Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Role of NDE and In-Situ Process Monitoring in Managing Risk of AM Space Hardware

The recently published NASA-STD-6030 defines the Additive Manufacturing (AM) Requirements for Spaceflight Systems. Key aspects of the certification approach include the development of a qualified material process (QMP) and material characterization determined by part classification. Nondestructive evaluation (NDE) of the full surface and volume is required for all part classifications except those with negligible risk. NASA is exploring the use of in-process monitoring data to improve risk posture and supplement post-build inspection for complex parts. Currently, the most challenging obstacle to overcome is linking the indications in the monitoring data to the physics of the process and the final material state of the finished part. NASA is undertaking studies to understand and quantify this relationship for various monitoring methods. The desired goal is to develop a protocol to establish this correlation for any monitoring method. Once this correlation is known, the critical defect size can be linked to a representative indication in the monitoring data, and the capability of the monitoring system can be tested using the 90/95 probability of detection requirement for NDE methods. This would enable the use of in-process monitoring as a defect screening activity for AM part certification. Many high-criticality components built with AM have high complexity and therefore limited inspectability, so using in-process monitoring can help address this certification gap. The use of adaptive, closed-loop monitoring systems that alter the locked process will require a new approach to the QMP.

advanced manufacturing↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Groundwater Monitoring Optimization of Post Closure Waste Sites at SRS - 13184

Groundwater monitoring at the Savannah River Site (SRS) is required at dozens of waste sites and includes sampling at over 1,000 monitoring wells. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost that represents an increasing proportion of the environmental management budget as surface waste units are closed. Therefore, a comprehensive evaluation of the monitoring program for eighteen regulated waste units was conducted to identify areas where monitoring could be optimized. The units evaluated varied considerably in the scope of monitoring; ranging from two wells to hundreds of wells. In order to systematically evaluate such disparate monitoring networks, SRS developed a decision-logic analysis using flow sheets to address potential areas of optimization. Five areas were identified for evaluation, including: (1) Comparison of current monitoring to regulatory requirements, (2) Spatial distribution, (3) Temporal sampling, (4) Analyte requirements, and (5) Reporting frequency and content. Optimization recommendations were made for fifteen of the eighteen groundwater units. The spatial evaluation resulted in recommendations to suspend sampling in 79 wells and add sampling at 16 wells. The temporal evaluation resulted in recommendations to reduce the number of well visits per year by 504. Analyte reductions were recommended at three groundwater units, with increases at three other units. Reporting frequency reductions were recommended for five units. Approximately $700,000 (direct dollars) of potential annualized cost savings were identified for these groundwater units, provided all recommendations are approved. The largest area of savings was associated with reducing the reporting frequency. The optimization approach has been presented to the EPA and South Carolina Department of Environmental Control (SCHDEC), with unit-specific recommendations approved for all five units presented. This approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an In-Situ Decommissioning Sensor Network Test Bed for Structural Condition Monitoring - 12156

The Savannah River National Laboratory (SRNL) has established an In Situ Decommissioning (ISD) Sensor Network Test Bed, a unique, small scale, configurable environment, for the assessment of prospective sensors on actual ISD system material, at minimal cost. The Department of Energy (DOE) is presently implementing permanent entombment of contaminated, large nuclear structures via ISD. The ISD end state consists of a grout-filled concrete civil structure within the concrete frame of the original building. Validation of ISD system performance models and verification of actual system conditions can be achieved through the development a system of sensors to monitor the materials and condition of the structure. The ISD Sensor Network Test Bed has been designed and deployed to addresses the DOE-Environmental Management Technology Need to develop a remote monitoring system to determine and verify ISD system performance. Commercial off-the-shelf sensors have been installed on concrete blocks taken from walls of the P Reactor Building at the Savannah River Site. Deployment of this low-cost structural monitoring system provides hands-on experience with sensor networks. The initial sensor system consists of groutable thermistors for temperature and moisture monitoring, strain gauges for crack growth monitoring, tilt-meters for settlement monitoring, and a communication system for data collection. Baseline data and lessons learned from system design and installation and initial field testing will be utilized for future ISD sensor network development and deployment. The Sensor Network Test Bed at SRNL uses COTS sensors on concrete blocks from the outer wall of the P Reactor Building to measure conditions expected to occur in ISD structures. Knowledge and lessons learned gained from installation, testing, and monitoring of the equipment will be applied to sensor installation in a meso-scale test bed at FIU and in future ISD structures. The initial data collected from the sensors installed on the P Reactor Building blocks define the baseline materials condition of the P Reactor ISD external concrete structure. Continued monitoring of the blocks will enable evaluation of the effects of aging on the P Reactor ISD structure. The collected data will support validation of the material degradation model and assessment of the condition of the ISD structure over time. The following are recommendations for continued development of the ISD Sensor Network Test Bed: - Establish a long-term monitoring program using the concrete blocks with existing sensor and/or additional sensors for trending the concrete materials and structural condition; - Continue development of a stand-alone test bed sensor system that is self-powered and provides wireless transmission of data to a user-accessible dashboard; - Develop and implement periodic NDE/DE characterization of the concrete blocks to provide verification and validation for the measurements obtained through the sensor system and concrete degradation model(s). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Socio-Technical Perspective on Repository Monitoring - 12229

Monitoring geological repositories for high-activity radioactive wastes has both technical and social dimensions, which are closely interrelated. To investigate the implications of this for geological disposal, data on experts' expectations of repository monitoring and the functions that it is expected to serve were analysed. The analysis drew on strategic and technical documents on monitoring produced by national agencies and by international organisations or projects; interviews with specialists in radioactive waste management organisations on monitoring and on their perceptions of societal concerns and expectations; and observations from technical workshops on repository monitoring. Three main rationales for monitoring were found: performance confirmation; decision support in a step-wise process; and public and stakeholder confidence building. The expectation that monitoring will enhance public confidence is then examined from a social scientific perspective and the potential for and challenges to using monitoring in this way are reviewed. In conclusion, implications for stakeholder engagement in the development of monitoring objectives and strategies are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Structured Decision Making to Hanford Site Radiological Air Monitoring - 17924

Radiological air monitoring is a component of an Environmental Surveillance (ES) program that has been in operation at the Department of Energy Hanford Site for several decades. The primary objectives of the ES program are protection of human health and the environment (on and off-site) as well as regulatory compliance. The ES program was designed decades ago when the plutonium-production reactors and related facilities at the Hanford Site were operational and air emissions were more widespread and significant than today. We employed a structured decision making (SDM) approach that integrates science with values and preferences to a Hanford Site air monitoring program decision. Specifically, a decision was necessary pertaining to the possible replacement of three air monitoring stations located in the 100 Area of the Hanford Site because the power line that supports these stations was near the end of its lifecycle. Although focused on this specific decision, the SDM model is more broadly applicable to decisions pertaining to adapting the air monitoring network to current Hanford operations. The value focused thinking approach that underlies SDM facilitates transparent and defensible decision making, and aids in communicating monitoring rationale. Some of the fundamental objectives elicited from the decision makers regarding management options for the three air monitoring stations included maximizing the ability to measure releases, minimizing environmental impacts, and maximizing social and economic sustainability. The fundamental objectives were linked to six objectives that could be measured (quantified) to allow a decision-analytic solution to the decision problem. Value functions and preference weights were developed for each of the objectives measures based on information obtained during a project workshop as well as by review and analysis of environmental data. Lastly, a set of five management options was identified that might achieve at least one of the objectives. A Bayes Network was developed as a solution to the decision problem pertaining to the three air stations (the 3 air stations decision). The Bayes Network describes the decision model graphically, and also serves as the computational engine for the decision analysis. The Bayes Network defines the relationship among the five management options and six objectives measures. In addition to the weights and value functions noted above, key inputs to the Bayes Network include a set of probabilities related to the different model states defined by the network. These include the probability of a significant release occurring, the probability that a release would be detected under each of the five management options, and the probability of achieving the other objective measures under each management option. In this manner the Bayesian Network captures the uncertainty in the components of the decision model. Replacing the three air monitoring stations with thermoluminescent dosimeters was identified as the preferred management option. A brief report was developed documenting the SDM model, including the workshop notes and analyses that were used to develop the objectives and model input variable values. This application demonstrates SDM's utility for supporting monitoring program decisions and, critically, providing a transparent and traceable basis for the decision. This relatively simple SDM model also provides a basis for an SDM model for monitoring decisions related to the more complex and holistic goal of achieving ES program objectives. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Panel Session 100: An Integrated Systems-Based Monitoring Approach

This panel focused on recent advancements in monitoring and remaining challenges associated with the implementing cost-effective monitoring approaches for complex DOE sites. Monitoring presents one of the largest, long-term costs for environmental remediation and site stewardship within the DOE because contamination at complex sites will likely be present for tens to hundreds of years into the future. Integration of monitoring with predictive modeling is an approach that can reduce long-term monitoring costs as well as support the effective monitoring design and data interpretation for managing a site toward closure and long-term stewardship. Panelists with presentations: Autonomous Electrical Geophysical Monitoring of Contaminated Sites (Tim Johnson); Systems Based Long-Term Monitoring for DOE Legacy Management (David Shafer); Long-Term Systems Based Monitoring (Anderson Ward)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Framework for Structural Online Health Monitoring of Aging and Degradation of Secondary Systems due to some Aspects of Erosion

This report describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants. The report also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real-time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long-range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

47 OTHER INSTRUMENTATION↗

Effective detection of CO 2 leakage: a comparison of groundwater sampling and pressure monitoring

Shallow aquifer monitoring is likely to be a required aspect to any geologic CO 2 sequestration operation. Collecting groundwater samples and analyzing for geochemical parameters such as pH, alkalinity, total dissolved carbon, and trace metals has been suggested by a number of authors as a possible strategy to detect CO 2 leakage. The effectiveness of this approach, however, will depend on the hydrodynamics of the leak-induced CO 2 plume and the spatial distribution of the monitoring wells relative to the origin of the leak. To our knowledge, the expected effectiveness of groundwater sampling to detect CO 2 leakage has not yet been quantitatively assessed. In this study we query hundreds of simulations developed for the National Risk Assessment Project (US DOE) to estimate risks to drinking water resources associated with CO 2 leaks. The ensemble of simulations represent transient, 3-D multi-phase reactive transport of CO 2 and brine leaked from a sequestration reservoir, via a leaky wellbore, into an unconfined aquifer. Key characteristics of the aquifer, including thickness, mean permeability, background hydraulic gradient, and geostatistical measures of aquifer heterogeneity, were all considered uncertain parameters. Complex temporally-varying CO 2 and brine leak rate scenarios were simulated using a heuristic scheme with ten uncertain parameters. The simulations collectively predict the spatial and temporal evolution of CO 2 and brine plumes over 200 years in a shallow aquifer under a wide range of leakage scenarios and aquifer characteristics. Using spatial data from an existing network of shallow drinking water wells in the Edwards Aquifer, TX, as one illustrative example, we calculated the likelihood of leakage detection by groundwater sampling. In this monitoring example, there are 128 wells available for sampling, with a density of about 2.6 wells per square kilometer. If the location of the leak is unknown a priori, a reasonable assumption in many cases, we found that the leak would be detected in at least one of the monitoring wells in less than 10% of the scenarios considered. This is because plume sizes are relatively small, and so the probability of detection decreases rapidly with distance from the leakage point. For example, 400m away from the leakage point there is less than 20% chance of detection. We then compared the effectiveness of groundwater quality sampling to shallow aquifer and/or reservoir pressure monitoring. For the Edwards Aquifer example, pressure monitoring in the same monitoring well network was found to be even less effective that groundwater quality monitoring. This is presumably due to the unconfined conditions and relatively high permeability, so pressure perturbations quickly dissipate. Although specific results may differ from site to site, this type of analysis should be useful to site operators and regulators when selecting leak detection strategies. Given the spatial characteristics of a proposed monitoring well network, probabilities of leakage detection can be rapidly calculated using this methodology. Although conditions such as these may not be favorable for leakage detection in shallow aquifers, leakage detection could be much more successful in the injection reservoir. We demonstrate proof-of-concept for this hypothesis, presenting a simulation where there is measurable pressure change at the injection well due to overpressurization, fault rupture, and consequent leakage up the fault into intermediate and shallow aquifers. The size of the detectible pressure change footprint is much larger in the reservoir than in either of the overlying aquifers. Further exploration of the range of conditions for which this technique would be successful is the topic of current study.

54 ENVIRONMENTAL SCIENCES↗

Optimized, Budget-constrained Monitoring Well Placement Using DREAM

Defining the ideal suite of monitoring technologies to be deployed at a carbon capture and storage (CCS) site presents a challenge to project developers, financers, insurers, regulators and other stakeholders. The monitoring, verification, and accounting (MVA) toolkit offers a suite of technologies to monitor an extensive range of parameters across a wide span of spatial and temporal resolutions, each with their own degree of sensitivity to changes in the parameter being monitored. Understanding how best to optimize MVA budgets to minimize the time to leak detection could help to address issues around project risks, and in turn help support broad CCS deployment. This paper presents a case study demonstrating an application of the Designs for Risk Evaluation and Management (DREAM) tool using an ensemble of CO 2 leakage scenarios taken from a previous study on leakage impacts to groundwater. Impacts were assessed and monitored as a function of pH, total dissolved solids (TDS), and trace metal concentrations of arsenic (As), cadmium (Cd), chromium (Cr), and lead (Pb). Using output from the previous study, DREAM was used to optimize monitoring system designs based on variable sampling locations and parameters. The algorithm requires the user to define a finite budget to limit the number of monitoring wells and technologies deployed, and then iterates well placement and sensor type and location until it converges on the configuration with the lowest time to first detection of the leak averaged across all scenarios. To facilitate an understanding of the optimal number of sampling wells, DREAM was used to assess the marginal utility of additional sampling locations. Based on assumptions about monitoring costs and replacement costs of degraded water, the incremental cost of each additional sampling well can be compared against its marginal value in terms of avoided aquifer degradation. Applying this method, DREAM identified the most cost-effective ensemble with 14 monitoring locations. Here, while this preliminary study applied relatively simplistic cost and technology assumptions, it provides an exciting proof-of-concept for the application of DREAM to questions of cost-optimized MVA system design that are informed not only by site-specific costs and technology options, but also by reservoir simulation results developed during site characterization and operation.

47 OTHER INSTRUMENTATION↗

Designing monitoring networks for local earthquakes

Abstract Seismic networks are essential for monitoring local earthquakes in connection to industrial activities, including wastewater injection and CO2 sequestration. Because these networks are typically deployed for short periods of time at specific sites, it is beneficial to develop best practices for efficient and effective installation and monitoring. Such standards are available for regional earthquake and microseismic monitoring, but not readily available for local scale (tens of kilometer scale) monitoring. Once the region of interest has been determined, the key parameters for establishing a network are available monitoring station locations, site noise, and site utility. Networks should be designed based on the project monitoring goals for earthquake magnitude and density. Herein, a network was established at the Patterson and Hartland Oil Fields in western Kansas in association with a US Department of Energy CarbonSAFE carbon capture and sequestration research project. We employed observations from an analog local network, the Wellington Earthquake Monitoring Network in south-central Kansas, to assess site noise and estimate earthquake detection thresholds for the Patterson and Hartland fields. Noise from oil production facilities was evaluated, concluding that oil lease sites are suitable for monitoring small local earthquakes (M1-M3). The network was designed to have a magnitude of completeness of M1 while using station locations on existing field operator leases. Fifteen months of continuous network operation demonstrates reliable and efficient local earthquake monitoring and provides best practices recommendations for similar operations.

58 GEOSCIENCES↗

Optimization of the x-ray monitoring angle for creating a correlation model between internal and external respiratory signals

Purpose: To perform dynamic tumor tracking irradiation with the Vero4DRT (MHI-TM2000), a correlation model [four dimensional (4D) model] between the displacement of infrared markers on the abdominal wall and the three-dimensional position of a tumor indicated by a minimum of three implanted gold markers is required. However, the gold markers cannot be detected successfully on fluoroscopic images under the following situations: (1) overlapping of the gold markers; and (2) a low intensity ratio of the gold marker to its surroundings. In the present study, the authors proposed a method to readily determine the optimal x-ray monitoring angle for creating a 4D model utilizing computed tomography (CT) images. Methods: The Vero4DRT mounting two orthogonal kV x-ray imaging subsystems can separately rotate the gantry along an O-shaped guide-lane and the O-ring along its vertical axis. The optimal x-ray monitoring angle was determined on CT images by minimizing the root-sum-square of water equivalent path lengths (WEPLs) on the orthogonal lines passing all of the gold markers while rotating the O-ring and the gantry. The x-ray monitoring angles at which the distances between the gold markers were within 5 mm at the isocenter level were excluded to prevent false detection of the gold markers in consideration of respiratory motions. First, the relationship between the WEPLs (unit: mm) and the intensity ratios of the gold markers was examined to assess the validity of our proposed method. Second, our proposed method was applied to the 4D-CT images at the end-expiration phase for 11 lung cancer patients who had four to five gold markers. To prove the necessity of the x-ray monitoring angle optimization, the intensity ratios of the least visible markers (minimum intensity ratios) that were estimated from the WEPLs were compared under the following conditions: the optimal x-ray monitoring angle and the angles used for setup verification. Additionally, the intra- and interfractional variations in the intensity ratio were examined from the optimal x-ray monitoring angle. Results: A negative strong correlation was observed between the WEPL (x) and the intensity ratio (y) (y= 6.57 exp[-0.0125x]+ 1, R=-0.88 [95% confidence interval: -0.85 to -0.90], p < 0.01). Our proposed method effectively avoided having the x-ray beam pass through high-density structures, although there were large interpatient variations in the optimal x-ray monitoring angle because of the geometric arrangement between the gold markers and the anatomical structures. The minimum intensity ratios that were estimated from the WEPLs at the optimal x-ray monitoring angle ranged from 1.43 to 2.48, which was an average of 1.27 times (range, 1.02-1.66) higher than the angles used for setup verification. The maximum intra- and interfractional decreases in the intensity ratio were 0.23 and 0.17, respectively. Conclusions: The authors demonstrated that the optimal x-ray monitoring angle for creating a 4D model can improve the visibility of gold markers.

60 APPLIED LIFE SCIENCES↗

SU-F-I-61: Assessment and Characterization of the Built-in Internal Photometer of Primary Diagnostic Monitors

Purpose: The conformance of Primary Diagnostic Monitors (PDMs) to the DICOM GSDF is increasingly required by several state and city regulators. Our purpose was to quantitatively characterize the luminance performance of the internal, built in photometer of BARCO monitors against an externally calibrated luminance meter. Methods: Thirty one PDMs (BARCO) were included in our analysis. An externally calibrated photometer (RaySafe Solo Light) was used to measure the luminance and illuminance values. Measured monitors were located at various hospital sites, radiology physicians’ offices and radiology reading rooms. All measured PDMs were equipped with the manufacturer’s built-in photometers and connected to Barco MediCal QA web service for manual and automatic quality control measurements. PDM combinations included 1, 2 and 4 monitors depending on the location. TG-18 and SMPTE test patterns were used to evaluate monitor performance. Results: All the PDMs exceeded the luminance ratio of 250:1, as required by NYC PDM guidelines. One PDM failed the NYC requirement for the minimal luminance level of 350 cd/m2. As compared to the external photometer, the difference in measurement of the maximum luminance with the built-in photometer was found to exceed 5% on 6 of the PDM measured, with a maximum deviation of 10%. The age of the monitors that failed was on average 5 years. All monitors passed the luminance uniformity test, which was 30% from the center of the monitor to the 4 corner locations. Four PDMs failed the Gray Scale Display Function (GSDF) calibration. Conclusion: For the consistent display of medical images and continued conformance with the DICOM GSDF standard, it is essential to compare the performance of the built-in photometer with an externally calibrated photometer for monitors that are older than 5 years.

60 APPLIED LIFE SCIENCES↗

MO-FG-CAMPUS-JeP3-04: Feasibility Study of Real-Time Ultrasound Monitoring for Abdominal Stereotactic Body Radiation Therapy

Purpose: Ultrasound is ideal for real-time monitoring in radiotherapy with high soft tissue contrast, non-ionization, portability, and cost effectiveness. Few studies investigated clinical application of real-time ultrasound monitoring for abdominal stereotactic body radiation therapy (SBRT). This study aims to demonstrate the feasibility of real-time monitoring of 3D target motion using 4D ultrasound. Methods: An ultrasound probe holding system was designed to allow clinician to freely move and lock ultrasound probe. For phantom study, an abdominal ultrasound phantom was secured on a 2D programmable respiratory motion stage. One side of the stage was elevated than another side to generate 3D motion. The motion stage made periodic breath-hold movement. Phantom movement tracked by infrared camera was considered as ground truth. For volunteer study three healthy subjects underwent the same setup for abdominal SBRT with active breath control (ABC). 4D ultrasound B-mode images were acquired for both phantom and volunteers for real-time monitoring. 10 breath-hold cycles were monitored for each experiment. For phantom, the target motion tracked by ultrasound was compared with motion tracked by infrared camera. For healthy volunteers, the reproducibility of ABC breath-hold was evaluated. Results: Volunteer study showed the ultrasound system fitted well to the clinical SBRT setup. The reproducibility for 10 breath-holds is less than 2 mm in three directions for all three volunteers. For phantom study the motion between inspiration and expiration captured by camera (ground truth) is 2.35±0.02 mm, 1.28±0.04 mm, 8.85±0.03 mm in LR, AP, SI directly, respectively. The motion monitored by ultrasound is 2.21±0.07 mm, 1.32±0.12mm, 9.10±0.08mm, respectively. The motion monitoring error in any direction is less than 0.5 mm. Conclusion: The volunteer study proved the clinical feasibility of real-time ultrasound monitoring for abdominal SBRT. The phantom and volunteer ABC studies demonstrated sub-millimeter accuracy of 3D motion movement monitoring.

60 APPLIED LIFE SCIENCES↗

Rapid monitoring of fermentations: a feasibility study on biological 2,3-butanediol production

2,3-butanediol (2,3-BDO) is an economically important platform chemical that can be produced by the fermentation of sugars using an engineered strain of Zymomonas mobilis . These fermentations require continuous monitoring and modification of fermentation conditions to maximize 2,3-BDO yields and minimize the production of the undesired coproducts glycerol and acetoin. Because of the time required for sampling and off-line chromatographic measurement of fermentation samples, the ability of fermentation scientists to modify fermentation conditions in a timely manner is limited. The goal of this study was to test if near-infrared spectroscopy (NIRS) along with multivariate statistics could reduce the time needed for this analysis and enable real-time monitoring and control of the fermentation. In this work we developed partial least squares (PLS) calibration models to predict the concentrations of glucose, xylose, 2,3-BDO, acetoin, and glycerol in fermentations via NIRS using two different spectrometers and two different spectroscopy modalities. We first evaluated the feasibility of rapid NIRS monitoring through experiments where we measured the signals from each analyte of interest and built NIRS-based PLS models using spectra from synthetic samples containing uncorrelated concentrations of these analytes. All analytes showed unique spectral signatures, and this initial modeling showed that all analytes could be detected simultaneously. We then began work with samples from laboratory fermentation experiments and tested the feasibility of regression model development across two spectral collection modalities (at-line and on-line) and two instruments: a laboratory-grade instrument and a low-cost instrument with a more limited spectral range. All modalities showed promise in the ability to monitor Z. mobilis fermentations of glucose and xylose to 2,3-BDO. The low-cost instrument displayed a lower signal-to-noise ratio than the laboratory-grade instrument, which led to comparatively lower performance overall, but still provided sufficient accuracy to monitor fermentation trends. While the ease of use of on-line monitoring systems was favored as compared to at-line systems due to the lack of sampling required and potential for automated process control, we observed some decrease in performance due to the additional complexity of the sample matrix. We have demonstrated that NIRS combined with multivariate analysis can be used for at-line and on-line monitoring of the concentrations of glucose, xylose, 2,3-BDO, acetoin, and glycerol during Z. mobilis fermentations. The decrease in signal-to-noise ratio when using a low-cost spectrometer led to greater prediction error than the laboratory-grade spectrometer for at-line monitoring. The on-line monitoring modality showed great promise for real time process control via NIRS.

09 BIOMASS FUELS↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2019

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2019, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2004 through FY 2019. This report contains data collected in 2019 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 55 sites selected to be representative sites for areas planted between the years of FY 2004 through FY 2019. Two revegetation site monitoring efforts occurred in 2019. The first effort was traditional revegetation monitoring, which analyzes the plant composition of representative revegetated sites for 5 years after they were planted. This monitoring is summarized in Section 3.0. The second effort evaluated the long-term trends of revegetated sites that were past their fifth year of growth. This monitoring is a continuation on the long-term trend monitoring that occurred in 2018 and is summarized in Section 4.0.

54 ENVIRONMENTAL SCIENCES↗

Monitoring and Modeling Astronaut Occupational Radiation Exposures in Space: Recent Advances

In 1982 astronauts were declared to be radiation workers by OSHA, and as such were subject to the rules and regulations applied to that group. NASA was already aware that space radiation was a hazard to crewmembers and had been studying and monitoring astronaut doses since 1962 at the Johnson Space Center. It was quickly realized NASA would not be able to accomplish all of its goals if the astronauts were subject to the ground based radiation worker limits, and thus received a waiver from OSHA to establish independent limits. As part of the stipulation attached to setting new limits, OSHA included a requirement to perform preflight dose projections for each crew and inform them of the associated risks. Additional requirements included measuring doses from various sources during the flight, making every effort to prevent a crewmember from exceeding the new limits, and keeping all exposures As Low As Reasonably Achievable (a.k.a. ALARA - a common health physics principle). The assembly of the International Space Station (ISS) and its initial manned operations will coincide with the 4-5 year period of high space weather activity at the next maximum in the solar cycle. For the first time in NASA's manned program, US astronauts will be in orbit continuously throughout a solar maximum period. During this period, crews are at risk of significantly increased radiation exposures due to solar particle events and trapped electron belt enhancements following geomagnetic storms. The problem of protecting crews is compounded by the difficulty of providing continuous real-time monitoring over a period of a decade in an era of tightly constrained budgets. In order to prepare for ISS radiological support needs, the NASA Space Radiation Analysis Group and the NOAA Space Environment Center have undertaken a multiyear effort to improve and automate ground-based space weather monitoring systems and real-time radiation analysis tools. These improvements include a coupled, automated space weather monitoring and alarm system--SPE exposure analysis system, an advanced space weather data distribution and display system, and a high-fidelity space weather simulation system. In addition, significant new real-time space weather data sets, which will enhance the forecasting and now-casting of near-Earth space environment conditions, are being made available through unique NASA-NOAA-USAF collaborations. These new data sets include coronal mass ejection monitoring by the Solar and Heliospheric Observatory (SOHO) and in-situ plasma and particle monitoring at the L1 libration point by the Solar Wind Monitor (SWIM) and Advanced Composition Explorer (ACE) spacecraft. Advanced real-time radiation monitoring data from charged particle telescopes and tissue equivalent proportional counters will also be available to assist crew and flight controllers in monitoring the external and intravehicular radiation environment.

Weyland, Mark↗

Hybrid Modeling Improves Health and Performance Monitoring

Scientific Monitoring Inc. was awarded a Phase I Small Business Innovation Research (SBIR) project by NASA's Dryden Flight Research Center to create a new, simplified health-monitoring approach for flight vehicles and flight equipment. The project developed a hybrid physical model concept that provided a structured approach to simplifying complex design models for use in health monitoring, allowing the output or performance of the equipment to be compared to what the design models predicted, so that deterioration or impending failure could be detected before there would be an impact on the equipment's operational capability. Based on the original modeling technology, Scientific Monitoring released I-Trend, a commercial health- and performance-monitoring software product named for its intelligent trending, diagnostics, and prognostics capabilities, as part of the company's complete ICEMS (Intelligent Condition-based Equipment Management System) suite of monitoring and advanced alerting software. I-Trend uses the hybrid physical model to better characterize the nature of health or performance alarms that result in "no fault found" false alarms. Additionally, the use of physical principles helps I-Trend identify problems sooner. I-Trend technology is currently in use in several commercial aviation programs, and the U.S. Air Force recently tapped Scientific Monitoring to develop next-generation engine health-management software for monitoring its fleet of jet engines. Scientific Monitoring has continued the original NASA work, this time under a Phase III SBIR contract with a joint NASA-Pratt & Whitney aviation security program on propulsion-controlled aircraft under missile-damaged aircraft conditions.

Source record↗