Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LICENSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel – Revision 1

Because there is currently no designated disposal site for used nuclear fuel in the United States, the nation faces the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation, and 2. A description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific.

Chopra, O. K.↗

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulatory Gap Analysis of Select NUREG-0800 Chapters for Applicability to Molten Salt Reactors

The past licensing approach for advanced reactors was based on adapting the current LWR-based NRC process that exists today to the advanced reactor concept. This is the approach used by advanced technologies such as the Pebble Bed Reactor licensing application, the Clinch River Breeder Reactor licensing application, and more recently the NuScale licensing application. Current Standard Review Plan (SRP) guidance for large LWRs is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: Light Water Reactor (LWR) Edition. However, the SRP is cumbersome to apply to liquid-fueled molten salt reactor (MSR) technologies. Therefore, a thoughtful licensing approach for MSRs is necessary.This report documents for DOE-NE an additional regulatory gap analysis of select chapters from the LWR SRP to further inform a generic nonpower MSR test program. Although the review process outlined in NUREG-0800 is LWR-specific, the plant functions and processes to be reviewed will be similar for the MSR. Therefore, a well-planned nonpower MSR test program can provide the performance data needed to better facilitate the eventual commercial-sized MSR review. The LWR SRP chapters dealing with the reactor, reactor coolant, engineered safety features, auxiliary systems, and waste management systems were reviewed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Behavioral Health/Employee Assistance Program (EAP) Report FY 15

The Sandia National Laboratories’ (SNL) Corporate Behavioral Health Program is a workplace based program that 1) assists in the early identification and resolution of personal concerns which may impact job performance, 2) assists managers and the organization in addressing productivity issues, and 3) supports the SNL commitment to provide a safe and healthful work environment. The program is offered to approximately 10,711 employees in New Mexico. The Behavioral Health Program is a corporate program combining services in NM and CA. It is integrated with other occupational health and clinical services including disability, disease management and preventive health programs. In addition, Sandia’s Behavioral Health Program interfaces with external organizations in Human Resources, the Department of Energy and Security through the Clinical Evaluation (CE) Human Reliability Program (HRP) and Workplace Violence programs. The program supports Sandia National Laboratories’ mission to safeguard national security, the environment, the public and is a proactive approach to early identification, intervention and assessment. Last, it reduces barriers to accessing mental health services and assists with reducing health care costs attributed to illness or injuries related to unhealthy lifestyles and behaviors. The EAP team is comprised of a professional staff including a licensed Clinical Psychologist who has a NM state license for psychotropic medication prescriptive authority, is board certified in Clinical Neuropsychology, and a Certified Employee Assistance Professional (CEAP), a licensed professional clinical counselor NM State Licensed (LPCC) and a licensed Marriage and Family counselor (MFT) who is also a Certified Employee Assistance Professional and who holds a doctorate in counseling psychology.

99 GENERAL AND MISCELLANEOUS↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Evaluation of Nondestructive Examination Responses from Chloride-Induced Stress Corrosion Cracks: Fabrication of Base Metal Test Specimens

This report documents efforts to create actual chloride-induced stress corrosion cracks (CISCCs) in stainless-steel specimens for evaluating application of nondestructive examination (NDE) technologies for detection and sizing of CISCC in stainless-steel canisters in dry storage systems (DSSs) for spent nuclear fuel. In the United States, several DSSs for commercial spent nuclear fuel are approaching the end of their initial licensed or certified term. Many of these systems were originally licensed or certified for 20 years, after which the licensing or certification may be renewed for periods up to 40 years, according to Title 10 of the Code of Federal Regulations (10 CFR), Part 72, “Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste.” Guidance for review of renewal applications is provided in NUREG-1927, Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance. A review of aging effects that could affect important-to-safety structures, systems, and components is required in renewal applications and applicants are required to address aging effects using either a time-limited aging analysis or an aging management program. The U.S. Nuclear Regulatory Commission (NRC) issued NUREG-2214, Managing Aging Processes In Storage (MAPS) Report, which provides guidance on the evaluation of known aging degradation mechanisms to determine if they could affect the ability of dry storage system components to fulfill their safety functions in the 20- to 60-year period of extended operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Risk Assessment of a Light-Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear power plant to the High-Temperature Electrolysis Facility (HTEF), and a smaller 100-MWt HTEF analysis. The results investigate the applicability of the potential licensing approaches, which do not require a full United States Nuclear Regulatory Commission licensing review. The PRAs are generic and include some assumptions. We eliminated many conservative assumptions from the preliminary pressurized-water reactor PRA report using design data for both the HES and HTEF. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 5.6%. The PRA results for core damage frequency and large early release frequency support the use of RG 1.174 as further risk information that supports a change without a full licensing amendment review. Further insights provided through hazard analyses and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and an HTEF sited 1.0 km from the nuclear power plant is strong and that the placement of a HTEF at 0.5 km is also a viable case. Site-specific information can alter these conclusions.

08 HYDROGEN↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

SSR COST – COmposite Structural Technologies for advanced reactor deployment (Final Scientific/Technical Report)

Moltex is designing a Generation 4 or Advanced nuclear reactor, the molten salt fast spectrum SSR-W. The design intent is to reduce the cost and complexity of the nuclear systems by relying on inherent safety characteristics, instead of engineered systems. One such characteristic as a natural tendency for power to decrease as temperature increases. Another characteristic that improves natural safety is the fact that the working fluids (molten salts) are at atmospheric pressure at operating temperatures. This significantly reduces the need for pressure boundary components and systems. Moltex is highly motivated to develop simple and economic reactors to reduce the carbon intensity and improve energy security of global electricity production. The COST project investigated the opportunities for reducing construction cost of advanced reactors with the adoption of Rigid Elastic Composite Civil works (RECC). The construction design and methods used in currently operational light water power plants would generally be suboptimal for the SSR-W since there is no requirement for civil structures to withstand high pressure accidents such as hydrogen combustion or steam explosion. In parallel to downselecting the most promising RECC-type technology, accident scenarios representing the largest credible challenge to the SSR-W civil and construction design were modelled. The capability of an SSR-W reactor constructed with and without the selected construction technology was evaluated and the consequential licensing challenges identified. A construction schedule and cost estimate of the SSR-W with and without the selected RECC construction technology was developed. Once the above data was collected, then Moltex was able to review the safety performance, license-ability and cost/schedule benefit of applying the preferred construction technology. The CAPEX/NPV benefit was quantified, and the licensing risks and opportunities were documented. Finally, the CAPEX/NPV benefit of the advanced construction technology was modest due to the suitability of traditional stick-built construction for the SSR-W design. However, previously unidentified benefits of the advanced construction technology were revealed during the studies that could credibly de-risk certain aspects of the design to be licensed. Since licensing (duration and delays) are very significant in new build project costs, the cost benefits may be significant. Further studies on the risk reduction of the construction technology are foreseen.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Review of Yucca Mountain Disposal Criticality Studies

The U.S. Department of Energy (DOE), Office of Civilian Radioactive Waste Management, submitted a license application for construction authorization of a deep geologic repository at Yucca Mountain, Nevada, in June of 2008. The license application is currently under review by the U.S. Nuclear Regulatory Commission. However,on March 3, 2010 the DOE filed a motion requesting withdrawal of the license application. With the withdrawal request and the development of the Blue Ribbon Commission to seek alternative strategies for disposing of spent fuel, the status of the proposed repository at Yucca Mountain is uncertain. What is certain is that spent nuclear fuel (SNF) will continue to be generated and some long-lived components of the SNF will eventually need a disposition path(s). Strategies for the back end of the fuel cycle will continue to be developed and need to include the insights from the experience gained during the development of the Yucca Mountain license application. Detailed studies were performed and considerable progress was made in many key areas in terms of increased understanding of relevant phenomena and issues regarding geologic disposal of SNF. This paper reviews selected technical studies performed in support of the disposal criticality analysis licensing basis and the use of burnup credit. Topics include assembly misload analysis, isotopic and criticality validation, commercial reactor critical analyses, loading curves, alternative waste package and criticality control studies, radial burnup data and effects, and implementation of a conservative application model in the criticality probabilistic evaluation as well as other information that is applicable to operations regarding spent fuel outside the reactor. This paper summarizes the work and significant accomplishments in these areas and provides a resource for future, related activities.

Scaglione, John M↗

History and Status of DOE’s Standardized Canister

[Poster] The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) currently in its possession, as well as SNF that will come into its possession in the future. DOE will rely upon the standardized canister to confine radionuclides and precluding the moderator in order to ensure safe, long-term management and disposition of SNF in its possession. This strategy helps minimize characterization costs (i.e., funds and exposure) and other technical challenges associated with the traditional approach of relying on fuel-specific properties to demonstrate compliance with the regulator. The use of the standardized canister offers the following benefits: • The standardized canister design is complete. It has been tested under a variety of drop and accident scenarios and was subsequently licensed under 10 CFR 72 as a storage system as part of the Foster Wheeler Environmental Corporation (FWENC) Facility. It is also part of the license submittal for Yucca Mountain. • There is high confidence that the standardized canister design can be stored within commercially-available storage casks and licensed as part of a transportation-system package. • A robust standardized canister simplifies accident analyses and does not rely on characterization of the contained waste. This simplifies safety analysis, provides a greater level of confidence with stakeholders and reduces cost and risk. • A common design for the associated packaging, closure, and loadout facilities results in significant savings. • The DOE standardized canister would simplify design efforts, procurement, and fabrication. • Standardizing handling activities and associated training, procedures, equipment, and tooling leads to enhanced safety and surety of operations. The standardized canister is the preferred package for these materials. It withstood scrutiny by the Yucca Mountain Repository License Application, the Nuclear Regulatory Commission’s (NRC) Advisory Committee on Nuclear Waste, the Nuclear Waste Technical Review Board, an American Society of Mechanical Engineers peer review, and the FWENC storage license application. This evaluation summarizes and documents the status of the design and rationale for the DOE standardized canister, and outlines remaining needs before deployment. In addition, it discusses the factors that have the potential to influence storage, transportation, and disposal of DOE SNF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Status of DOE’s Standardized Canister – 19657

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. The DOE standardized canister will be relied upon to confine radionuclides and preclude moderator in order to ensure safe, long-term management and disposition of DOE SNF. This strategy offers an avenue for avoiding the characterization costs (i.e. funds and exposure) and other technical challenges associated with the traditional approach of relying on fuel-specific properties as the basis for demonstrating compliance with the regulator. The use of the standardized canister offers the following benefits: • The standardized canister design is complete. It has been tested under a variety of drop and accident scenarios and was subsequently licensed under 10 CFR 72 as a storage system as part of the FWENC Facility. It is also part of the license submittal for Yucca Mountain. • There is high confidence that the standardized canister design can be stored within commercially available storage casks and licensed as part of a transportation-system package. • The robustness of the standardized canister simplifies accident analyses and does not rely on characterization of the contained waste. This simplifies safety analysis, provides a greater level of confidence with stake holders and reduces cost and risk. • Significant savings result from a common design for the associated packaging, closure, and loadout facilities. • Design efforts, procurement, and fabrication are simplified • Safety and surety of operations are enhanced by standardizing handling activities and associated training, procedures, equipment, and tooling. The standardized canister is the preferred package for these materials and has withstood scrutiny by the Yucca Mountain Repository License Application, the NRC’s Advisory Committee on Nuclear Waste, the Nuclear Waste Technical Review Board, an American Society of Mechanical Engineers peer review, and the Foster Wheeler Environmental Corporation storage license application. This evaluation summarizes and documents the status of the design and rationale for the DOE standardized canister and outlines the remaining needs to allow deployment. In addition, it discusses the factors that have the potential to influence storage, transportation, and disposal of DOE SNF.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Perspective of Dry Interim Storage of spent nuclear fuel (SNF) in Germany - 16504

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection (BfS). In 1995 a license to store spent nuclear fuel (SNF) and vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2035. During the last two years in Germany preparatory consultations to restart the process towards finding a repository took place, organised by a commission. This commission consists out of members of the scientific community, religious parties, social communities and environmental organizations as well as members of federal states governments and members of the German parliament (Bundestag). Recently the commission decided to extend its working period until summer 2016. Taking this background into account the BfS plans to intensify its research into extended interim storage with respect to potential material degradation leading to interference with safety functions (e.g. neutron shielding material). This includes topics like ageing of gasket materials which are already studied in ongoing experiments (e.g. at the Federal Institute for Materials Research and Testing) as well as studies of long term relaxation processes. Because of the need for transportation towards a repository another important field is the behaviour of the inventory under mechanical loads. For SNF, first calculations showed that because of the lower decay heat load after 60 years due to hydride reorientation the cladding might become much less ductile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repository performance confirmation.

Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Water Reactor Sustainability Research and Development Program Plan -- Fiscal Year 2009–2013

Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R&D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R&D programs. The purpose of the LWRS R&D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R&D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its international engagement and leadership on nuclear safety and security issues.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Construction of the Konrad Repository - Status and Perspective - 13034

Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION

The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated “generic” programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactor’s license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs), requiring significant dialogs between the Licensee and the USNRC. These discussions are part of the licensing basis and as such are documented with up to multi-hundred page responses that are loosely coupled through the USNRC Agency-wide Document Access and Management System (ADAMS), which serves as an electronic records repository for the USNRC . These discussions have supported revisions to the GALL, including the revision that is being prepared as this paper is being written. The USNRC has sought the help of the Pacific Northwest National Laboratory to improve the staff’s ability to navigate the significant numbers of documents that are generated in this process and to provide a forum for regulators, licensees and researchers to share knowledge in the efforts to improve the cyclic process for defining, applying, validating and re-defining AMPs. Work to date in this area is publicly accessible and this paper will describe that work and outline a potential path forward. The presenter will also demonstrate the capabilities of the PMMD information tools (http://pmmd.pnl.gov).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Off-label use of medical products in radiation therapy: Summary of the Report of AAPM Task Group No. 121

Medical products (devices, drugs, or biologics) contain information in their labeling regarding the manner in which the manufacturer has determined that the products can be used in a safe and effective manner. The Food and Drug Administration (FDA) approves medical products for use for these specific indications which are part of the medical product's labeling. When medical products are used in a manner not specified in the labeling, it is commonly referred to as off-label use. The practice of medicine allows for this off-label use to treat individual patients, but the ethical and legal implications for such unapproved use can be confusing. Although the responsibility and, ultimately, the liability for off-label use often rests with the prescribing physician, medical physicists and others are also responsible for the safe and proper use of the medical products. When these products are used for purposes other than which they were approved, it is important for medical physicists to understand their responsibilities. In the United States, medical products can only be marketed if officially cleared, approved, or licensed by the FDA; they can be used if they are not subject to or specifically exempt from FDA regulations, or if they are being used in research with the appropriate regulatory safeguards. Medical devices are either cleared or approved by FDA's Center for Devices and Radiological Health. Drugs are approved by FDA's Center for Drug Evaluation and Research, and biological products such as vaccines or blood are licensed under a biologics license agreement by FDA's Center for Biologics Evaluation and Research. For the purpose of this report, the process by which the FDA eventually clears, approves, or licenses such products for marketing in the United States will be referred to as approval. This report summarizes the various ways medical products, primarily medical devices, can legally be brought to market in the United States, and includes a discussion of the approval process, along with manufacturers' responsibilities, labeling, marketing and promotion, and off-label use. This is an educational and descriptive report and does not contain prescriptive recommendations. This report addresses the role of the medical physicist in clinical situations involving off-label use. Case studies in radiation therapy are presented. Any mention of commercial products is for identification only; it does not imply recommendations or endorsements of any of the authors or the AAPM. The full report, containing extensive background on off-label use with several appendices, is available on the AAPM website (http://www.aapm.org/pubs/reports/).

62 RADIOLOGY AND NUCLEAR MEDICINE↗