Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Load forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

308 records · Page 18

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

Modeling Stress-Induced Pore Water Pressures in The Vadose Zone Beneath a Composite-Lined Landfill - 20029

A finite-element model was developed to evaluate mechanisms contributing to positive pore pressures measured with sealed pressure transducers in the geological buffer beneath the Environmental Management Waste Management Facility, a composite-lined mixed waste disposal facility operated by the US Department of Energy. The geological buffer is a 3-m-thick engineered fine-textured layer directly beneath the Environmental Management Waste Management Facility's composite liner, and above the groundwater table. The model accounts for changes in pore water pressure resulting from (i) loading imposed by waste placed on the overlying liner, (ii) moistening of the geological buffer due to equilibration with the underlying geological materials, and (iii) fluctuations in the elevation of the underlying groundwater table. Pore water pressures predicted by the model are in good agreement with pore water pressures measured in the field. The predictions confirm that positive pore water pressures recorded by the sealed pressure transducers in the geological buffer are excess pore water pressures induced by the vertical normal stress imposed by waste placed on the liner, and are not due to a rise in the groundwater table. Simulations also showed that two additional years of filling would further increase the pore water pressure without any change in elevation of the groundwater table. The geological buffer remained unsaturated during the simulation, with a B-coefficient (parameter indicative of the degree of saturation) similar to that computed from the field-measured pore water pressures and waste filling records. Larger increases in pore water pressure were observed when the geological buffer was assumed to have higher initial saturation, as was observed in the field data. Incorporating seasonal fluctuations in the groundwater table beneath the geological buffer in the model resulted in predictions of small seasonal oscillation in the pore water pressure at the measurement location, similar to seasonal oscillations observed in the field. Predictions made with the model indicate that the dissipation of the excess pore water pressures will occur over decades due to the low hydraulic conductivity of the geological buffer material. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗