Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Inductance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Improving Longitudinal Impedance of Inductive Inserts

Space charge compensation is essential to keeping the beam inside a ring such as PSR in the desired bunch form. The space charges of the ring will lead to the beam debunching, and the most prominent form of compensation for this is the use of RF to bunch the ring back. It has long been known however, that the impedance presented to the beam by its space charge could be compensated by a passive component. Such a passive component has been in use in PSR since 2000, but upgrading it could greatly improve the capabilities of the PSR. Additionally, the inserts presently used would require updating to match any changes in the beam pipe, both mechanically and to increase the space charge compensation.

43 PARTICLE ACCELERATORS↗

Applications of Alternate Actinide Calibration on Inductively Coupled Plasma Mass Spectrometry Analysis of H-Canyon Highly Enriched Uranium Legacy Material at the Savannah River Site

Alternate Actinide Calibration is beneficial for calibration using lower activity standards • ICP-MS and ICP-OES are valid complementary methods for U analysis • Recently procured Agilent 8900 ICP-QQQ-MS in radiological buffer area –installation in progress • Helium (kinetic energy discrimination) can be used for reducing polyatomic interferences • Installing hydrogen and oxygen (reaction gases) on 8900 ICP-MS systems to improve LODs of several challenging analytes

Jones, Mark A.↗

GH Induction System 1B (BR-105) & MRF System 6 (BR-120) in B226

The purpose of the attached calculations and detail sketches is to document conformance with the requirements of DOE-STD-1020-2016 for the subject project. The calculations have been reviewed for technical accuracy, appropriate methodology, and completeness using the "Document Review Method." The reviewer confirms that the stated purpose has been met. This package does not constitute a construction permit. The enclosed calculations are valid for 2 years from signed date or expiration of listed code cycles, whichever occurs first. Licensed civil or structural engineer is to be contacted for calculations application following expiration of calculations package.

42 ENGINEERING↗