Demolitions of the Savannah River Site's concentrator and finishing facilities
The Savannah River Site (SRS) has produced Special Nuclear Materials (SNMs) starting in the early 1950's to the mid 1970's for the Atomic Energy Commission (AEC) and from the mid 1970's to the present for the Department of Energy (DOE). In that time, over 1,000 facilities have been built in the sixteen operational areas of the eight hundred square kilometer site. Over the years, many of the facilities have been dispositioned by the DOE as inactive. In FY-03, DOE identified two hundred and forty-seven (inactive or soon to be inactive) facilities that required demolition. Demolition work was scheduled to start in FY-04 and be completed in the first quarter of FY-07. Two-hundred and thirty-nine of these facilities have been demolished employing Routine demolition techniques. This presentation reviews and discusses two of the eight Non-Routine demolitions Facilities, 420-D 'The Concentrator Facility', and 421-D 'The Finishing Facility'. Facilities 420-D and 421-D were toppled by attaching rigging from the structural steel building frame to bulldozers and toppling the facilities over. The greatest advantage of this method is that it employs equipment that is on hand at SRS, saving time on locating and leasing offsite equipment as well as operator training. In addition, although the toppled structure does not land in the original facilities footprint, it does land in a contained area that is easily barricaded to prevent access during the operation. There are several disadvantages. First, there must be adequate area for the structure to topple into. Also if the wire rope size required to topple the structure is larger than two in., the ropes become extremely difficult to work with. Lastly, the yield strength of steel members is guaranteed by the manufacturer as a minimum strength, so its ultimate strength is unknown. This requires extremely conservative specifications sizing the bulldozers and any rigging equipment employed. Two hundred and forty-seven facilities have been successfully demolished at SRS utilizing five different demolition techniques. The routine method employed on the vast majority of facilities has been extremely successful and should be applied whenever possible. Because of their height, the 420-D and 421-D facilities required developing a new (to SRS) demolition method. This technique of toppling the structures with a bulldozer and implementing additional safety measures provided a successful, safe, and cost efficient demolition method. This method should be employed in the future on any steel or wood framed structures that are over forty ft. high that have ample space around them.