Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Nuclear Materials Process Modeling at the Y-12 National Security Complex

The Y-12 National Security Complex (Y-12) has implemented process modeling for various accountable nuclear materials operations that are performed throughout the plant. Using a discrete, event-based dynamic simulation program, key nuclear material streams are modeled, allowing Y-12 to effectively manage numerous points of interest within the plant’s production operations. Integration of the various material processes into a single, interdependent supply and demand model is one of the ongoing focuses within Y-12’s process modeling effort. The primary purpose of using dynamic simulation modeling is to allow for analysis of the nuclear materials inventories and forecasted supplies based on future demands. Analysis of these inventories includes capacity evaluation, bottleneck mitigation, and assessments of individual pieces of equipment to inform future facility investment decisions and associated project schedules. Modeling of the nuclear materials processes throughout the complex also allows for incorporation of changes relevant to production capabilities such as the upcoming transition of specific operations to the new Uranium Processing Facility. Prior to implementation of process modeling, Y-12 forecasted supply and demand of accountable nuclear materials streams using Microsoft Excel. With deterministic models such as Microsoft Excel, the annual forecasts, generated within data input condition parameters, can only provide a fixed point of data. Fixed data cannot simulate integrated material streams and account for the possibility of occurrences and other changes that dynamic simulations take into consideration. Y-12’s dynamic process modeling allows integrated simulations of multiple accountable nuclear materials processes, including supply and demand forecasting and analysis, and is a coordinated effort involving many steps of verification and validation (V&V), site briefings, testing, reporting, data mining, planning, and documentation that spans various programs throughout the Y-12 complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of the Bohunice V1 Reactor Coolant System - 20011

About 2.5 kilometers from the village of Jaslovske Bohunice in the Trnava District in western Slovakia at the Bohunice V1 nuclear power plant, Westinghouse and VUJE are working on the dismantling of two VVER-440 units. The consortium was awarded this contract in October 2017 from Jadrova a vyradovacia spolocnost (JAVYS) and has begun onsite work to dismantle the reactor coolant systems of both units that operated at the plant. The Bohunice V1 plant is composed of two V-230 type VVER 440 units (440 MWe each). The first unit ceased operation on December 31, 2006, and the second on December 31, 2008, after 28 years of operation. The project strategy relies on the early release of some plant areas to allow the erection of new facilities to enable a fast and safe dismantling. These up-front activities play a crucial role within the whole project. Since schedule and ALARA are two key elements to be considered, it has been decided to separate the dry cutting activities from the ones occurring underwater. Two Wet Cutting Workshops will allow the segmentation and packaging of the high activity components. To take advantage of the large space available in the turbine building, a Dry Cutting Workshop has been built for segmenting the twelve steam generators of both units. Two more Dry Cutting Workshops (one per unit) have been installed in the reactor building for the fragmentation of the remaining large components and auxiliary systems components. This paper describes all current preparatory works as well as the on-going segmentation and packaging activities. Interesting lessons learned are also provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating the demand response potential of ammonia plants

Demand-side management/demand response (DSM/DR) are key strategies for mitigating the inherent variability in electricity generation rates by renewable sources. This article represents—to our knowledge—the first foray into assessing the DR potential of ammonia plants. Ammonia plants are interesting candidates for DR initiatives because of their significant electricity use (for operating compressors driving the synthesis loop) and the ability to store the ammonia product relatively easily and safely. Our approach is based on formulating and solving an optimal DR scheduling problem for an ammonia plant while accounting for the process dynamics. To this end, we introduce a new Hammerstein–Wiener-inspired modeling framework based on injecting linear dynamics in a first-principles static nonlinear model of the process. The results are encouraging; for the cases considered, peak-time power consumption decreases between 3.57% and 7.40%, coupled with 1.39% to 3.70% reductions in operating cost.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Combining Generative Modeling and Advanced Control for Building Scenario Generation

Buildings make up a large portion of energy consumption in the U.S. today. Understanding their energy consumption patterns can improve their efficiency, but requires detailed models that rely on incomplete or unknown information. Previous work has shown that artificial intelligence (AI) can be used to predict missing information and even suggest upgrades to improve building efficiency. However, building upgrades may require undesirable upfront costs. Oppositely, advanced control could improve building efficiency with negligible upfront cost. To explore the tradeoffs between these two approaches, in this work we propose a workflow to compute optimal temperature setpoint schedules to minimize energy consumption and operational cost. Results show that modifying the temperature setpoints in a building using model predictive control (MPC) can effectively reduce its energy consumption and operational cost. This optimal operation cannot fully meet a desired goal. However, we show that by considering MPC in addition to component upgrades, a desired goal can be met with significantly less upfront costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Agent-based modeling to evaluate the effects of harvesting biomass and hunting on ring-necked pheasant ( Phasianus colchicus ) populations

As the US strives to divest from fossil fuels, dedicated energy crops have increased in popularity because of their potential to serve as a renewable source of transportation fuel and biomass-generated electricity. Whereas the impacts of crop agriculture on biodiversity have been well-documented, less is known about the potential impacts that growing bioenergy crops could have on wildlife. Here we look specifically at the ring-necked pheasant (Phasianus colchicus) and how pheasant populations may be influenced by growing and harvesting bioenergy crops. We explored effects of temporal harvest strategies at the field scale on biomass yield and pheasant population size. To investigate, we developed an agent-based model (ABM) that simulates ring-necked pheasants, tractors, hunters, and vegetation classes. One such vegetation class is land that is enrolled in a Conservation Reserve Program (CRP) plan specifically targeting pheasant conservation. Using this ABM, we assessed four different landscapes—corn-dominated, CRP-dominated, grassland-dominated, and mixed landscape—under strategies that varied the time of harvest. We also used ecological valuation to compare scenario outcomes from an economic perspective. We determined that biomass yield and pheasant population size were sensitive to harvesting times. Our scenarios totaled between ~$931,000 (minimum) and $3.8 million (maximum) over all landscapes, though on average harvesting in late spring generated the most value ($2.45 million) and harvesting in fall was a close second in terms of profitability ($2.39 million).

59 BASIC BIOLOGICAL SCIENCES↗

Valuing EV Managed Charging for Bulk Power Systems

When and where electric vehicle (EV) charging occurs has significant implications for power systems supporting widespread EV adoption, especially with high shares of wind and solar generation. This study extends previous works by leveraging detailed simulation models for EV adoption, EV use, EV charging, and bulk power system operations, and by linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This technical potential study focuses on how the value of EV managed charging (EVMC) changes depending on charging flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and managed charging participation rate. We show that naively aggregating EV charging flexibility from individual vehicles into megawatt-scale resources grossly overestimates the flexibility of the fleet, because such aggregate models can unrealistically pair, e.g., one already-fully-charged vehicle's ability to increase load with another already-charging vehicle's ability to accept more charge, effectively requesting a charging rate that is infeasible for the latter vehicle. We find per-vehicle bulk system value is highest at low participation rates for all dispatch mechanisms. Factoring in production cost savings, avoided firm capacity savings, and combustion-related power sector emissions savings, we estimate the value of EVMC at low participation rates (5%) to be $33/vehicle-year to $69/vehicle-yr for within-session charging flexibility and $40/vehicle-yr to $120/vehicle-yr for within-week charging flexibility in an envisioned 2038 New England power system and monetary value reported in 2016 U.S. dollars. At 100% participation, per-vehicle value declines to $25/vehicle-yr to $31/vehicle-yr for within-session charging flexibility and to $29/vehicle-yr to $36/vehicle-yr for within-week charging flexibility; however, 100% participation yields the highest total system savings.

ADVANCED PROPULSION SYSTEMS↗

Emulation and detection of physical faults and cyber-attacks on building energy systems through real-time hardware-in-the-loop experiments

The increasing use of remote or mobile access, integrated wearable technologies, data exchange, and cloud-based data analytics in modern smart buildings is steering the building industry towards open communication technologies. The increased connectivity and accessibility could lead to more cyber-attacks in smart buildings. On the other hand, physical faults (e.g., HVAC -heating, ventilation, and air-conditioning faults) may have similar adverse impacts as those from the cyber-attacks on building energy systems, such as occupant discomfort, energy wastage, and equipment downtime. However, current physical behavior-based anomaly detection methods fail to differentiate between cyber-attacks and physical faults in building energy systems. Moreover, the challenge in collecting real-world threat data with ground truth has led researchers to rely on numerical models with user-defined assumptions, which may not accurately reflect real-world conditions due to the lack of in-situ experimental datasets. To address these challenges and gaps, this paper presents a flexible hardware-in-the-loop (HIL) testbed for generating cyber-attack and physical fault datasets and demonstrating threat detection algorithms in a real building automation system (BAS) environment. This testbed combines hardware (i.e., real BAS with local HVAC controllers and a physical network) with software (i.e., high-fidelity models to represent behaviors of building envelope and HVAC energy systems), enabling emulations of realistic threats. Five HIL experiments, including one baseline without any threats, two with physical faults, and two with cyber-attacks, were conducted to generate datasets containing detailed network traffic and system states. A joint classification framework, incorporating a network analyzer and a physical HVAC fault detector, was proposed to automatically detect cyber-physical abnormalities on BAS at both the network and the physical HVAC levels. The network analyzer comprises a conditional random fields (CRF) based command validator and a statistics-based detection strategy. The fault detector employs a weather and schedule-based pattern matching and feature-based principal component analysis (WPM-FPCA) method. Evaluation of the classification using four metrics from the multi-class confusion matrix revealed an average accuracy of 90.2%, recall of 89.7%, precision of 88.5% and F1-score of 89.2%. Finally, these results demonstrate that the proposed joint classification framework can effectively differentiate between specific types of cyber-attacks (e.g., device reinitialization attack, network Denial-of-Service attack) and physical faults (e.g., air handling unit operational fault, cooling coil valve stuck) in real time for improved building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sampling Size Optimization for Bioburden Density Estimation in Planetary Protection

Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.

97 - MATHEMATICS AND COMPUTING↗

Extreme-scale stochastic optimization and simulation via learning-enhanced decomposition and parallelization (Final Technical Report)

Stochastic optimization and simulation models ubiquitously arise in designing and operating complex service/engineering systems. They can be extreme in scale due to high-dimensional data and decisions, and can also involve decisions made sequentially in response to newly revealed data, both causing significant computational challenge. The objective of this research is to explore a unified framework that integrates machine learning with discrete optimization and risk-averse modeling, to improve the efficiency of decomposition paradigms for stochastic optimization and simulations at extreme scale. The models we consider represent a broad class of complex decision-making problems, where 0-1 or continuous decisions are made before and/or after knowing multiple sources of uncertainties that could be correlated. We will employ machine learning methods to dynamically decide and prioritize computational procedures, including cut generation, branching, and bounding of the optimal objective. Furthermore, the research will shed new lights on the traditional decomposition algorithms for extreme-scale computing. Deliverables of the research include new modeling and computational methods for advancing the state-of-the-art research in optimization and simulation, bringing many relevant risk-averse, data-driven optimization problems in practice within the range of tractability. Examples include distributed computing server scheduling and sensor deployment for monitoring critical infrastructures. Success in this effort will enable progress in solving multiple extreme-scale problems in the complex system design and operations arising from DoE missions in energy, environment, and national security.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

Illinois Express Quantum Network (IEQNET): metropolitan-scale experimental quantum networking over deployed optical fiber

The Illinois Express Quantum Network (IEQNET) is a program to realize metro-scale quantum networking over deployed optical fiber using currently available technology. IEQNET consists of multiple sites that are geographically dispersed in the Chicago metropolitan area. Each site has one or more quantum nodes (Qnodes) representing the communication parties in a quantum network. Q-nodes generate or measure quantum signals such as entangled photons and communicate the results via standard, classical, means. The entangled photons in IEQNET nodes are generated at multiple wavelengths, and are selectively distributed to the desired users via optical switches. Here we describe the network architecture of IEQNET, including the Internet-inspired layered hierarchy that leverages software-defined-networking (SDN) technology to perform traditional wavelength routing and assignment between the Q-nodes. Specifically, SDN decouples the control and data planes, with the control plane being entirely classical. Issues associated with synchronization, calibration, network monitoring, and scheduling will be discussed. An important goal of IEQNET is demonstrating the extent to which the control plane can coexist with the data plane using the same fiber lines. This goal is furthered by the use of tunable narrow-band optical filtering at the receivers and, at least in some cases, a wide wavelength separation between the quantum and classical channels. We envision IEQNET to aid in developing robust and practical quantum networks by demonstrating metro-scale quantum communication tasks such as entanglement distribution and quantum-state teleportation.

Chung, Joaquin↗

Comparison of Routes of Administration, Frequency, and Duration of Favipiravir Treatment in Mouse and Guinea Pig Models of Ebola Virus Disease

Favipiravir is a ribonucleoside analogue that has been explored as a therapeutic for the treatment of Ebola Virus Disease (EVD). Promising data from rodent models has informed nonhuman primate trials, as well as evaluation in patients during the 2013–2016 West African EVD outbreak of favipiravir treatment. However, mixed results from these studies hindered regulatory approval of favipiravir for the indication of EVD. This study examined the influence of route of administration, duration of treatment, and treatment schedule of favipiravir in immune competent mouse and guinea pig models using rodent-adapted Zaire ebolavirus (EBOV). A dose of 300 mg/kg/day of favipiravir with an 8-day treatment was found to be fully effective at preventing lethal EVD-like disease in BALB/c mice regardless of route of administration (oral, intraperitoneal, or subcutaneous) or whether it was provided as a once-daily dose or a twice-daily split dose. Preclinical data generated in guinea pigs demonstrates that an 8-day treatment of 300 mg/kg/day of favipiravir reduces mortality following EBOV challenge regardless of route of treatment or duration of treatments for 8, 11, or 15 days. This work supports the future translational development of favipiravir as an EVD therapeutic.

60 APPLIED LIFE SCIENCES↗

Exploring Continuous Seismic Data at an Industry Facility Using Unsupervised Machine Learning

Seismic data recorded at industrial sites contain valuable information on anthropogenic activities. With advances in machine learning and computing power, new opportunities have emerged to explore the seismic wavefield in these complex environments. We applied two unsupervised machine learning algorithms to analyze continuous seismic data collected from an industrial facility in Texas, United States. The Uniform Manifold Approximation and Projection for Dimension Reduction algorithm was used to reduce the dimensionality of the data and generate 2D embeddings. Then, the Hierarchical Density-Based Spatial Clustering of Applications with Noise method was employed to automatically group these embeddings into distinct signal clusters. Our analysis of over 1400 hr (around 59 days) of continuous seismic data revealed five and seven signal clusters at two separate stations. At both stations, we identified clusters associated with background noise and vehicle traffic, with the latter’s temporal patterns aligning closely with the facility’s work schedule. Furthermore, the algorithms detected signal clusters from unknown sources and underline the ability of unsupervised machine learning for uncovering previously unrecognized patterns. Our analysis demonstrates the effectiveness of unsupervised approaches in examining continuous seismic data without requiring prior knowledge or pre-existing labels.

58 GEOSCIENCES↗

Evaluating Spatial Accelerator Architectures with Tiled Matrix-Matrix Multiplication

There is a growing interest in custom spatial accelerators for machine learning applications. These accelerators employ a spatial array of processing elements (PEs) interacting via custom buffer hierarchies and networks-on-chip. The efficiency of these accelerators comes from employing optimized dataflow (i.e., spatial/temporal partitioning of data across the PEs and fine-grained scheduling) strategies to optimize data reuse. The focus of this work is to evaluate these accelerator architectures using a tiled general matrix-matrix multiplication (GEMM) kernel. To do so, we develop a framework that finds optimized mappings (dataflow and tile sizes) for a tiled GEMM for a given spatial accelerator and workload combination, leveraging an analytical cost model for runtime and energy. Our evaluations over five spatial accelerators demonstrate that the tiled GEMM mappings systematically generated by our framework achieve high performance on various GEMM workloads and accelerators.

43 PARTICLE ACCELERATORS↗

Evaluating Spatial Accelerator Architectures with Tiled Matrix-Matrix Multiplication.

There is a growing interest in custom spatial accelerators for machine learning applications. These accelerators employ a spatial array of processing elements (PEs) interacting via custom buffer hierarchies and networks-on-chip. The efficiency of these accelerators comes from employing optimized dataflow (i.e., spatial/temporal partitioning of data across the PEs and fine-grained scheduling) strategies to optimize data reuse. The focus of this work is to evaluate these accelerator architectures using a tiled general matrix-matrix multiplication (GEMM) kernel. To do so, we develop a framework that finds optimized mappings (dataflow and tile sizes) for a tiled GEMM for a given spatial accelerator and workload combination, leveraging an analytical cost model for runtime and energy. Finally, our evaluations over five spatial accelerators demonstrate that the tiled GEMM mappings systematically generated by our framework achieve high performance on various GEMM workloads and accelerators.

42 ENGINEERING↗

Activation Analysis in Preparation for a Tungsten Irradiation Experiment at LANSCE

To organize the safe handling of activated material, knowing the residual dose rates is crucial. Here, in this work, we present the pre-experiment activation analysis for an experiment in which tungsten blocks are irradiated by 800-MeV protons. In this analysis, we use the Monte Carlo N-Particle (MCNP) code for radiation transport, Attila4MC for unstructured mesh generation, and Activation in Accelerator Radiation Environments (AARE), including CINDER2008, for activation analysis. If the tungsten blocks must be removed within a day after the experiment, then exposure to personnel entering the room must be reduced. One exposure-reduction strategy is to add carbon steel shielding around the tungsten blocks, efficiently reducing the dose from the activated tungsten. However, the shielding becomes activated itself during irradiation: 56Mn is the dominant contributor for short decay times. The actual schedule at the time of the experiment allowed sufficient cool-off time for the tungsten in the room so that additional shielding was not necessary. A less rigorous comparison of the calculated values with the post-experiment measurements showed reasonable agreement.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗