Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Guarded”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

311 records · Page 18

Ozone measurement systems improvements studies

Results are summarized of an initial study of techniques for measuring atmospheric ozone, carried out as the first phase of a program to improve ozone measurement techniques. The study concentrated on two measurement systems, the electro chemical cell (ECC) ozonesonde and the Dobson ozone spectrophotometer, and consisted of two tasks. The first task consisted of error modeling and system error analysis of the two measurement systems. Under the second task a Monte-Carlo model of the Dobson ozone measurement technique was developed and programmed for computer operation.

Thomas, R. W.↗

TERSSE. Definition of the total earth resources system for the shuttle era. Volume 10: (TOSS) TERSSE operational system study

Economic benefits studies regarding the application of remote sensing to resource management and the Total Earth Resources for the Shuttle Era (TERSSE) study to outline the structure and development of future systems are used, along with experience from LANDSAT and LACIE, to define the system performance and economics of an operational Earth Resources system. The system is to be based on current (LANDSAT follow-on) technology and its application to high priority resource management missions, such as global crop inventory. The TERSSE Operational System Study (TOSS) investigated system-level design alternatives using economic performance as the evaluation criterion. As such, the TOSS effort represented a significant step forward in the systems engineering and economic analysis of Earth Resources programs. By parametrically relating engineering design parameters, such as sensor performance details, to the economic benefit mechanisms a new level of confidence in the conclusions concerning the implementation of such systems can be reached.

Stow, W. K.↗

National geodetic satellite program, part 1

The major accomplishments of the GEOS-B, C-band systems project is assessed. The project objectives are given, namely: (1) primary objectives that must be met for project success; (2) secondary objectives that were sufficiently important to warrant serious consideration; and (3) other objectives that were important to the project and for which additional effort would be desirable. The primary objectives are presented and discussed in detail.

Belgin, J.↗