Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Network Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

An Improved Transmission Switching Algorithm for Managing Post-(N-1) Contingencies in Electricity Networks

In this presentation, we detail the shortcomings of existing transmission switching (TS) methodologies for preventing post-contingency loss of load in wide area electric power networks. Following that, we present a bi-level algorithm as an improvement to the state of the art. We show proof-of-concept level results that indicate computational viability, fast solutions, and the ability to pick the same best candidate as non computationally viable methods. Further, our method also minimizes load shedding after the contingency, thus enhancing the reliability and security of electricity supply. We also include a futuristic scenario of increased renewables and decreased natural gas sourced generators to show promising results. We grant permission for our presentation to be recorded and uploaded by the conference organizers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quality of Service for Real-Time Applications Over Next Generation Data Networks

This project, which started on January 1, 2000, was funded by the NASA Glenn Research Center for duration of one year. The deliverables of the project included the following tasks: (1) Study of QoS mapping between the edge and core networks envisioned in the Next Generation networks will provide us with the QoS guarantees that can be obtained from next generation networks; (2) Buffer management techniques to provide strict guarantees to real-time end-to-end applications through preferential treatment to packets belonging to real-time applications. In particular, use of ECN to help reduce the loss on high bandwidth-delay product satellite networks needs to be studied; (3) Effect of Prioritized Packet Discard to increase goodput of the network and reduce the buffering requirements in the ATM switches; (4) Provision of new IP circuit emulation services over Satellite IP backbones using MPLS will be studied; and (5) Determine the architecture and requirements for internetworking ATN and the Next Generation Internet for real-time applications. The project has been completed on time. All the objectives and deliverables of the project have been completed. Research results obtained from this project have been published in a number of papers in journals, conferences, and technical reports, included in this document.

Atiquzzaman, Mohammed↗

Concepts and Tools for the Software Life Cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large softwaare base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software activity are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

Concepts and tools for the software life cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large software base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software actively are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

Wearable Technology

Wearable technology projects, to be useful, in the future, must be seamlessly integrated with the Flight Deck of the Future (F.F). The lab contains mockups of space vehicle cockpits, habitat living quarters, and workstations equipped with novel user interfaces. The Flight Deck of the Future is one element of the Integrated Power, Avionics, and Software (IPAS) facility, which, to a large extent, manages the F.F network and data systems. To date, integration with the Flight Deck of the Future has been limited by a lack of tools and understanding of the Flight Deck of the Future data handling systems. To remedy this problem it will be necessary to learn how data is managed in the Flight Deck of the Future and to develop tools or interfaces that enable easy integration of WEAR Lab and EV3 products into the Flight Deck of the Future mockups. This capability is critical to future prototype integration, evaluation, and demonstration. This will provide the ability for WEAR Lab products, EV3 human interface prototypes, and technologies from other JSC organizations to be evaluated and tested while in the Flight Deck of the Future. All WEAR Lab products must be integrated with the interface that will connect them to the Flight Deck of the Future. The WEAR Lab products will primarily be programmed in Arduino. Arduino will be used for the development of wearable controls and a tactile communication garment. Arduino will also be used in creating wearable methane detection and warning system.

Watson, Amanda↗

Integration of Utility Distributed Energy Resource Management System and Aggregators for Evolving Distribution System Operators

With the rapid integration of distributed energy resources (DERs), distribution utilities are faced with new and unprecedented issues. New challenges introduced by high penetration of DERs range from poor observability to overload and reverse power flow problems, under-over-voltages, maloperation of legacy protection systems, and requirements for new planning procedures. Distribution utility personnel are not adequately trained, and legacy control centers are not properly equipped to cope with these issues. Fortunately, distribution energy resource management systems (DERMSs) are emerging software technologies aimed to provide distribution system operators (DSOs) with a specialized set of tools to enable them to overcome the issues caused by DERs and to maximize the benefits of the presence of high penetration of these novel resources. However, as DERMS technology is still emerging, its definition is vague and can refer to very different levels of software hierarchies, spanning from decentralized virtual power plants to DER aggregators and fully centralized enterprise systems (called utility DERMS). Although they are all frequently simply called DERMS, these software technologies have different sets of tools and aim to provide different services to different stakeholders. This paper explores how these different software technologies can complement each other, and how they can provide significant benefits to DSOs in enabling them to successfully manage evolving distribution networks with high penetration of DERs when they are integrated together into the control centers of distribution utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

UTM UAS Serivce Supplier Development: Sprint 1 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density and large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider(ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the first step in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and the underlying specifications for them, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and proposed specifications for USSs to participate in TCL4. This report describes Sprint One. In this Sprint, the focus was on establishing a baseline for the Application Programming Interfaces (APIs) and their associated data models. In addition, the concept of UAS Volume Reservations (UVR) (areas that impose restrictions on sUAS that are allowed to operate) was tested. NASA provided the specifications and iterated on them with partners while implementers developed to those specifications. NASA then tested each partner's implementation to ensure compatibility with all other implementers. This process helped all stakeholders gain confidence that the foundation for future Sprints was solid.

UAS service supplier↗

UTM UAS Service Supplier Development: Sprint 2 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the UTM Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density environments, large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider (ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the second of four planned steps in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and their underlying specifications, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and develop proposed specifications for USSs in order to to participate in TCL4. This report describes Sprint Two. In this Sprint, there was a major theme with four goals. The theme was the development and testing of a new USS discovery system, to better enable USSs to find and communicate with each other. The goals supporting this theme were: participants needed to implement and exercise the discovery service for USS-USS communications; USSs needed to demonstrate strategic deconfliction through operation sharing; the systems were to use discovery to aid in handling off-nominal operations; and finally, there was an investigation of an initial off-nominal reporting capability.

software engineering↗

The Role of Individual Differences in Executive Attentional Networks and Switching Choices in Multi-Task Management

Individual differences in cognitive processing relate to critical performance differences in real-world environments. Task switching is required for many of them and especially for task management during overload. Research exploring individual differences related to switching behavior (both frequency, and adherence to optimal switch times) is, however, sparse. We examined these relationships here, using the attentional network task to index executive control, and an ongoing tracking task (within a larger suite of concurrent task demands) to examine switching behavior. The results failed to support a general relationship between executive control and frequency in a complex, heterogeneous multi-task environment. However, higher executive control participants more successfully exploited optimal switching times, highlighting the varying role of individual differences in task management, when choice is unconstrained.

Gutzwiller, Robert S.↗

Efficient and choreographed quality-of- service management in dense 6G verticals with high-speed mobility requirements

Future 6G networks are envisioned to support very heterogeneous and extreme applications (known as verticals). Some examples are further-enhanced mobile broadband communications, where bitrates could go above one terabit per second, or extremely reliable and low-latency communications, whose end-to-end delay must be below one hundred microseconds. To achieve that ultra-high Quality-of-Service, 6G networks are commonly provided with redundant resources and intelligent management mechanisms to ensure that all devices get the expected performance. But this approach is not feasible or scalable for all verticals. Specifically, in 6G scenarios, mobile devices are expected to have speeds greater than 500 kilometers per hour, and device density will exceed ten million devices per square kilometer. In those verticals, resources cannot be redundant as, because of such a huge number of devices, Quality-of-Service requirements are pushing the effective performance of technologies at physical level. And, on the other hand, high-speed mobility prevents intelligent mechanisms to be useful, as devices move around and evolve faster than the usual convergence time of those intelligent solutions. New technologies are needed to fill this unexplored gap. Therefore, in this paper we propose a choreographed Quality-of-Service management solution, where 6G base stations predict the evolution of verticals at real-time, and run a lightweight distributed optimization algorithm in advance, so they can manage the resource consumption and ensure all devices get the required Quality-of-Service. Prediction mechanism includes mobility models (Markov, Bayesian, etc.) and models for time-variant communication channels. Besides, a traffic prediction solution is also considered to explore the achieved Quality-of-Service in advance. The optimization algorithm calculates an efficient resource distribution according to the predicted future vertical situation, so devices achieve the expected Quality-of-Service according to the proposed traffic models. An experimental validation based on simulation tools is also provided. Results show that the proposed approach reduces up to 12% of the network resource consumption for a given Quality-of-Service.

42 ENGINEERING↗

Constrained Deep Reinforcement Learning for Energy Sustainable Multi-UAV Based Random Access IoT Networks With NOMA

In this paper, we apply the Non-Orthogonal Multiple Access (NOMA) technique to improve the massive channel access of a wireless IoT network where solar-powered Unmanned Aerial Vehicles (UAVs) relay data from IoT devices to remote servers. Specifically, IoT devices contend for accessing the shared wireless channel using an adaptive p-persistent slotted Aloha protocol; and the solar-powered UAVs adopt Successive Interference Cancellation (SIC) to decode multiple received data from IoT devices to improve access efficiency. To enable an energy-sustainable capacity-optimal network, we study the joint problem of dynamic multi-UAV altitude control and multi-cell wireless channel access management of IoT devices as a stochastic control problem with multiple energy constraints. We first formulate this problem as a Constrained Markov Decision Process (CMDP), and propose an online model-free Constrained Deep Reinforcement Learning (CDRL) algorithm based on Lagrangian primal-dual policy optimization to solve the CMDP. Extensive simulations demonstrate that our proposed algorithm learns a cooperative policy in which the altitude of UAVs and channel access probability of IoT devices are dynamically controlled to attain the maximal long-term network capacity while ensuring energy sustainability of UAVs, outperforming baseline schemes. The proposed CDRL agent can be trained on a small network, yet the learned policy can efficiently manage networks with a massive number of IoT devices and varying initial states, which can amortize the cost of training the CDRL agent.

42 ENGINEERING↗

Scalable Distributed Reachability Analysis for Cyber-Physical Networked Microgrids with Communication Latency

Due to the high penetration of power-electronic-interfaced distributed energy resources (DERs), a microgrid's inertia is significantly reduced, making it sensitive to cyberand physical operational changes. When multiple microgrids are interconnected to form networked microgrids for improving system's resilience, the changes of one microgrid can quickly escalate to the overall system. In cyber-physical networked microgrids, the communication latency varies a lot. To efficiently quantify the impact of the communication latency on the dynamics of networked microgrids, a scalable distributed reachability analysis approach is presented in this paper. Reachable sets are calculated for each microgrid and then composited for the overall system dynamics evaluation. Extensive tests in the full paper will demonstrate the influence of communication latency on system dynamics and validate reachable sets can bound a system's all dynamic trajectories subject to latency changes. The test results also offer an insight into designing and managing the communication network for enhancing the system's resilience.

Li, Yan↗

Modeling and Simulation of an Integrated Gate Turnaround Management Concept

An Integrated Gate Turnaround Management (IGTM) prototype was developed at NASA Ames Simulation Laboratories (SimLabs) using Dallas Ft. Worth International Airport (DFW) to demonstrate the IGTM concepts feasibility and benefits. The simulation architecture includes: the IGTM controller, an Airline Operations Control (AOC) application, Big DataAnalytics Input (BAI) application, a terminal traffic simulation or known as NASA-developed Surface Operation Simulator and Scheduler (SOSS), and a Database Server. ActiveMQ, a Java messaging service, was used to emulate the System Wide Information Management (SWIM) data network messaging. This paper describes the modeling and simulation of the IGTM concept, and illustrates selected use cases to demonstrate the feasibility and benefits of the IGTM concept for optimizing gate turnaround operations.

gate turnaround management↗

Mapping SIEM Vulnerabilities in STIG

SIEM (Security Information and Event Management) tools monitor network traffic and allow users to quickly detect problems in their networks. Because of the valuable information processed by SIEM tools, it is important to understand their vulnerabilities. STIG (Structured Threat Intelligence Graph) is an application created at INL used to visualize data related to cyber threats. Using STIG can allow users to understand vulnerabilities related to their SIEM products and how to protect their systems.

99 GENERAL AND MISCELLANEOUS↗

A comparison of queueing, cluster and distributed computing systems

Using workstation clusters for distributed computing has become popular with the proliferation of inexpensive, powerful workstations. Workstation clusters offer both a cost effective alternative to batch processing and an easy entry into parallel computing. However, a number of workstations on a network does not constitute a cluster. Cluster management software is necessary to harness the collective computing power. A variety of cluster management and queuing systems are compared: Distributed Queueing Systems (DQS), Condor, Load Leveler, Load Balancer, Load Sharing Facility (LSF - formerly Utopia), Distributed Job Manager (DJM), Computing in Distributed Networked Environments (CODINE), and NQS/Exec. The systems differ in their design philosophy and implementation. Based on published reports on the different systems and conversations with the system's developers and vendors, a comparison of the systems are made on the integral issues of clustered computing.

Kaplan, Joseph A.↗

Image-based solar estimates

An example device is configured to determine, based on a sky image of a portion of sky over a power distribution network and using a convolutional neural network (CNN)-based image regression model, an estimated global horizontal irradiance (GHI) value and manage or control the power distribution network using the estimated GHI value. The device may also be configured to determine, based on GHI values and aggregate load values for at least a portion of the power distribution network, using a Bayesian Structural Time Series model, an estimated photovoltaic power output value for the at least a portion of the power distribution network. The device may manage or control the power distribution network using the estimated photovoltaic power output value.

Bernstein, Andrey↗

NASA SETI microwave observing project: Sky Survey element

The SETI Sky Survey Observing Program is one of two complimentary strategies that NASA plans to use in its microwave Search for Extraterrestrial Intelligence (SETI). The primary objective of the sky survey is to search the entire sky over the frequency range of 1.0 to 10.0 GHz for evidence of narrow band signals of extraterrestrial intelligent origin. Frequency resolutions of 30 Hz or narrower will be used across the entire band. Spectrum analyzers with upwards of ten million channels are required to keep the survey time approximately 6 years. Data rates in excess of 10 megabits per second will be generated in the data taking process. Sophisticated data processing techniques will be required to determine the ever changing receiver baselines, and to detect and archive potential SETI signals. Existing radio telescopes, including several of NASA's Deep Space Network (DSN) 34 meter antennas located at Goldstone, CA and Tidbinbilla, Australia will be used for the observations. The JPL has the primary responsibility to develop and carry out the sky survey. In order to lay the foundation for the full scale SETI Sky Survey, a prototype system is being developed at the JPL. The system will be installed at the new 34-m high efficiency antenna at the Deep Space Station (DSS) 13 research and development station, Goldstone, CA, where it will be used to initiate the observational phase of the NASA SETI Sky Survey. It is anticipated that the early observations will be useful to test signal detection algorithms, scan strategies, and radio frequency interference rejection schemes. The SETI specific elements of the prototype system are: (1) the Wide Band Spectrum Analyzer (WBSA); a 2-million channel fast Fourier transformation (FFT) spectrum analyzer which covers an instantaneous bandpass of 40 MHz; (2) the signal detection processor; and (3) the SETI Sky Survey Manager, a network-based C-language environment that provides observatory control, performs data acquisition and analysis algorithms. A high level description of the prototype hardware and software systems will be given and the current status of the system development will be reported.

Klein, M. J.↗