Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “March 2007”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

DISENTANGLING THE SYSTEM GEOMETRY OF THE SUPERGIANT FAST X-RAY TRANSIENT IGR J11215-5952 WITH SWIFT

IGR J11215-5952 is a hard X-ray transient source discovered in 2005 April with the International Gamma-Ray Astrophysics Laboratory (INTEGRAL) and a member of the new class of high-mass X-ray binaries, the supergiant fast X-ray transients (SFXTs). While INTEGRAL and Rossi X-Ray Timing Explorer observations have shown that the outbursts occur with a periodicity of {approx}330 days, Swift data have recently demonstrated that the true outburst period is {approx}165 days. IGR J11215-5952 is the first discovered SFXT displaying periodic outbursts, which are possibly related to the orbital period. The physical mechanism responsible for the X-ray outbursts in SFXTs is still debated. The main hypotheses proposed to date involve the structure of the companion wind or gated mechanisms related to the properties of the compact object. We test our proposed model which explains the outbursts from SFXTs as being due to the passage of the neutron star inside the equatorially enhanced wind from the supergiant companion. We performed a Guest Investigator observation with Swift that lasted 20 ks and several follow-up Target of Opportunity (ToO) observations, for a total of {approx}32 ks, during the expected 'apastron' passage (defined assuming an orbital period of {approx}330 days), between 2008 June 16 and July 4. The characteristics of this 'apastron' outburst are quite similar to those previously observed during the 'periastron' outburst of 2007 February 9. The mean spectrum of the bright peaks can be fitted with an absorbed power-law model with a photon index of 1 and an absorbing column of {approx}10{sup 22} cm{sup -2}. This outburst reached luminosities of {approx}10{sup 36} erg s{sup -1} (1-10 keV), comparable with those measured in 2007. The light curve can be modeled with the parameters obtained by Sidoli et al. for the 2007 February 9 outburst, although some differences can be observed in its shape. The properties of the rise to this new outburst and the comparison with the previous outbursts allow us to suggest that the true orbital period of IGR J11215-5952 is very likely 164.6 days, and that the orbit is eccentric, with the different outbursts produced at the periastron passage, when the neutron star crosses the inclined equatorial wind from the supergiant companion. Based on a ToO observation performed on 2008 March 25-27, we can exclude that the period is 165/2 days.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Structural Dynamic Assessment of the GN2 Piping System for NASA's New and Powerful Reverberant Acoustic Test Facility

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007 to 2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cubic feet in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their T-junctions connecting the 12 in. supply line to their respective 4 in. branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed T-junction connections through non-destructive evaluation testing. Through structural dynamic modeling of the piping system, the root cause of the T-junction connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.

McNelis, Mark E.↗

SUZAKU/WAM AND RHESSI OBSERVATIONS OF NON-THERMAL ELECTRONS IN SOLAR MICROFLARES

We report on hard X-ray spectroscopy of solar microflares observed by the Wide-band All-sky Monitor (WAM), on board the Suzaku satellite, and by RHESSI. WAM transient data provide wide energy band (50 keV-5 MeV) spectra over a large field of view ({approx}2{pi} sr) with a time resolution of 1 s. WAM is attractive as a hard X-ray solar flare monitor due to its large effective area ({approx}800 cm{sup 2} at 100 keV, {approx}13 times larger than that of RHESSI). In particular, this makes it possible to search for high energy emission in microflares that is well below the RHESSI background. The WAM solar flare list contains six GOES B-class microflares that were simultaneously observed by RHESSI between the launch of Suzaku in 2005 July and 2010 March. At 100 keV, the detected WAM fluxes are more than {approx}20 times below the typical RHESSI instrumental background count rates. The RHESSI and WAM non-thermal spectra are in good agreement with a single power law with photon spectral indices between 3.3 and 4.5. In a second step, we also searched the RHESSI microflare list for events that should be detectable by WAM, assuming that the non-thermal power-law emission seen by RHESSI extends to >50 keV. From the 12 detectable events between 2005 July and 2007 February, 11 were indeed seen by WAM. This shows that microflares, similar to regular flares, can accelerate electrons to energies up to at least 100 keV.

79 ASTRONOMY AND ASTROPHYSICS↗

FLUOR HANFORD DECOMMISSIONING UPDATE

Fluor Hanford is completing D&D of the K East Basin at the U.S. Department of Energy's (DOE's) Hanford Site in southeastern Washington State this spring, with demolition expected to begin in June. Located about 400 yards from the Columbia River, the K East Basin is one of two indoor pools that formerly contained irradiated nuclear fuel, radioactive sludge and tons of contaminated debris. In unique and path-breaking work, workers finished removing the spent fuel from the K Basins in 2004. In May 2007, workers completed vacuuming the sludge into containers in the K East Basin, and transferring it into containers in the K West Basin. In December, they finished vacuuming the remainder of K West Basin sludge into these containers. The K East Basin was emptied of its radioactive inventory first because it was more contaminated than the K West Basin, and had leaked in the past. In October 2007, Fluor Hanford began physical D&D of the 8,400-square foot K East Basin by pouring approximately 14-inches of grout into the bottom of it. Grout is a type of special cement used for encasing waste. Two months later, Fluor Hanford workers completed sluicing contaminated sand from the large filter that had sieved contaminants from the basin water for more than 50 years. Next, they poured grout into the filter housing and the vault that surrounds the filter, as well as into ion exchange columns that also helped filter basin water. For a six-week period in February and March, personnel drained the approximately one million gallons of contaminated water from the K East Basin. The effort required more than 200 tanker truck loads that transported the water to an effluent treatment facility for treatment and then release. A thin fixative was also applied to the basin walls as the water was removed to hold residual contamination in place. As soon as the water was out of the basin, Fluor pumped in approximately 18 feet of 'controlled density fill' material (somewhat similar to sand) to shield workers to a safe level from the residual radioactivity. Workers then continued preparations for demolishing the structure. Currently, they are isolating utilities, removing asbestos, draining oils, and removing other items not allowed to be disposed in Hanford's Environmental Restoration Disposal Facility (ERDF). The basin's superstructure will be demolished using a heavy industrial excavator equipped with a shear. This portion of the work is expected to be completed in September, with removal of the basin substructure to follow in 2009. D&D of the K East Basin eliminated the final major radioactive sources there, and made the Columbia River and the adjacent environment safer for everyone who lives downstream.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of the March 30, 2011 Hail Event at Shuttle Launch Pad 39A

The Kennedy Space Center (KSC) Hail Monitor System, a joint effort of the NASA KSC Physics Lab and the KSC Engineering Services Contract (ESC) Applied Technology Lab, was first deployed for operational testing in the fall of 2006. Volunteers from the Community Collaborative Rain, Hail, and Snow Network (CoCoRaHS) in conjunction with Colorado State University have been instrumental in validation testing using duplicate hail monitor systems at sites in the hail prone high plains of Colorado. The KSC Hail Monitor System (HMS), consisting of three stations positioned approximately 500 ft from the launch pad and forming an approximate equilateral triangle, as shown in Figure 1, was first deployed to Pad 39B for support of STS-115. Two months later, the HMS was deployed to Pad 39A for support of STS-116. During support of STS-117 in late February 2007, an unusually intense (for Florida standards) hail event occurred in the immediate vicinity of the exposed space shuttle and launch pad. Hail data of this event was collected by the HMS and analyzed. Support of STS-118 revealed another important application of the hail monitor system. Ground Instrumentation personnel check the hail monitors daily when a vehicle is on the launch pad, with special attention after any storm suspected of containing hail. If no hail is recorded by the HMS, the vehicle and pad inspection team has no need to conduct a thorough inspection of the vehicle immediately following a storm. On the afternoon of July 13, 2007, hail on the ground was reported by observers at the Vertical Assembly Building (VAB) and Launch Control Center (LCC), about three miles west of Pad 39A, as well as at several other locations at KSC. The HMS showed no impact detections, indicating that the shuttle had not been damaged by any of the numerous hail events which occurred on that day.

Lane, John E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

Annual report of groundwater monitoring at Centralia, Kansas, in 2009.

In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.

54 ENVIRONMENTAL SCIENCES↗

High-Dose-Rate Brachytherapy of a Single Implant With Two Fractions Combined With External Beam Radiotherapy for Hormone-Naive Prostate Cancer

Purpose: To evaluate the preliminary outcomes of high-dose-rate (HDR) brachytherapy of a single implant with two fractions and external beam radiotherapy (EBRT) for hormone-naive prostate cancer. Methods and Materials: Between March 2000 and Sept 2003, a total of 53 patients with tumor Stage T1c-T3b N0 M0 prostate cancer were treated with HDR brachytherapy boost doses (7.5 Gy/fraction) and 50-Gy EBRT during a 5.5-week period. Median follow-up was 61 months. Patients were divided into groups with localized (T1c-T2b) and advanced disease (T3a-T3b). We used the American Society for Therapeutic Radiology and Oncology (ASTRO) definition for biochemical failure. According to recommendations of the Radiation Therapy Oncology Group-ASTRO Phoenix Consensus Conference, biochemical failure-free control rates (BF-FCRs) at 3 years were investigated as 2 years short of the median follow-up. Results: Between April 2000 and Sept 2007, Common Terminology Criteria for Adverse Events Version 2.0 late Grade 2 genitourinary and gastrointestinal toxicity rates were 0% and 3.8%, respectively. Erectile preservation was 25% at 5 years. Overall survival was 88.1% and cause-specific survival was 100%. At 3 years, ASTRO BF-FCRs of the localized and advanced groups were 100% and 42%, respectively (p = 0.001). Conclusions: The HDR brachytherapy of a single implant with two fractions plus EBRT is effective in treating patients with localized hormone-naive prostate cancer, with the least genitourinary and gastrointestinal toxicities; however, longer median BF-FCR follow-up is required to assess these findings.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗

Pair-Trawl Detection of PIT-Tagged Juvenile Salmonids Migrating in the Columbia River Estuary, 2008 Report of Research.

In 2008, we sampled migrating juvenile Pacific salmonids Oncorhynchus spp. tagged with passive integrated transponder (PIT) tags using a surface pair trawl in the upper Columbia River estuary (rkm 61-83). The cod-end of the trawl was replaced with a cylindrical PIT-tag detection antenna with an 86-cm-diameter fish-passage opening and two detection coils connected in series. The pair trawl was 105 m long with a 91.5-m opening between the wings and a sample depth of 4.9 m. Also during 2008, we finalized the development of a prototype 'matrix' antenna, which was larger than previous antennas by a considerable magnitude. The matrix antenna consisted of 6 coils: a 3-coil front component and a 3-coil rear component, which were separated by 1.5-m of net mesh. The fish-passage opening was 2.5 m wide by 3.0 m tall and was attached to a standard-size pair trawl net. Intermittent sampling with a single crew began on 7 March and targeted yearling Chinook salmon O. tshawytscha and steelhead O. mykiss. Daily sampling using two crews began on 30 April and continued through 14 June; during this period we detected 2.7% of all juvenile salmonids previously detected at Bonneville Dam--a measure of sample efficiency. Sampling with a single crew continued through 20 August and targeted subyearling Chinook salmon. We detected 7,397 yearling Chinook salmon, 2,735 subyearling Chinook salmon, 291 coho salmon O. kisutch, 5,950 steelhead, and 122 sockeye salmon O. nerka in the upper estuary. We deployed the matrix antenna system and the older, cylindrical antenna system (86-cm-diameter fish-passage opening) simultaneously in mid-May 2008 to test matrix detection efficiency. The cylindrical antenna system had been used successfully in 2007 and early 2008. Because distribution of migrating salmonids in the estuary changes rapidly, we felt that a tandem sampling effort between the two systems was the only way to truly evaluate comparative detection efficiency. We deployed both systems within 1 km of each other during a period of high fish densities on 13, 14, and 15 May. Detections of the matrix system surpassed those of the cylindrical system by 53% in 14 h of simultaneous sampling (total detections 716 and 339, respectively). We believe that the higher detection rate observed with the matrix system was due to fewer smolts escaping the trawl entrance and to more smolts readily passing through the larger fish-passage opening. After tandem sampling, we continued exclusive use of the matrix system for the remainder of the 2008 juvenile migration season. Mean survival rates from Lower Granite to Bonneville Dam for yearling Chinook salmon and steelhead were 42% (SE = 3.7%) and 46% (SE = 1.5%), respectively. Over 358,000 PIT-tagged salmonids were transported, and we detected 4,619 of these fish.

13 HYDRO ENERGY↗

Status of planned change requests for the waste isolation pilot plant

At the submittal of the initial abstract to the Waste Management Symposium, the U.S. Department of Energy (DOE) had submitted and contemplated submitting a total of four planned change requests (PCRs) for U.S. Environmental Protection Agency (EPA) action before March of 2009. That date is the regulatory deadline for submitting the second Compliance Re-certification Application (CRA-2009) to the EPA. The Panel Closure PCR has subsequently been withdrawn in favor of postponing a final decision until after sufficient data has been obtained from the monitoring of hydrogen and methane in waste-filled rooms. A proposal to change a set of performance assessment (PA) parameters and a conceptual model has been removed from consideration due to schedule constraints. These parameters were the shear strength of the waste and the extent and evolution of the disturbed rock zone surrounding the rooms. A PCR was submitted to the EPA in April 2006 to reduce the mass of magnesium oxide (MgO) that must be emplaced in the repository. The EPA is currently reviewing the information submitted by DOE. A PCR was submitted to the EPA in November 2007 to allow emplacement of remote-handled transuranic (RH-TRU) waste in shielded containers on the floor of the repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Uranium Slugs at the CEA Marcoule site - 12026

The decladding units on the Marcoule nuclear site in southeast France were commissioned in the early 1960's to receive spent fuel cartridge for interim storage in pools and to prepare them for dissolution. After decladding, the uranium slugs were sent to the reprocessing plant for dissolution. The units were shut down in 1997. All the operational and process equipment was dismantled and transferred to the ANDRA waste repository between 1998 and 2001. During cleanup of the G2-G3 interim storage pool all the internal components (baskets and machinery) mounted on the civil engineering structures were cut up. In November 2007, a UNGG fuel slug in its aluminum cartridge was found at the bottom of the pool. Similarly, while iron slugs (used to control plutonium-producing reactors) were being sorted, five de-cladded uranium slugs were found between 2006 and 2008. As the processing facilities had already been dismantled, it was decided to send these fuel cartridges to a laboratory for dissolution. The project was to recover and condition the cartridge and slugs and transport them safely to the laboratory. This required the design of dedicated equipment due in particular to the high dose rate and pyro-phoricity hazard. The procedure also required safety clearance by the regulatory authorities for the operations within the facility and for the transport of radioactive materials. The cartridge was dissolved in May 2009, 18 months after it was discovered. Based on the experience acquired, the retrieval of the uranium slugs was completed in March 2011 after a year of preparation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report - 2008 (Rev. 0)

The U.S. Department of Energy’s (DOE’s) Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becoming the nation’s first deep geologic repository for the permanent disposal of defense-generated transuranic (TRU) waste. TRU waste generation has occurred at 39 sites across the country (seven large-quantity and 32 small-quantity sites). Sixteen of these sites (one large site and 15 small quantity sites) have emplaced their waste at WIPP, found other disposition pathways for the waste, or have transferred the waste to other sites for further disposition (LANL-CO, 2007a). Babcock and Wilcox (BL) [this site did not pursue a defense determination and was considered deinventoried], United States Army Materiel Command (USAMC), Knolls Atomic Power Laboratory – Nuclear Fuels Service (KAPL-NFS), and Lawrence Berkeley National Laboratory (LBNL) have been de-inventoried once, but have identified additional waste after the originally identified waste was removed from the site. TRU waste is currently retrievably stored at 23 sites throughout the DOE complex. As of December 31, 2007, there have been 6340 shipments of TRU waste to WIPP for emplacement since WIPP’s opening (DOE 2008a). Since 1994, DOE complex-wide TRU waste inventory information has been collected, analyzed, and published for WIPP certification urposes in several reports. The WIPP Transuranic Waste Baseline Inventory Report (WTWBIR), Revision 0, published in June 1994 (DOE 1994), was the first attempt made by the DOE complex to report all of its TRU waste at the waste-stream level. The TRU waste data reported in Revision 0 were considered preliminary until the TRU waste sites completed quality checks of the data. Data changes resulting from the quality checks were contained in the WTWBIR, Revision 1 (DOE 1995a). The Transuranic Waste Baseline Inventory Report (TWBIR), Revisions 2 and 3, included WIPP and potential TRU waste streams, along with waste stream characteristic information. Data from Revisions 2 and 3 provided the TRU waste inventory that Sandia National Laboratories–Carlsbad Programs Group (SNL-CPG) used to perform the necessary modeling calculations for the performance assessment (PA) for the initial certification of the WIPP (Compliance Certification Application [CCA]).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compatibility Study for Plastic, Elastomeric, and Metallic Fueling Infrastructure Materials Exposed to Aggressive Formulations of Isobutanol-blended Gasoline

The Energy Independence and Security Act (EISA) of 2007 is an omnibus energy policy law designed to move the United States toward greater energy security and independence. A key provision of EISA is the Renewable Fuel Standard (RFS), which requires the nation to use 36 billion gallons per year (BGPY) of renewable fuel in vehicles by 2022. Ethanol is the most widely used renewable fuel, and increasing the allowable ethanol content from 10% to 15% is expected to push renewable fuel consumption to as much as 21 BGPY. Therefore, a large portion of the 36 billion gallon requirement can be met by increasing the ethanol content in gasoline to 15%. However, raising the ethanol content to 15%, by itself, will still not fully meet the RSF requirement, and concerns have been raised that this increase in ethanol may not be entirely compatible with current and legacy materials used in standard gasoline fueling systems. In the summer of 2008, the U.S. Department of Energy (DOE) recognized the need to assess the impact of intermediate blends of ethanol on the fueling infrastructure, specifically those systems located at the fueling station. A short time later (March 2009), Growth Energy (a coalition of ethanol producers and supporters) requested a waiver from the U.S. Environmental Protection Agency (EPA) to allow the use of 15% ethanol in gasoline. In 1981 the EPA approved a waiver (known as the OCTAMIX waiver) that allowed other alcohol types (such as methanol) to be blended with gasoline as long as the resulting fuel blend was substantially similar to gasoline. Another requirement is that the fuel oxygen content cannot exceed 3.7 wt %. Currently, this requirement limits ethanol in gasoline to 10 vol %. The corresponding oxygen equivalent for isobutanol is 16 vol %; therefore, isobutanol offers a pathway towards meeting the RFS requirement by allowing greater biofuel usage than can be achieved by ethanol alone. In fact, the United States has already hit the “blend wall” for ethanol, the point at which virtually all gasoline sold is E10 and no remaining market is left for ethanol, meaning that the country cannot substantially increase ethanol usage unless the EPA allows for higher levels of ethanol or until E85 use is expanded significantly. Butamax Advanced Biofuels, LLC has developed proprietary technologies to convert corn into isobutanol. Much of the infrastructure already existing at ethanol plants can be readily converted to produce isobutanol instead. The focus of this investigation was to compare the compatibility of fueling infrastructure materials (such as elastomers, plastics, and metals) to test fuels representing E10 and E15 and their corresponding oxygen equivalents with isobutanol (iBu16 and iBu24). Butamax sponsored a research project at Oak Ridge National Laboratory (ORNL) to perform empirical studies using aggressive fuel formulations representing 16 and 24% isobutanol. The results contained within this report include a solubility analysis for each material type and fuel formulation and empirical results for elastomers, plastics, and metals. Data obtained from the preceding ethanol compatibility studies on these materials are included for additional interpretation and summary.

Kass, Michael D.↗

Recent Shuttle Post Flight MMOD Inspection Highlights

Post flight inspections on the Space Shuttle Atlantis conducted after the STS-11.5 mission revealed a 0.11 inch (2.8 mm) hole in the outer face sheet of the starboard payload bay door radiator panel #4. The payload bay door radiators in this region are 0.5 inch (12.7 mm) thick aluminum honeycomb with 0.011 in (0.279 mm) thick aluminum face sheets topped with 0.005 in (0.127 mm) silver-Teflon tape. Inner face sheet damage included a 0.267 in (6.78 mm) long through crack with measureable deformation in the area of 0.2 in (5.1 mm). There was also a 0.031 in (0.787 nun) diameter hole in the rear face sheet. A large approximately l in (25 mm) diameter region of honeycomb was also destroyed. Since the radiators are located on the inside of the shuttle payload bay doors which are closed during ascent and reentry, the damage could only have occurred during the on-orbit portion of the mission. During the August 2007 STS-118 mission to the International Space Station, a micro-meteoroid or orbital debris (MMOD) particle impacted and completely penetrated one of shuttle Endeavour's radiator panels and the underlying thermal control system (TCS) blanket, leaving deposits on (but no damage to) the payload bay door. While it is not unusual for shuttle orbiters to be impacted by small MMOD particles, the damage from this impact is larger than any previously seen on the shuttle radiator panels. One of the largest impacts ever observed on a crew module window occurred during the November 2008 STS-126 mission to the International Space Station. Damage to the window was documented by the crew on orbit. Post flight inspection revealed a 0.4 in (10.8 mm) crater in the window pane, with a depth of 0.03 in (0.76 mm). The window pane was replaced due to the damage caused by this impact. Analysis performed on residue contained in dental mold impressions taken of the site indicated that a meteoroid particle produced this large damage site. The post flight inspection after the subsequent mission, STS-119 in March of 2009, produced a large MMOD impact feature in a wing leading edge reinforced carbon-carbon panel. The crater measured 0.18 in (4.5 nun) in diameter and was nearly 0.037 in (0.93 nun) deep. The thickness of the silicon carbide coating that protects the carbon substrate is nominally 0.02 in (0.5 nun) to 0.04 in (1 mm), making this a significant impact into the RCC. The damage occurred on the upper surface of the panel, which experiences lower heat loads on re-entry. This poster will document the data collected from the impact sites and will include results of the Scanning Electron Microscope/Energy Dispersive X-ray (SEM/EDX) analysis. Evidence will be presented that suggests a source of the impacts.

Hyed, James L.↗

Throttling Characteristics of the RL10 Derivative Common Extensible Cryogenic Engine -- Demo 1.6 and 1.7 Test Results

The Common Extensible Cryogenic Engine (CECE) is a deep throttling cryogenic Lunar Module Descent Engine (LMDE) technology development demonstrator based on the Pratt & Whitney Rocketdyne (PWR) RL10 engine. Previous testing on this engine occurred during 2006 as Demo 1.0, then Demo 1.5 in 2007, Demo 1.6 in 2008 and finally Demo 1.7 in 2010. A review of Demo 1.0, 1.5, and preliminary results of 1.6 were reported in previous JANNAF papers. Demo 1.6 was tested at the PWR E-6 test facility in November 2008. The primary goal of this series was to mitigate low frequency combustion instability observed at low power levels. To mitigate the chug, the Demo 1.6 injector was modified from the previous configurations to include an approximately 0.050 inch thick teflon-type spray-on insulation to reduce heat transfer to the LOX manifold, which was believed to be a significant contributor to the low power instability. In addition, gaseous helium injection into the LOX manifold was used as a means to stabilize the system. Also explored in this test series was mitigation for a low power 1 Hz fuel system oscillation caused by sub-critical hydrogen boiling in the chamber cooling jacket. Reduced area gas venturis were utilized to avoid the 1 Hz fuel-size oscillation by keeping the cooling jacket supercritical down to lower engine power levels. Demo 1.7 began testing in March 2010. Its primary objectives were to demonstrate closed loop control capability on mixture ratio and chamber pressure, start to lower power levels and increased throttling ramp rates. Secondary test objectives that are discussed include multiple engine starts, higher mixture ratio excursions and additional time at low power level. While the complete test series and data reduction is not yet complete for Demo 1.7, an overview and up-to-date status is provided.

Devine, Matthew K.↗

Bias Correcting NOAA's High-Resolution Rapid Refresh (HRRR) Wind Resource Data for Grid Integration Applications [Slides]

Many weather years of high-quality wind data are widely accepted in the grid integration community to be important for studying wind energy technical potential, energy system operations, and grid resilience. NREL makes high-quality wind and solar resource data available. NREL's Grid-Atmosphere workshop (March 2024) identified NREL National Solar Radiation Database as widely used in grid integration modeling, but there is less agreement on commonly used wind datasets. One important factor identified by ESIG's 2023 report 'Weather Dataset Needs for Planning and Analyzing Modern Power Systems' for gold standard wind data is regular updates. To address the need for regular updates, NREL's team can now process all currently available and regularly updated High-Resolution Rapid Refresh (HRRR) outputs. HRRR is an hourly-updated operational forecast product produced by the National Oceanic and Atmospheric Administration (NOAA) (Dowell et al., 2022). One barrier to NREL using HRRR is systematic bias and consistency with NREL's existing wind datasets (e.g. WIND Toolkit, 'WTK') across weather years. To address this barrier, we show that the HRRR can be interpolated and bias-corrected to be consistent with NRE's existing datasets. We call the new dataset BC-HRRR (bias-corrected HRRR). As with historical datasets like the WTK, BC-HRRR is intended for use in grid integration modeling (e.g., capacity expansion, production cost, and resource adequacy modeling). BC-HRRR's (2015-present) consistency with WTK (2007-2013) allows NREL to extend internal grid integration tooling with 15+ weather years of wind data with low-overhead extensibility to future years as they are made available by NOAA. The rest of this slide deck documents the BC-HRRR processing methods, validation, and its implications for intended use.

17 WIND ENERGY↗

A 10 Year Climatology of Arctic Cloud Fraction and Radiative Forcing at Barrow, Alaska

A 10-yr record of Arctic cloud fraction and surface radiation budget has been generated using data collected from June 1998 to May 2008 at the Atmospheric Radiation Measurement (ARM) North Slope of Alaska (NSA) site and the nearby NOAA Barrow Observatory (BRW). The record includes the seasonal variations of cloud fraction (CF), cloud liquid water path (LWP), precipitable water vapor (PWV), surface albedo, shortwave (SW) and longwave (LW) fluxes and cloud radative forcings (CRFs), as well as their decadal variations. Values of CF derived from different instruments and methods agree well, having an annual average of ~0.74. Cloudiness increases from March to May, remains high (~0.8-0.9) from May to October, and then decreases over winter. More clouds and higher LWP and PWV occurred during the warm season (May-October) than the cold season (November-April). These results are strongly associated with southerly flow which transports warm, moist air masses to Barrow from the North Pacific and over area of Alaska already free of snow during the warm season and with a dipole pattern of pressure in which a high is centered over the Beaufort Sea and low over the Aleutians during the cold season. The monthly means of estimated clear-sky and measured allsky SW-down and LW-down fluxes at the two facilities are almost identical with the annual mean differences less than 1.6 W m-2. The downwelling and upwelling LW fluxes remain almost constant from January to March, then increase from March and peak during July-August. SW-down fluxes are primarily determined by seasonal changes in the intensity and duration of insolation over Northern Alaska, and are also strongly dependent on cloud fraction and optical depth, and surface albedo. The monthly variations of NET CRF generally follow the cycle of SW CRF, modulated by LW effects. On annual average, the negative SW CRF and positive LW CRF tend to cancel, resulting in annual average NET CRF of 2-4.5 Wm-2. Arctic clouds have a 3 net warming effect on the surface throughout the year, with exception of the snow-free period from middle June to middle September when there tends to be a cooling effect. The daily average surface albedos agree well at the two sites remaining high (>0.8) until late May, dropping below 0.2 after the snow melts around June and increasing during autumn once snow begins to accumulate. On the basis of long-term regression analyses CF has decreased by about 0.048 while temperature has risen by ≈1.1 K over the 10-yr period, which can be characterized by tendencies of warming mainly during December and April. With regard to the 2007 record minimum Arctic ice extent, this study provides additional empirical evidence that decreased cloud cover and increased SW-down flux during summer contributed to anomalous ice melt in the region north of Barrow. At Barrow, average June-August CF decreased by 0.062 in 2007 from the 10-yr mean, while SW-down and NET fluxes increased by 28.4 Wm-2 and 11.3 Wm-2, respectively. The increase in the NET radiative flux during summer 2007 most likely contributed to an increase in surface air temperature of 1.6 K.

54 ENVIRONMENTAL SCIENCES↗