Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “November 2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Repatriated Desert Bighorn Sheep Population on the Nevada National Security Site

Ecological studies have been conducted on the Nevada National Security Site (NNSS) since the 1960s. Desert bighorn sheep (Ovis canadensis nelsoni) were considered rare visitors on the NNSS, with only 9 recorded observations between 1963 and 2009, all of which were males. Females and young were not documented definitively until winter 2011, when several were killed by a radio-collared female mountain lion (Puma concolor). Following these observations, we initiated a study of desert bighorn sheep on the NNSS to better understand their movements/interactions with other populations, prevalence of disease, population size, origin, radionuclide burdens and potential radiological dose to humans that may consume harvested animals away from the NNSS. We captured and radio-collared 6 sheep (2 females, 4 males) in November 2015, and 15 (7 females, 8 males) in November 2016. We sampled blood for genetic and disease testing and collected nasal swabs for respiratory disease testing. Sheep from the NNSS spent most of their time around Shoshone Mountain, Fortymile Canyon, and Yucca Mountain but also moved to Bare Mountain, Thirsty Canyon, and Black Mountain. Females greatly expanded their core and overall home ranges during spring, whereas males expanded their home ranges during summer. Of 18 sheep sampled for disease, 12 showed an immune response to Mycoplasma ovipneumoniae, and 5 had the bacteria present. Genetic testing revealed that the ancestry of NNSS sheep is from the Bare Mountain (1991-1995, within 24 km of our study area), Specter Range (1990-1995, within 32 km of our study area), and Stonewall Mountain (1975-1983, within 72 km of our study area) reintroduced populations. Radionuclide burden in NNSS sheep was minimal with no significant difference from sheep captured on the Nevada Test and Training Range and northern Nevada. One marked adult male was legally harvested off the NNSS north of Bare Mountain. Finally, this recently colonized reproducing population of sheep on the NNSS warrants further monitoring, protection, and inclusion in resource management plans.

60 APPLIED LIFE SCIENCES↗

The AP1000{sup R} China projects move forward to construction completion and equipment installation

The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CHESS upgrade with compact undulator magnets: Operating experience and first results

In November 2014 two in-air 1.5 m CHESS Compact Undulator (CCU) magnets built by KYMA S.R.l. were installed in Cornell Electron Storage Ring (CESR) in canted arrangement and after few days of commissioning their regular operation started. CCU magnets are compact, lightweight and cost efficient devices. They have very stable magnetic field integrals independent of deflection parameter value. This feature greatly simplifies the storage ring operation. The CCU concept was developed at Cornell in 2011 and the first 1 m in-vacuum CCU magnet was beam-tested in 2012. The article presents CCU concept and some details of the design. It describes also the layout of CCUs installation in CESR, their performance and characteristics. The current status of operation and future plans are discussed as well. Presently, at CHESS two CCU magnets provide radiation for 5 out of 11 experimental stations.

43 PARTICLE ACCELERATORS↗

The Narrow Cold-Frontal Rainband of 22/23 November 2013

The recent paper in Weather by Young (2014) provided a detailed analysis of an intensive cold front as it passed over the UK on 2223 November 2013. This was an extremely good example of linear convection, as it is described in the paper, or a narrow cold-frontal rainband (NCFR; Hobbs and Biswas, 1979). These features are associated with a low-level jet that lies ahead and parallel to the surface cold front, generating a band of intense but relatively shallow convection (see Koch and Kocin, 1991). Although the structure associated with these systems is not uncommon (e.g. Gatzen, 2011), this case was notable for the (linear) length and the longevity of the feature. Critically, fine-scale radar observations using the 1km, 5min UK composite radar product, produced by the UK Met Office and supplied by the British Atmospheric Data Centre, enabled the timing and progression of the most intense band of this feature tobe examined (see Figure 1).

narrow↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2015

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year (WY) 2015. It is the seventh report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released June 2012 examined WY 2011 (Poch et al. 2012); a report released April 2013 examined WY 2012 (Poch et al. 2013); a report released June 2014 examined WY 2013 (Graziano et al. 2014); and a report released September 2015 examined WY 2014 (Graziano et al. 2015). An experimental release may have either a positive or negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2015; specifically, a high flow experimental (HFE) release conducted in November 2014. For this experimental release, financial costs of approximately $2.1 million were incurred because the HFE required sustained water releases that exceeded the powerplant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production to either follow firm power customer loads or to respond to market prices. This study identifies the main factors that contribute to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating the GCD operations under two scenarios: (1) a baseline scenario that mimics both HFE operations during the experiment and during the rest of the year when it complies with the 1996 ROD operating criteria, and (2) a “without experiments” scenario that is identical to the baseline except it assumes that the HFE did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to simulate the dispatch of hydropower plants at GCD and other plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase prices in the modeling process. In addition to estimating the financial impact of the HFE, the team used the GTMax model to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and WAPA operating practices.

54 ENVIRONMENTAL SCIENCES↗

Successful Space Flight of High-Speed InGaAs Photodiode Onboard the International Space Station

Photonic systems are required for several space applications, including satellite communication links and lidar sensors. Although such systems are ubiquitous in terrestrial applications, deployment in space requires the constituent components to withstand extreme environmental conditions, including wide operating temperature range, mechanical shock and vibration, and radiation. These conditions are significantly more stringent than alternative standards, namely Bellcore GR-468 and MIL-STD 883, which may be satisfied by typical, commercially available, photonic components. Furthermore, it is very difficult to simultaneously reproduce several aspects of space environment, including exposure to galactic cosmic rays (GCR), in a laboratory. Therefore, it is necessary to operate key photonic components in space to achieve a technology readiness level of 7 and beyond. Accordingly, the International Space Station (ISS) provides an invaluable test bed for qualifying such components for space missions. We present a fiber-pigtailed photodiode module, having a -3 dB bandwidth of 16.8 GHz, that survived 18 months on the ISS as part of the Materials International Space Station Experiment (MISSE) 7 mission. This module was launched by NASA Langley Research Center on November 16, 2009 on the Space Shuttle Atlantis (STS-129), as part of their lidar transceiver components. While orbiting on the ISS in a passive experiment container, the photodiode module was exposed to extreme temperature cycling from -157 degrees Celsius to +121 degrees Celsius 16 times a day, proton radiation from the inner Van Allen belt at the South Atlantic Anomaly, and galactic cosmic rays. The module returned to Earth on the Space Shuttle Endeavor (STS-134) on June 1, 2011 for further characterization. The post flight test of the photodiode module, shown in Fig. 1a, demonstrates no change in the module's performance, thus proving its survivability during launch and in space environment.

Joshi, Abhay↗

Long-term patterns of cave-exiting activity of hibernating bats in western North America

Understanding frequency and variation of cave-exiting activity after arousal from torpor of hibernating bats is important for bat ecology and conservation, especially considering white-nose syndrome. In winter from 2011 to 2018, we acoustically monitored, and counted in hibernacula, two species of conservation concern—western small-footed myotis ( Myotis ciliolabrum ) and Townsend’s big-eared bats ( Corynorhinus townsendii )—in 9 caves located in important habitat for these species in western North America. We investigated if cave-exiting activity differed by species, cave, number of hibernating bats, moon phase, and weather variables. Both species exited hibernacula during all winter months, but most activity occurred in March followed by November. Although we counted almost 15 times more Townsend’s big-eared bats during hibernacula surveys, we documented western small-footed myotis exiting caves 3 times more than Townsend’s big-eared bats. Cave-exiting activity increased with increasing number of hibernating bats, but more so for western small-footed myotis. Both species of bats were active during warm weather and low wind speeds. Western small-footed myotis were more active during colder temperatures, higher wind speeds, and greater change in barometric pressure than Townsend’s big-eared bats. Our results provide a long-term dataset of cave-exiting activity after arousal from torpor during hibernation for these species before the arrival of white-nose syndrome.

54 ENVIRONMENTAL SCIENCES↗

National Fuel Cell Electric Vehicle Learning Demonstration (Final Report)

This report discusses key analysis results based on data from early 2005 through September 2011 from the U.S. Department of Energy's (DOE's) Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project, also referred to as the National Fuel Cell Electric Vehicle (FCEV) Learning Demonstration. This report serves as one of many mechanisms to help transfer knowledge and lessonslearned within various parts of DOE's Fuel Cell Technologies Program, as well as externally to other stakeholders. It is the fifth and final such report in a series, with previous reports being published in July 2007, November 2007, April 2008, and September 2010.

08 HYDROGEN↗

NASA and ESA Partnership on the Multi-Purpose Crew Vehicle Service Module

(1) ESA decided in its Council Meeting in March 2011 to partially offset the European ISS obligations after 2015 with different means than ATVs; (2) The envisioned approach is based on a barter element(s) that would generate cost avoidance on the NASA side; (3) NASA and ESA considered a number of Barter options, NASA concluded that the provision by ESA of the Service Module for the NASA Multi-Purpose Crew Vehicle (MPCV) was the barter with the most interest;. (4) A joint ESA - NASA working group was established in May 2011 to assess the feasibility of Europe developing this Module based on ATV heritage; (5)The working group was supported by European and US industry namely Astrium, TAS-I and Lockheed-Martin; and (6) The project is currently in phase B1 with the objective to prepare a technical and programmatic proposal for an ESA MPCV-SM development. This proposal will be one element of the package that ESA plans submit to go forward for approval by European Ministers in November 2012.

Schubert, Kathleen E.↗

Winter hardiness of Miscanthus (II): Genetic mapping for overwintering ability and adaptation traits in three interconnected Miscanthus populations

Abstract Miscanthus × giganteus (M×g) is the primary species of Miscanthus for bioenergy feedstock production. The current leading biomass cultivar, M×g ‘1993‐1780’, is insufficiently adapted in temperate regions with cold winters such as USDA hardiness zone 5 (average annual minimum temperature of −28.9 to −23.3°C) or lower. Three interconnected Miscanthus F 1 populations that shared a common parent were planted in a replicated field trial at Urbana, IL (hardiness zone 5b; average annual minimum temperature of −26.1 to −23.3°C) in spring 2011. The winter of 2013–2014 was especially cold in Urbana, with a minimum soil temperature at 10 cm of −6.2°C and a minimum air temperature of −25.3°C, giving us an opportunity to evaluate hardiness on established year‐3 plants. The parent in common to all three populations, M. sinensis ssp. condensatus ‘Cosmopolitan’, is native to maritime southern Japan, and in Urbana, it is winter‐damaged most years. In contrast, the three other parents, M. sacchariflorus ‘Robustus’ (MapA), M. sinensis ‘Silberturm’ (MapB), and M. sinensis ‘November Sunset’ (MapC), are typically winter hardy in Urbana. Nearly all MapA progeny plants survived and grew vigorously in spring 2014, whereas in MapB and MapC, many progeny plants did not survive the winter, and most of the survivors were severely damaged, with poor vigor. Negative correlations between overwintering ability and spring regrowth date and autumn dormancy date suggested that the genotypes most likely to survive winters were those that emerged early in spring and/or went dormant early in autumn. Using joint‐population analysis, we identified 53 quantitative trait loci (QTLs) for nine adaptation traits, including nine QTLs for overwintering ability and 11 for spring hardiness scores. Many biologically intuitive candidate genes were observed within or near the QTLs detected in this study, suggesting their validity and potential for further study.

Dong, Hongxu↗

Material around the Centaur (2060) Chiron from the 2018 November 28 UT Stellar Occultation

A stellar occultation of Gaia DR3 2646598228351156352 by the Centaur (2060) Chiron was observed from the South African Astronomical Observatory on 2018 November 28 UT. Here we present a positive detection of material surrounding Chiron from the 74-inch telescope for this event. Additionally, a global atmosphere is ruled out at the tens of microbars level for several possible atmospheric compositions. There are multiple 3σ drops in the 74-inch light curve: three during immersion and two during emersion. Occulting material is located between 242 and 270 km from the center of the nucleus in the sky plane. Assuming the ring-plane orientation proposed for Chiron from the 2011 occultation, the flux drops are located at 352, 344, and 316 km (immersion) and 357 and 364 km (emersion) from the center, with normal optical depths of 0.26, 0.36, and 0.22 (immersion) and 0.26 and 0.18 (emersion) and equivalent widths between 0.7 and 1.3 km. This detection is similar to the previously proposed two-ring system and is located within the error bars of that ring-pole plane; however, the normal optical depths are less than half of the previous values, and three features are detected on immersion. These results suggest that the properties of the surrounding material have evolved between the 2011, 2018, and 2022 observations.

Amanda A. Sickafoose↗

Compact Resolved Ejecta in the Nearest Tidal Disruption Event

Tidal disruption events (TDEs) occur when a star or substellar object passes close enough to a galaxy’s supermassive black hole to be disrupted by tidal forces. NGC 4845 (d = 17 Mpc) was host to a TDE, IGR J12580+0134, detected in 2010 November. Its proximity offers us a unique close-up of the TDE and its aftermath. We discuss new Very Long Baseline Array (VLBA) and Karl G. Jansky Very Large Array observations, which show that the radio flux from the active nucleus created by the TDE has decayed in a manner consistent with predictions from a jet-circumnuclear medium interaction model. This model explains the source’s broadband spectral evolution, which shows a spectral peak that has moved from the submillimeter (at the end of 2010) to GHz radio frequencies (in 2011–2013) to <1 GHz in 2015. The milliarcsecond-scale core is circularly polarized at 1.5 GHz but not at 5 GHz, consistent with the model. The VLBA images show a complex structure at 1.5 GHz that includes an east–west extension that is ∼40 mas (3 pc) long, as well as a resolved component that is 52 mas (4.1 pc) northwest of the flat-spectrum core, which is all that can be seen at 5 GHz. If ejected in 2010, the northwest component must have had v=0.96c over five years. However, this is unlikely, as our model suggests strong deceleration to speeds <0.5c within months and a much smaller, sub-parsec size. In this interpretation, the northwest component could have either a non-nuclear origin or be from an earlier event.

79 ASTRONOMY AND ASTROPHYSICS↗

Clean and Secure Energy from Domestic Oil Shale and Oil Sands Resources

This report summarizes the significant findings from the Clean and Secure Energy from Domestic Oil Shale and Oil Sands Resources program sponsored by the Department of Energy through the National Energy Technology Laboratory. There were four principle areas of research; Environmental, legal, and policy issues related to development of oil shale and oil sands resources; Economic and environmental assessment of domestic unconventional fuels industry; Basin-scale assessment of conventional and unconventional fuel development impacts; and Liquid fuel production by in situ thermal processing of oil shale Multiple research projects were conducted in each area and the results have been communicated via sponsored conferences, conference presentations, invited talks, interviews with the media, numerous topical reports, journal publications, and a book that summarizes much of the oil shale research relating to Utah’s Uinta Basin. In addition, a repository of materials related to oil shale and oil sands has been created within the University of Utah’s Institutional Repository, including the materials generated during this research program. Below is a listing of all topical and progress reports generated by this project and submitted to the Office of Science and Technical Information (OSTI). A listing of all peer-reviewed publications generated as a result of this project is included at the end of this report; Geomechanical and Fluid Transport Properties 1 (December, 2015); Validation Results for Core-Scale Oil Shale Pyrolysis (February, 2015); and Rates and Mechanisms of Oil Shale Pyrolysis: A Chemical Structure Approach (November, 2014); Policy Issues Associated With Using Simulation to Assess Environmental Impacts (November, 2014); Policy Analysis of the Canadian Oil Sands Experience (September, 2013); V-UQ of Generation 1 Simulator with AMSO Experimental Data (August, 2013); Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges (March, 2012); Conjunctive Surface and Groundwater Management in Utah: Implications for Oil Shale and Oil Sands Development (May, 2012); Development of CFD-Based Simulation Tools for In Situ Thermal Processing of Oil Shale/Sands (February, 2012); Core-Based Integrated Sedimentologic, Stratigraphic, and Geochemical Analysis of the Oil Shale Bearing Green River Formation, Uinta Basin, Utah (April, 2011); Atomistic Modeling of Oil Shale Kerogens and Asphaltenes Along with their Interactions with the Inorganic Mineral Matrix (April, 2011); Pore Scale Analysis of Oil Shale/Sands Pyrolysis (March, 2011); Land and Resource Management Issues Relevant to Deploying In-Situ Thermal Technologies (January, 2011); Policy Analysis of Produced Water Issues Associated with In-Situ Thermal Technologies (January, 2011); and Policy Analysis of Water Availability and Use Issues for Domestic Oil Shale and Oil Sands Development (March, 2010)

04 OIL SHALES AND TAR SANDS↗

Extremely Severe Space Weather and Geomagnetically Induced Currents in Regions with Locally Heterogeneous Ground Resistivity

Large geomagnetically induced currents (GICs) triggered by extreme space weather events are now regarded as one of the serious natural threats to the modern electrified society. The risk is described in detail in High-Impact, Low-Frequency Event Risk, A Jointly-Commissioned Summary Report of the North American Electric Reliability Corporation and the US Department of Energy's November 2009 Workshop, June 2010. For example, the March 13-14,1989 storm caused a large-scale blackout affecting about 6 million people in Quebec, Canada, and resulting in substantial economic losses in Canada and the USA (Bolduc 2002). Therefore, European and North American nations have invested in GIC research such as the Solar Shield project in the USA (Pulkkinen et al. 2009, 2015a). In 2015, the Japanese government (Ministry of Economy, Trade and Industry, METI) acknowledged the importance of GIC research in Japan. After reviewing the serious damages caused by the 2011 Tohoku-Oki earthquake, METI recognized the potential risk to the electric power grid posed by extreme space weather. During extreme events, GICs can be concerning even in mid- and low-latitude countries and have become a global issue.

Fujita, Shigeru↗

Introduction on Recently Revised Regulatory Framework Related to Decommissioning of Nuclear Facilities in Korea - 16488

There are 24 units of nuclear power reactors in operation and 4 units of nuclear power reactors under construction in Korea as of November 2015. However, there is no permanently shutdown nuclear power reactor and decommissioned or under decommissioning nuclear power reactor. There are only 2 research reactors being decommissioned since 1997. It is realized that improvement of the regulatory framework for decommissioning of nuclear facilities has been emphasized constantly from the point of view of IAEA's safety standards. IAEA published the safety requirement on decommissioning of facilities on July 2014; its title is the Safe Decommissioning of Facilities, General Safety Requirement Part 6. According to follow up action on the result of IAEA's Integrated Regulatory Review Service (IRRS) mission to Korea in 2011, regulatory framework for decommissioning of nuclear facilities in Korea was revised through comparing to IAEA safety standards. It was identified that items should be revised to improve the regulatory framework for decommissioning. Those are as follows: absence of legal definition of decommissioning, incomplete procedure for safety regulation after permanent shutdown, un-detailed acceptance criteria for decommissioning plan, incomplete requirements for early preparing and periodic update of decommissioning plan, un-detailed requirements on standard format and contents for decommissioning plan, and incomplete radiological criteria on site and building reuse after completion of decommissioning. Nuclear Safety Act related to decommissioning of nuclear facilities was revised and promulgated on 21 July 2015. As the lower statute of Nuclear Safety Act, Enforcement Decree of the Nuclear Safety Act and Enforcement Regulation of the Nuclear Safety Act were also revised and promulgated on 21 July 2015. In this paper, related to decommissioning of nuclear facilities such as nuclear power reactor, research or training reactor, and nuclear fuel cycle facility, it was introduced the main changes of the amended and promulgated Nuclear Safety Act on July 2015. It was also mentioned about the current issue in accordance with its implementation. Main contents of revised Nuclear Safety Act are that decommissioning plan should be submitted for nuclear installations to be constructed and operated, and this plan should be updated periodically. In addition, 3 years of grace period was set to submit preliminary decommissioning plan for the facility which has already been approved prior to July 2018. Preliminary decommissioning plan should be updated every 10 years, and regulatory body should review this document. According to the revised Nuclear Safety Act, in the case of a nuclear power reactor after the approval of the change on operating license for permanent shutdown, should submit final decommissioning plan within 5 years, and be approved by the regulatory body. On July 2015, Kori Unit 1 was determined not to apply its 2nd continued operation, and will expire in 2017. Kori Unit 1 will be the first case for the submission of final decommissioning plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolving the NASA Near Earth Network for the Next Generation of Human Space Flight

The purpose of this paper is to present the planned development and evolution of the NASA Near Earth Network (NEN) launch communications services in support of the next generation of human space flight programs. Following the final space shuttle mission in 2011, the two NEN launch communications stations were decommissioned. Today, NASA is developing the next generation of human space flight systems focused on exploration missions beyond low-earth orbit, and supporting the emerging market for commercial crew and cargo human space flight services. The NEN is leading a major initiative to develop a modern high data rate launch communications ground architecture with support from the Kennedy Space Center Ground Systems Development and Operations Program and in partnership with the U.S. Air Force (USAF) Eastern Range. This initiative, the NEN Launch Communications Stations (LCS) development project, successfully completed its System Requirements Review in November 2013. This paper provides an overview of the LCS project and a summary of its progress. The LCS ground architecture, concept of operations, and driving requirements to support the new heavy-lift Space Launch System and Orion Multi-Purpose Crew Vehicle for Exploration Mission-1 are presented. Finally, potential future extensions to the ground architecture beyond EM-1 are discussed.

Launch Communications↗

Information Products & Communication Materials for SSEB, SGA, SLC and Partners [Slides]

Contents include the following: 1) Southeastern Regional Carbon Sequestration Partnership (SECARB)–Southern States Energy Board's 48th Annual Meeting, August 8, 2008; 2) Southern States Energy Board Carbon Management Program SSEB Associate Members Meeting, August 21, 2009; 3) Carbon Capture and Sequestration (CCS) Demonstration Project, August 21, 2009; 4) Clean Energy in the Southern Region, August 27, 2010; 5) Carbon Management–Southern Leadership of a Regional Partnership, October 17, 2011; 6) Southeastern Regional Carbon Sequestration Partnership "Knowledge Sharing", August 10, 2012; 7) Southeastern Regional Carbon Sequestration Partnership; 8) Site Visit by Southern Legislative Group, July 30, 2013; 9) SECARB Awards Anthropogenic Test, March 4, 2014; 10) Southern Company/MHI Ltd. 500 TPD CCS Demonstration; 11) SECARB Anthropogenic Test Project Assessment, March 4-5, 2014; 12) Advanced Monitoring Technologies SECARB Phase III CO 2 Storage Citronell, Alabama, March 4, 2014; 13) Geomechanics at Cranfield, March 5, 2014; 14) Gulf Coast Carbon Center Near-Surface Update, March 4-5, 2014; 15) Monitoring Design Best Practices, March 5, 2014; 16) Special Projects–Carbon Management Program, 2015; 17) Special Projects, November 2-3, 2016; 18) Carbon Management Program Carbon Capture & Storage Projects, September 24, 2017; 19) Remarks Before the 58th Annual Meeting of the Executive Committee, September 16, 2018; 20) Annual Business Session, September 24, 2019; and 21) Recent Activities & 2019-2020 Elections Insights, February 7, 2020.

01 COAL, LIGNITE, AND PEAT↗

Stringer Bending Test Helps Diagnose and Prevent Cracks in the Space Shuttle's External Tank

Space Shuttle Discovery's last mission, STS-133, was scheduled to launch on November 5, 2010. Just hours before liftoff, a hydrogen leak at an umbilical connection scrubbed the launch attempt. After the scrub, further inspection revealed a large crack in the foam insulation covering the External Tank, ET-137. Video replay of the launch attempt confirmed the crack first appeared as cryogenic propellants were being loaded into the ET. When the cracked foam was removed, technicians found the underlying stringer had two 9-inch-long cracks. Further inspection revealed a total of 5 of the 108 ET stringers had cracked. NASA and Lockheed Martin immediately launched an aggressive campaign to understand the cracks and repair the stringers in ET-137, targeting February 2011 as the new launch date for STS-133. Responsibilities for the various aspects of the investigation were widely distributed among NASA centers and organizations. This paper will focus on lab testing at Marshall Space Flight Center (MSFC) in Huntsville, Alabama that was intended to replicate the stringer failure and gauge the effect of proposed countermeasures.

Saxon, Joseph B.↗