Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONEY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

An intelligent advisor for the design manager

A design problem is viewed as a complex system divisible into modules. Before the design of a complex system can begin, much time and money are spent in determining the couplings among modules and the presence of iterative loops. This is important because the design manager must know how to group the modules into substems and how to assign subsystems to design teams so that changes in one subsystem will have predictable effects on other subsystems. Determining these subsystems is not an easy, straightforward process and often important couplings are overlooked. Moreover, the planning task must be repeated as new information becomes available or as the design specifications change. The purchase of this research effort is to develop a knowledge-based tool to act as an intelligent advisor for the design manager. This tool identifies the subsystems of a complex design problem, orders them into a well-structured format, and marks the couplings among the subsystems to facilitate the use of multilevel tools. The tool was tested in the decomposition of the COFS (Control of Flexible Structures) mast design which has about 50 modules. This test indicated that this type of approach could lead to a substantial savings by organizing and displaying a complex problem as a sequence of subsystems easily divisible among design teams.

Rogers, James L.↗

Spacecraft flight simulation: A human factors investigation into the man-machine interface between an astronaut and a spacecraft performing docking maneuvers and other proximity operations

The anticipated increase in rendezvous and docking activities in the various space programs in the Space Station era necessitates a renewed interest in manual docking procedures. Ten test subjects participated in computer simulated docking missions in which the influence of initial velocity was examined. All missions started from a resting position of 304.8 meters (1000 feet) along the space station's +V-bar axis. Test subjects controlled their vehicle with a translational hand controller and digital auto pilot which are both virtually identical to their space shuttle counterparts. While the 0.1 percent rule (range rate is equal to 0.1 percent of the range) used by space shuttle pilots is comfortably safe, it is revealed to be extremely inefficient in terms of time and not justifiable in terms of marginal safety. Time is worth money, not only because of training and launch costs, but because the sooner a pilot and spacecraft return from a mission, the sooner they can begin the next one. Inexperienced test subjects reduced the costs of simulated docking by close to a factor of 2 and achieved safe dockings in less than 4 percent of the time the baseline approach would entail. This reduction in time can be used to save lives in the event of an accident on orbit, and can tremendously reduce docking costs if fuel is produced from waste water on orbit.

Brody, Adam R.↗

Experiments and other methods for developing expertise with design of experiments in a classroom setting

The only way to gain genuine expertise in Statistical Process Control (SPC) and the design of experiments (DOX) is with repeated practice, but not on canned problems with dead data sets. Rather, one must negotiate a wide variety of problems each with its own peculiarities and its own constantly changing data. The problems should not be of the type for which there is a single, well-defined answer that can be looked up in a fraternity file or in some text. The problems should match as closely as possible the open-ended types for which there is always an abundance of uncertainty. These are the only kinds that arise in real research, whether that be basic research in academe or engineering research in industry. To gain this kind of experience, either as a professional consultant or as an industrial employee, takes years. Vast amounts of money, not to mention careers, must be put at risk. The purpose here is to outline some realistic simulation-type lab exercises that are so simple and inexpensive to run that the students can repeat them as often as desired at virtually no cost. Simulations also allow the instructor to design problems whose outcomes are as noisy as desired but still predictable within limits. Also the instructor and the students can learn a great deal more from the postmortum conducted after the exercise is completed. One never knows for sure what the true data should have been when dealing only with real life experiments. To add a bit more realism to the exercises, it is sometimes desirable to make the students pay for each experimental result from a make-believe budget allocation for the problem.

Patterson, John W.↗

Modularity in robotic systems

Most robotic systems today are designed one at a time, at a high cost of time and money. This wasteful approach has been necessary because the industry has not established a foundation for the continued evolution of intelligent machines. The next generation of robots will have to be generic, versatile machines capable of absorbing new technology rapidly and economically. This approach is demonstrated in the success of the personal computer, which can be upgraded or expanded with new software and hardware at virtually every level. Modularity is perceived as a major opportunity to reduce the 6 to 7 year design cycle time now required for new robotic manipulators, greatly increasing the breadth and speed of diffusion of robotic systems in manufacturing. Modularity and its crucial role in the next generation of intelligent machines are the focus of interest. The main advantages that modularity provides are examined; types of modules needed to create a generic robot are discussed. Structural modules designed by the robotics group at the University of Texas at Austin are examined to demonstrate the advantages of modular design.

Tesar, Delbert↗

Computer-Aided Design Of Sheet-Material Parts

Computer-aided-design system partly automates tedious process of designing and guiding assembly of small pieces of flat sheet material into large surfaces that approximate smoothly curved surfaces having complicated three-dimensional shapes. Capability provides for flexibility enabling designer to assess quickly and easily effects of changes in design in making engineering compromises among various sizes and shapes. Saves time and money in both design and fabrication. Used in rocket-engine application and other applications requiring design of sheet-material parts.

Gilbert, Jeffrey L.↗

Reusable Mechanical Pin Puller

Reusable mechanical pin puller relatively simple spring-loaded trigger mechanism. Designed to save money and increase safety as substitute for costly and potentially dangerous pyrotechnic pin pullers used in development and testing of deployment mechanisms.

Ngo, Son↗

Advanced telemetry systems for payloads. Technology needs, objectives and issues

The current trends in advanced payload telemetry are the new developments in advanced modulation/coding, the applications of intelligent techniques, data distribution processing, and advanced signal processing methodologies. Concerted efforts will be required to design ultra-reliable man-rated software to cope with these applications. The intelligence embedded and distributed throughout various segments of the telemetry system will need to be overridden by an operator in case of life-threatening situations, making it a real-time integration issue. Suitable MIL standards on physical interfaces and protocols will be adopted to suit the payload telemetry system. New technologies and techniques will be developed for fast retrieval of mass data. Currently, these technology issues are being addressed to provide more efficient, reliable, and reconfigurable systems. There is a need, however, to change the operation culture. The current role of NASA as a leader in developing all the new innovative hardware should be altered to save both time and money. We should use all the available hardware/software developed by the industry and use the existing standards rather than inventing our own.

Source record↗

Manual control aspects of orbital flight

Studies of spacecraft rendezvous and docking operations began in the Gemini program in preparation for the two dockings required to send a crew to the moon and return them safely to Earth. However, the goal of getting to the moon before the end of the decade was of greater concern than mission optimization so little or no time or money was expended in researching human factors implications of operational aspects such as braking gates or control modes. Also, with sixteen operational dockings over a six year period (12 Apollo, 3 Skylab, and 1 ASTP) in the United States space program, economies of scale were not yet available to justify extensive research into decreasing the time or fuel necessary for a successful docking. With an operational space station era approaching in which orbital maneuvering vehicle (OMV), orbital transfer vehicle (OTV), shuttle orbiter, and other traffic will play a major role, a concerted research effort now could help avoid many potential problems later in addition to increasing safety, fuel economy, and productivity. A knowledge of manual control capabilities associated with piloted spaceflight could help save a life if the operational flight envelope can be safely enlarged to include faster dockings that currently envisioned. For example, current and future research is designed to acquire the appropriate information.

Brody, Adam R.↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗

An integrated decision support system for TRAC: A proposal

Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

Mukkamala, Ravi↗

Comparative economics of space resource utilization

Physical economic factors such as mass payback ratio, total payback ratio, and capital payback time are discussed and used to compare the economics of using resources from the Moon, Mars and its moons, and near Earth asteroids to serve certain near term markets such as propellant in low Earth orbit or launched mass reduction for lunar and Martian exploration. Methods for accounting for the time cost of money in simple figures of merit such as MPRs are explored and applied to comparisons such as those between lunar, Martian, and asteroidal resources. Methods for trading off capital and operating costs to compare schemes with substantially different capital to operating cost ratio are presented and discussed. Areas where further research or engineering would be extremely useful in reducing economic uncertainty are identified, as are areas where economic merit is highly sensitive to engineering performance - as well as areas where such sensitivity is surprisingly low.

Cutler, Andrew Hall↗

Computer Simulation For Design Of TWT's

A three-dimensional finite-element analytical technique facilitates design and fabrication of traveling-wave-tube (TWT) slow-wave structures. Used to perform thermal and mechanical analyses of TWT designed with variety of configurations, geometries, and materials. Using three-dimensional computer analysis, designer able to simulate building and testing of TWT, with consequent substantial saving of time and money. Technique enables detailed look into operation of traveling-wave tubes to help improve performance for future communications systems.

Bartos, Karen F.↗

Kappa Group: The initial guess. A proposal in response to a commercial air transportation study

Kappa Aerospace presents their Aeroworld Aircraft, the Initial Guess (IG). This aircraft is designed to generate profit in the market which is currently controlled by the train and boat industry. The main priority of the design team was to develop an extremely efficient aircraft that could be sold at a reasonable price. The IG offers a quick and safe alternative to the existing means of transportation at a competitive price. The cruise velocity of 28 ft/sec. allows all flights to be between 20 and 45 minutes, which is a remarkable savings in time compared to travel by boat or train. The IG is propelled by a single Astro-05 engine with a Zinger 10-6 propeller. The Astro-05 is not an extremely powerful engine; however, it provides enough thrust to meet the design and safety requirements. The major advantage of the Astro-05 is that it is the most efficient engine available. The fuel efficiency of the Astro-05 is what puts the aircraft ahead of the competition. The money saved on an efficient engine can be passed on as lower ticket prices or increased revenue. The IG has a payload of 56 passengers and a wingspan of 7 ft. The 7 ft. wingspan allows the aircraft to fit into the gates of all of the cities that are targeted. Future endeavors of Kappa Aerospace will include fitting a stretch version of the IG with a larger propulsion system. This derivative aircraft will be able to carry more passengers and will be placed on the routes which have the greatest demand for travel. The fuselage and empennage are made of a wooden truss configuration, while the wing is made of a rib/spare configuration. The stress carrying elements are made of spruce, the nonstress carrying elements are made of balsa. The wing is removable for easy access into the fuselage. The easy access to the batteries will keep maintenance costs down.

Source record↗

Force limited vibration testing

A new method of conducting lab vibration tests of spacecraft equipment was developed to more closely simulate the vibration environment experienced when the spacecraft is launched on a rocket. The improved tests are tailored to identify equipment design and workmanship problems without inducing artificial failures that would not have occurred at launch. These new, less destructive types of vibration tests are essential to JPL's protoflight test approach in which lab testing is conducted using the flight equipment, often one of a kind, to save time and money. In conventional vibration tests, only the input vibratory motion is specified; the feedback, or reaction force, between the test item and the vibration machine is ignored. Most test failures occur when the test item goes into resonance, and the reaction force becomes very large. It has long been recognized that the large reaction force is a test artifact which does not occur with the lightweight, flexible mounting structures characteristic of spacecraft and space vehicles. In new vibration tests, both the motion and the force provided to the test item by the vibration machine are controlled, so that the vibration ride experienced by the test item is as in flight.

Scharton, Terry D.↗

Case for real-time systems development - Quo vadis?

The paper focuses on the distinctive issues of computer-aided software engineering (CASE) products for the development of real-time systems. CASE technologies and associated standardization efforts are evolving from sets of conflicting interests. The majority of case products are intended for use in the development of management information systems. CASE products to support the development of large, complex real-time systems must provide additional capabilities. Generic concerns include the quality of the implementation of the required method for the phase of the system's development and whether the vendor is stable and committed to evolving the products in parallel with nonproprietary standards. The CASE market is undergoing considerable consolidation. The paper describes the major forces, cooperating entities, and remaining uncertainties that need to be weighed in near-term CASE procurements to limit risk of loss of investment in project time, trianing, and money.

Erb, Dona M.↗

A ballistic investigation of the aerodynamic characteristics of a blunt vehicle at hypersonic speeds in carbon dioxide and air

Missions to Mars require the successful development of aerobraking technology, and therefore a blunt cone representative of aerobrake shapes is investigated. Ballistic tests of the Pioneer Venus configuration are conducted in carbon dioxide and air at Mach numbers from 7 to 20 and Reynolds numbers from 0.1 x 10 exp 5 to 4 x 10 exp 6. Experimental results show that for defined conditions aerodynamic research can be conducted in air rather than carbon dioxide, providing savings in time and money. In addition, the results offer a prediction of flight aerodynamics during entry into the Martian atmosphere. Also discussed is a comparison of results from two data-reduction techniques showing that a five-degree-of-freedom routine employing weighted least-squares with differential corrections analyzes ballistic data more accurately.

Packard, James D.↗

A hybrid symbolic/finite-element algorithm for solving nonlinear optimal control problems

The general code described is capable of solving difficult nonlinear optimal control problems by using finite elements and a symbolic manipulator. Quick and accurate solutions are obtained with a minimum for user interaction. Since no user programming is required for most problems, there are tremendous savings to be gained in terms of time and money.

Bless, Robert R.↗

Program Helps Decompose Complicated Design Problems

Time saved by intelligent decomposition into smaller, interrelated problems. DeMAID is knowledge-based software system for ordering sequence of modules and identifying possible multilevel structure for design problem. Displays modules in N x N matrix format. Requires investment of time to generate and refine list of modules for input, it saves considerable amount of money and time in total design process, particularly new design problems in which ordering of modules has not been defined. Program also implemented to examine assembly-line process or ordering of tasks and milestones.

Rogers, James L., Jr.↗