V&V on each of the single physics codes before focusing on the V&V of the coupled physics solution. The report summarizes the V&V of each of the single physics codes systems currently used for core follow analysis (ie MPACT, CTF, Multigroup Cross Section Generation, and BISON / Fuel Temperature Tables) and proposes specific actions to achieve a uniformly acceptable level of V&V in FY17. The report also recognizes the ongoing development of other codes important for PWR Core Follow (e.g. TIAMAT, MAMBA3D) and proposes Phase II (FY18) VERA-CS V&V activities in which those codes will also reach an acceptable level of V&V. The report then summarizes the current status of VERA-CS multi-physics V&V for PWR Core Follow and the ongoing PWR Core Follow V&V activities for FY17. An automated procedure and output data format is proposed for standardizing the output for core follow calculations and automatically generating tables and figures for the VERA-CS Latex file. A set of acceptance metrics is also proposed for the evaluation and assessment of core follow results that would be used within the script to automatically flag any results which require further analysis or more detailed explanation prior to being added to the VERA-CS validation base. After the Automation Scripts have been completed and tested using BEAVRS, the VERA-CS plan proposes the Watts Bar cycle depletion cases should be performed with the new cross section library and be included in the first draft of the new VERA-CS manual for release at the end of PoR15. Also, within the constraints imposed by the proprietary nature of plant data, as many as possible of the FY17 AMA Plant Core Follow cases should also be included in the VERA-CS manual at the end of PoR15. After completion of the ongoing development of TIAMAT for fully coupled, full core calculations with VERA-CS / BISON 1.5D, and after the completion of the refactoring of MAMBA3D for CIPS analysis in FY17, selected cases from the VERA-CS validation based should be performed, beginning with the legacy cases of Watts Bar and BEAVRS in PoR16. Finally, as potential Phase III future work some additional considerations are identified for extending the VERA-CS V&V to other reactor types such as the BWR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Overview of the State-of-the-Art Reactor Consequence Uncertainty Assessment Accident Progression Insights

The U.S. Nuclear Regulatory Commission (NRC) with Sandia National Laboratories (Sandia) have completed three uncertainty analyses (UAs) as part of the State-of-the-Art Reactor Consequence Analyses (SOARCA) program. The SOARCA UAs included an integrated evaluation of uncertainty in accident progression, radiological release, and offsite health consequence projections. The UA for Peach Bottom, a boiling-water reactor (BWR) with a Mark I containment located in the State of Pennsylvania, analyzed the unmitigated long-term station blackout SOARCA scenario. The UA for Sequoyah, a 4-loop Westinghouse pressurized-water reactor (PWR) located in the State of Tennessee, analyzed the unmitigated short-term station blackout SOARCA scenario, with a focus on issues unique to the ice condenser containment and the potential for early containment failure due to hydrogen deflagration. The UA for Surry, a 3-loop Westinghouse PWR with a sub-atmospheric large dry containment located in the State of Virginia, analyzed the unmitigated short-term station blackout SOARCA scenario including the potential for thermally-induced steam-generator tube rupture. These three UAs are currently documented in three NUREG/CR reports. This report provides input to planned NRC documentation on the insights and findings from the SOARCA UA program. The purpose of the summary report is to provide a useful reference for regulatory applications that require the evaluation of offsite consequence risk from beyond design basis event severe accidents. This report focuses on the accident progression and source term insights developed from the MELCOR analyses. MELCOR is the NRC's best-estimate, severe accident computer code used in the SOARCA UAs. In anticipation of the SOARCA UA insights work, NRC and Sandia benchmarked the response of the Peach Bottom model to selected reference calculations from the Peach Bottom SOARCA UA. Peach Bottom was the first SOARCA UA performed and was completed in 2015 using the MELCOR 1.8.6 code. The PWR SOARCA UAs evolved the original methodology and utilized the updated MELCOR 2.2 computer code. The Peach Bottom model has been systematically updated for other NRC research efforts and has been updated to MELCOR 2.2. computer code. The findings from the new reference calculations using the updated model with the MELCOR 2.2 code are also integrated into the report. A second objective is an assessment of the applicability of the results to the other nuclear reactors in the U.S. As the key findings are reviewed, judgments are presented on the applicability of the results to other U.S. nuclear power plants. An important objective of the SOARCA program relied on high- fidelity plant-specific modeling. However, the nature of the insights and conclusions allowed judgements to be made on the applicability of the various insights to the same general classification of plant (i.e., BWR or PWR) or the entire fleet of plants. Finally, the results from the SOARCA UA accident progression calculations contain a wealth of information not previously documented in the NUREG/CRs. This report includes new but related information that can be used to benchmark past or support future regulatory decisions related to severe accidents. The new work includes a benchmark of the NUREG-1465 licensing source term definitions, the variability of key accident progression events and timing to radionuclide release, and an improved understanding of the timing and source terms from consequential steam generator tube ruptures. iii ACKNOWLEDGEMENTS The Sandia authors gratefully acknowledge the significant technical and programmatic contributions from the NRC SOARCA team which are reflected throughout the report. Dr. Tina Ghosh has been involved throughout the SOARCA UAs, providing the primary managerial and technical oversight. The long lists of NRC and Sandia contributors from the SOARCA UAs are cited in the three NUREG/CRs and are also gratefully acknowledged by the small team of authors compiling the results of their efforts. Significant technical contributions, advice, and reviews were provided by Dr. Hossein Esmaili, Dr. Alfred Hathaway, and Dr. Edward Fuller (retired) of the NRC. Dr. Randal Gauntt (retired), Mr. Patrick Mattie, Mr. Joseph Jones (retired), and Dr. Doug Osborn from Sandia are recognized as the SOARCA UA managers guiding the past efforts. There is a comparable list of project managers at the NRC including Ms. Patricia Santiago, Dr. Salman Haq, and Mr. Jon Barr. Sadly, we have lost Mr. Charlie Tinkler and Mr. Robert Prato, who were important contributors to the original SOARCA project. Finally, Mr. Kyle Ross and Mr. Mark Leonard have also retired but were significant technical contributors. Mr. Kyle Ross was the technical lead on all three SOARCA UAs and the original pressurized water reactor SOARCA study. Mr. Leonard was the technical lead on the original boiling water reactor SOARCA study and a key contributor to the first Peach Bottom SOARCA UA. iv

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Disposal Concepts for a High-Temperature Repository in Shale.

Disposal of large, heat-generating waste packages containing the equivalent of 21 pressurized water reactor (PWR) assemblies or more is among the disposal concepts under investigation for a future repository for spent nuclear fuel (SNF) in the United States. Without a long (>200 years) surface storage period, disposal of 21-PWR or larger waste packages (especially if they contain high-burnup fuel) would result in in-drift and near-field temperatures considerably higher than considered in previous generic reference cases that assume either 4-PWR or 12-PWR waste packages (Jové Colón et al. 2014; Mariner et al. 2015; 2017). Sevougian et al. (2019c) identified high-temperature process understanding as a key research and development (R&D) area for the Spent Fuel and Waste Science and Technology (SFWST) Campaign. A two-day workshop in February 2020 brought together campaign scientists with expertise in geology, geochemistry, geomechanics, engineered barriers, waste forms, and corrosion processes to begin integrated development of a high-temperature reference case for disposal of SNF in a mined repository in a shale host rock. Building on the progress made in the workshop, the study team further explored the concepts and processes needed to form the basis for a high-temperature shale repository reference case. The results are described in this report and summarized..

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

A Reduced-Order Model of a Nuclear Power Plant with Thermal Power Dispatch

This paper presents reduced-order modeling of thermal power dispatch (TPD) from a pressurized water reactor (PWR) for providing heat to nearby heat consuming industrial processes that seek to take advantage of nuclear heat to reduce carbon emissions. The reactor model includes the neutronics of the reactor core, thermal–hydraulics of the primary coolant cycle, and a three-lump model of the steam generator (SG). The secondary coolant cycle is represented with quasi-steady state mass and energy balance equations. The secondary cycle consists of a steam extraction system, high-pressure and low-pressure turbines, moisture separator and reheater, high-pressure and low-pressure feedwater heaters, deaerator, feedwater and condensate pumps, and a condenser. The steam produced by the SG is distributed between the turbines and the extraction steam line (XSL) that delivers steam to nearby industrial processes, such as production of clean hydrogen. The reduced-order simulator is verified by comparing predictions with results from separate validated steady-state and transient full-scope PWR simulators for TPD levels between 0% and 70% of the rated reactor power. All simulators indicate that the flow rate of steam in the main steam line and turbine systems decrease with increasing TPD, which causes a reduction in PWR electric power generation. The results are analyzed to assess the impact of TPD on system efficiency and feedwater flow control. Due to the simplicity of the proposed reduced-order model, it can be scaled to represent a PWR of any size with a few parametric changes. In the future, the proposed reduced-order model will be integrated into a power system model in a digital real-time simulator (DRTS) and physical hardware-in-the-loop simulations.

08 HYDROGEN↗