Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration Sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Integrating Biomass Conversion Technologies with Recovery Operations In-Woods: Modeling Supply Chain

Economic potential of feedstock generated low-valued forest residue can be enhanced by emerging biomass conversion technologies (BCT), such as torrefaction, briquetting, and gasification. However, for implementing these emerging processes within the woods, several hurdles are to be overcome, among which a balanced supply chain is pivotal. Centralized biomass recovery operation (CBRO) could be an economically viable solution in accessing harvesting sites and allows integration of BCT into forest management. The goal of this study was to examine the logistic effects of integrating a BCT into a CBRO, under different in-wood scenarios based on variations in travel time between the facility locations, amount of raw materials handled, intermediate storage capacity, and duration (number of days) of annual operations. Specific objectives included analyzing the effects of forest residue recoverability (BDMT, bone dry metric ton/ha), total transportation time from the harvest unit to the market, and the annual number of in-woods production sites on the overall efficiency of the BCT operations. Concurrently, this study examined the forest managerial impacts due to such an integration. Location-allocation tool (maximize market share problem type) within the ArcGIS Network Analyst platform was utilized to model the scenarios and generate one-way travel times from the harvest site to final markets. Results from geospatial analysis showed that there were 89–159 and 64–136 suitable locations for the BCT for logistics model (LM) I and II, respectively. Total one-way travel time for all the models ranged between 1.0–1.7 h. Additionally, the annual numbers of BCT sites was inversely proportional to the total one-way travel time (i.e., harvest unit to market). Arranging CBRO and BCT operations to occur at the same in-woods site returned shorter total and average travel times than arranging the two activities at separate in-woods sites. The model developed for this study can be used by forest managers and entrepreneurs to identify sites for placing BCTs in the forest that minimizes transportation times.

Paulson, Jeffrey↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Helper-embedded satellites from an integrase clade that repeatedly targets prophage late genes

Abstract Satellites such as phage-induced chromosomal islands (PICIs) are mobile genetic elements relying on helper phages for their mobilization, through trans-regulatory interactions. We discovered a PICI with a more intimate cis-regulatory configuration, integrated within a late gene of its helper prophage. This helper-embedded PICI (HE-PICI) configuration delays expression of the interrupted helper late gene until the satellite excises and provides passive helper-driven components to both HE-PICI replication and late transcription. Upon induction of a helper-satellite composite, precise excision of the entire composite was observed, followed by composite replication, then satellite excision. We mapped 491 additional HE-PICIs to one of 14 sites in cognates of phage lambda late genes. Associated integrases form a single phylogenetic clade with subclades respecting the 14 site groups, exhibiting repeated tropism for prophage late genes as new integration sites evolve. Four ordered zones in a general gram-negative PICI genome organization are: an integration zone encoding integrase and AlpA, a dynamic zone encoding members of the Bro-N network of domain-swapping DNA-interactive proteins and immunity repressor RNAs, a replication zone, and a dynamic late zone in which clusters as large as 17 consecutive helper prophage late genes have been captured. Helper-embedded satellites present new dimensions in satellite/helper relationships.

Tommasini, Dario↗

Impact of zeolite aging in hot liquid water on activity for acid-catalyzed dehydration of alcohols

The catalytic performance of zeolite in aqueous medium depends on a multitude of factors, such as the concentration and distribution of active sites and framework integrity. Al K–edge extended X–ray absorption fine structure and 27Al MAS NMR spectroscopies in combination with DFT calculations are used to determine the distribution of tetrahedral Al sites both qualitatively and quantitatively for both parent and 48 h 160 ºC water treated HBEA catalysts. There is no evidence of Al coordination modification after aging in water. The distribution and concentration of Al T–sites, active centers for the dehydration of cyclohexanol, do not markedly impact the catalytic performance in water, because the Brønsted acidic protons are present in the form of hydrated hydronium ions and thus have very similar acid properties. The results suggest that all Brønsted acid sites are equally active in aqueous medium. The decrease of zeolite catalytic performance after water treatment is attributed to the reduced concentration of Brønsted acid sites. Increasing the stability of pore walls and decreasing the rate of Si–O–Si group hydrolysis may result in improved apparent zeolite catalytic performance in aqueous medium. Authors thank B. W. Arey (PNNL) for HIM measurements, T. Huthwelker for support during Al XAFS measurements at the Swiss Light Source (PSI, Switzerland), J. Z. Hu and S. D. Burton (PNNL) for support during NMR experiments. This work was supported by the U. S. Department of Energy (DOE), Office of Science, Office of Basic Energy Sciences, Division of Chemical Sciences, Geosciences & Biosciences. MD acknowledges support by the Materials Synthesis and Simulation Across Scales (MS3 Initiative) conducted under Laboratory Directed Research & Development Program at PNNL. HIM imaging and NMR experiments were performed at the Environmental Molecular Sciences Laboratory, a national scientific user facility sponsored by the DOE Office of Science, Office of Biological and Environmental Research, located at Pacific Northwest National Laboratory (PNNL). PNNL is a multiprogram national laboratory operated for the DOE by Battelle Memorial Institute under contract # DE-AC05-76RL0-1830

alcohol dehydration↗

Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086

Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

54 ENVIRONMENTAL SCIENCES↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

JPL Contamination Control Engineering

JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

Molecular Contamination Spectral Effects (MCSE) Ch↗

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Detection of Sleeping Beauty transposition in the genome of host cells by non-radioactive Southern blot analysis

The Sleeping Beauty transposon (SB-Tn) system is being used widely as a DNA vector for the delivery of therapeutic transgenes, as well as a tool for the insertional mutagenesis in animal models. In order to accurately assess the insertional potential and properties related to the integration of SB it is essential to determine the copy number of SB-Tn in the host genome. Recently developed SB100X transposase has demonstrated an integration rate that was much higher than the original SB10 and that of other versions of hyperactive SB transposases, such as HSB3 or HSB17. In this study, we have constructed a series of SB vectors carrying either a DsRed or a human β-globin transgene that was encompassed by cHS4 insulator elements, and containing the SB100X transposase gene outside the SB-Tn unit within the same vector in cis configuration. These SB-Tn constructs were introduced into the K-562 erythroid cell line, and their presence in the genomes of host cells was analyzed by Southern blot analysis using non-radioactive probes. Many copies of SB-Tn insertions were detected in host cells regardless of transgene sequences or the presence of cHS4 insulator elements. Interestingly, the size difference of 2.4 kb between insulated SB and non-insulated controls did not reflect the proportional difference in copy numbers of inserted SB-Tns. We then attempted methylation-sensitive Southern blots to assess the potential influence of cHS4 insulator elements on the epigenetic modification of SB-Tn. Our results indicated that SB100X was able to integrate at multiple sites with the number of SB-Tn copies larger than 6 kb in size. In addition, the non-radioactive Southern blot protocols developed here will be useful to detect integrated SB-Tn copies in any mammalian cell type.

60 APPLIED LIFE SCIENCES↗

Regulatory Decision-Making Process Using 'Weight of Evidence: An Evidence Integration Approach' by the State of Washington at the Hanford Site - 20163

Performance Assessment and Environmental Impact Statement Modeling, Human and Ecological Risk Assessments are the tools used by the Washington State Department of Ecology (Ecology) to make regulatory decisions for permitting and cleanup. These efforts all inherently have large amounts of uncertainty no matter how many alternative approaches are attempted. Professional feedback from tribal governments, stakeholders, federal and state regulators, the public and independent peer review groups are taken into account in this process of informed decision making. The process also includes full evaluation of the comments and the associated reviews made by the various peer review groups such as the Low -Level Waste Disposal Facility Federal Review Group (DOE order 435.1) and the Nuclear Regulatory Commission (NRC). The evolution of technology has produced quicker and more efficient fate and transport modeling tools with related quantification of uncertainties and their significance. Groundwater and vadose zone models have been expanded across the entire Hanford site. Many of the technical approaches identified in the Washington State Regulations are updated using current knowledge to better understand the complexities of the Hanford Site using the latest state of the art tools for risk assessment and modeling. More emphasis and time are directed on defining uncertainty and then managing the uncertainty. One added tool is to run sensitivity cases based on informed decision making. The weight of evidence approach considers all relevant information in an integrative assessment that takes into account the kinds of evidence available, the quality and quantity, the uncertainty and error associated with each type, and how they fit together. Evidence of integration involves looking at systematic reviews and evaluating their strengths and weaknesses. In conclusion, Ecology, Washington State's lead regulatory agency at the Hanford site, has had to modify its site closure approach compared to the rest of the state. A more holistic approach dealing with the Hanford site as an integrated system has evolved leading to a defensible informed approach for regulatory closure decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

[X-33 Launch and Landing Facilities]

Sverdrup is responsible for the design, construction and activation of the X-33 Flight Operations Center at Edwards Air Force Base and for providing assistance in activating the X-33 Landing Sites. The past year has seen the completion of the construction of the X-33 Flight Operations Center. Construction was completed in December of 1998, with systems checkout and testing continuing into early 1999. Integration of the site with LMCMS and other partner-supplied systems began in December and will continue through rollout of the X-33 vehicle. The construction of the X-33 Launch Complex has been performed within the Edwards AFB and Air Force Research Laboratory (AFRL) systems with no substantial interference to either parties. A high level of cooperation exists between Sverdrup, Edwards AFB, and the Air Force Research Laboratory in the areas of access, training, security, and operations. There have been no conflicts between programs that have not been accommodated. Development of the landing sites is progressing with many of the modifications necessary underway. GSE commitments are in place. The personnel training program developed by Sverdrup for persons entering the launch site construction areas, was modified by Lockheed for use in training and access control to the Center during flight operations to maximize safety and minimize intrusion upon the environment. Close cooperation between Sverdrup, the construction workers, and the environmental biologist permitted construction to proceed in a timely fashion without harm to the wildlife, in particular, the Desert Tortoise. Although the entire X-33 site encompasses approximately 50 acres including a new access road, only the areas directly impacted by the construction were cleared to minimize the impact on the environment. A total of about 30 acres was actually disturbed.

Source record↗

Salient Characteristics for Terrestrial Analog Engineering Test Sites

The use of terrestrial analog sites is an essential component of the development process for systems that are planned for lunar and planetary surfaces. These sites can also be valuable for training personnel who are expected to operate those systems. The fact that the site is an integral element, capable of influencing data and impacting test results, must not be overlooked. For tests performed in analog environments to be truly valid it is essential that the relevant characteristics of the employed sites be thoroughly understood. It is also critical that a comparative evaluation be made to assess the similarity of the analog sites to target planetary sites. Examples of relevant characteristics include terrain, soil properties, meteorology, geologic features, biological history, and remoteness. The importance of each of the characteristics varies with the type of extraterrestrial activity to be conducted. As a result, a site that is ideal for one purpose may be totally inadequate for another. It may also be appropriate to utilize multiple sites of increasing fidelity as the development process evolves. For example, early in the development process, the use of lower-fidelity sites may be elected - especially if they are available for a lower cost. Later, it may be necessary to employ higher-fidelity sites to capture greater realism, even if there is an associated increased cost. Finally, when interpreting the results of field tests, it is necessary to understand the sensitivity of the results to the relevant conditions. Knowledge of characteristics and sensitivity of results is particularly important when using field test results to validate analytical model predictions. This is especially true for activities that involve physical interaction with the site. Examples would include tests of rovers or other vehicles and associated trafficability modeling, spacesuit mobility tests, and tests associated with system deployment operations.

Watson, J.K.↗

Emergence of Integrated Urology-Radiation Oncology Practices in the State of Texas

Purpose: Integrated urology-radiation oncology (RO) practices have been advocated as a means to improve community-based prostate cancer care by joining urologic and radiation care in a single-practice environment. However, little is known regarding the scope and actual physical integration of such practices. We sought to characterize the emergence of such practices in Texas, their extent of physical integration, and their potential effect on patient travel times for radiation therapy. Methods and Materials: A telephone survey identified integrated urology-RO practices, defined as practices owned by urologists that offer RO services. Geographic information software was used to determine the proximity of integrated urology-RO clinic sites with respect to the state's population. We calculated patient travel time and distance from each integrated urology-RO clinic offering urologic services to the RO treatment facility owned by the integrated practice and to the nearest nonintegrated (independent) RO facility. We compared these times and distances using the Wilcoxon-Mann-Whitney test. Results: Of 229 urology practices identified, 12 (5%) offered integrated RO services, and 182 (28%) of 640 Texas urologists worked in such practices. Approximately 53% of the state population resides within 10 miles of an integrated urology-RO clinic site. Patients with a diagnosis of prostate cancer at an integrated urology-RO clinic site travel a mean of 19.7 miles (26.1 min) from the clinic to reach the RO facility owned by the integrated urology-RO practice vs 5.9 miles (9.2 min) to reach the nearest nonintegrated RO facility (P<.001). Conclusions: Integrated urology-RO practices are common in Texas and are generally clustered in urban areas. In most integrated practices, the urology clinics and the integrated RO facilities are not at the same location, and driving times and distances from the clinic to the integrated RO facility exceed those from the clinic to the nearest nonintegrated RO facility.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Tuning Photovoltaic Performance of Perovskite Nickelates Heterostructures by Changing the A-Site Rare-Earth Element

Perovskite rare-earth nickelates (RNiO3) have attracted much attention because of their exotic physical properties and rich potential applications. Here, we report systematic tuning of the electronic structures of RNiO3 (R=Nd, Sm, Gd, and Lu) by isovalent A-site substitution. By integrating RNiO3 thin films with Nb-doped SrTiO3 (NSTO), p-n heterojunction photovoltaic cells have been prepared and their performance has been investigated. The open-circuit voltage increases monotonically with decreasing A-site cation radius of RNiO3. This change results in a downward shift of the Fermi level and induces the increase in the built-in potential at the RNiO3/NSTO heterojunction, with LuNiO3/NSTO showing the largest open-circuit voltage. At the same time, the short-circuit current initially increases upon changing the A-site element from Nd to Sm. However, the larger bandgaps of GdNiO3 and LuNiO3 reduces light absorption which in turn induces a decrease in the short-circuit current. A power conversion efficiency of 1.13% has been achieved by inserting an ultrathin insulating SrTiO3 layer at the SmNiO3/NSTO interface. Our study illustrates how changing the A-site cation is an effective strategy for tuning photovoltaic performance and increasing the applicability of nickelates in optoelectric devices.

Nickelates, Oxygen vacancy, photovoltaics, p-n het↗

Integrable nonunitary quantum circuits

Here we show that the integrable Lindblad superoperators found recently can be used to build integrable nonunitary quantum circuits with two-site gates by demonstrating that the R(SIC) matrices are completely positive and trace preserving. Using the bond-site transformation, we obtain the corresponding integrable nonunitary quantum circuits with three-site gates. When restricted to the diagonals of the density matrix, these quantum models reduce to integrable classical cellular automata. This approach may pave the way for a systematic construction of circuits.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SITE project. Phase 1: Continuous data bit-error-rate testing

The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

Fujikawa, Gene↗

Real Time Nitrogen Monitoring and Quality Control System for NASA Astromaterials Collection

The Nitrogen system is a vital utility supporting the curation office within NASA's Astromaterials Re-search and Exploration Science (ARES) Division at the Johnson Space center (JSC). Since the Apollo samples were returned in 1969. It has played an essential role in preserving NASA’s astromaterial collections (now nine collections) by maintaining contamination-free, controlled environments required for long term curation and advanced scientific research. To meet the stringent purity requirements for contamination control, high purity modified Grade C Liquid Nitrogen (LN2) is delivered weekly by an industrial gas vendor to a 15,000-gallon tank located outside at NASA JSC near the ARES facility. This nitrogen is vital for creating an inert atmosphere to store the collection in, ensuring they are continuously shielded from contaminants and alterations through a constant N2purge. For most of the past 65 years deliveries of LN2 have required a CoA (Certificate of Analysis) prior to delivery. If those were not available, then LN2 deliver were sent to third-party laboratories for verification, creating an operational bottleneck and quality gap. To address this challenge and maintain rigorous quality control, NASA JSC Infrastructure and Astromaterials Acquisition & Curation Office initiated the development of an on-site Analytical Gas Sampling (AGS) Laboratory. Designed to streamline quality verification if a CoA unavailable, the AGS lab was constructed by a subcontractor in Newton, NJ. After a successful factory acceptance test conducted by the NASA ARES Infrastructure team, the lab was trans-ported to NASA JSC, where it was anchored and integrated into the site’s nitrogen pressure system using stainless steel, oxygen-cleaned tubing. The ARES nitrogen system was modified to provide parallel flows to the AGS lab for quality control and to the astromaterials collection labs for maintaining an inert environment. The AGS lab features two operational modes: (1)Primary: Gaseous Nitrogen (GN2) Quality Monitoring –The AGS system continuously samples the site’s GN2 supply every 15 minutes to ensure compliance with required purity levels. (2) Secondary: LN2 Quality Verification when a comprehensive CoA is not available, a cryogenic vaporizer converts LN2 to GN2, which is then analyzed for impurities: H₂, Ar, O₂, CO, CO₂, H₂O, and total hydrocarbons (THC). By significantly enhancing on-site analytical capabilities, the AGS lab eliminates reliance on external testing, ensures uninterrupted quality monitoring of the nitrogen pressure system, and reinforces NASA’s commitment to preserving pristine astromaterials under the highest standards of curation and research integrity.

glove box↗