Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Preliminary design of a universal Martian lander

In the next 25 years, mankind will be undertaking yet another giant leap forward in the exploration of the solar system: a manned mission to Mars. This journey will provide important information on the composition and history of both Mars and the Solar System. A manned mission will also provide the opportunity to study how humans can adapt to long term space flight conditions and the Martian environment. As part of the NASA/USRA program, nineteen West Virginia University students conducted a preliminary design of a manned Universal Martian Lander (UML). The UML's design will provide a 'universal' platform, consisting of four modules for living and laboratory experiments and a liquid-fuel propelled Manned Ascent Return Vehicle (MARV). The distinguishing feature of the UML is the 'universal' design of the modules which can be connected to form a network of laboratories and living quarters for future missions thereby reducing development and production costs. The WVU design considers descent to Mars from polar orbit, a six month surface stay, and ascent for rendezvous. The design begins with an unmanned UML landing at Elysium Mons followed by the manned UML landing nearby. During the six month surface stay, the eight modules will be assembled to form a Martian base where scientific experiments will be performed. The mission will also incorporate hydroponic plant growth into a Controlled Ecological Life Support System (CELSS) for water recycling, food production, and to counteract psychological effects of living on Mars. In situ fuel production for the MARV will be produced from gases in the Martian atmosphere. Following surface operations, the eight member crew will use the MARV to return to the Martian Transfer Vehicle (MTV) for the journey home to Earth.

Norman, Timothy L.↗

The Preliminary Design of a Universal Martian Lander

As part of the NASA/USRA program, nineteen West Virginia University students conducted a preliminary design of a manned Universal Martian Lander (UML). The WVU design considers descent to Mars from polar orbit, a six month surface stay, and ascent for rendezvous. The design begins with an unmanned UML landing at Elysium Mons followed by the manned UML landing nearby. During the six month surface stay, the eight modules are assembled to form a Martian base where scientific experiments are performed. The mission also incorporates hydroponic plant growth into a Controlled Ecological Life Support System (CELSS) for water recycling, food production, and to counteract psycho-logical effects of living on Mars. In situ fuel production for the Martian Ascent and Rendezvous Vehicle (MARV) is produced From gases in the Martian atmosphere. Following surface operations, the eight member crew uses the MARV to return to the Martian Transfer Vehicle (MTV) for the journey home to Earth.

Norman, Timothy L.↗

System technology analysis of aeroassisted orbital transfer vehicles - Moderate lift/drag

The utilization of procedures involving aerodynamic braking and/or aerodynamic maneuvering on return from higher altitude orbits to low-earth orbit makes it possible to realize significant performance benefits. The present study is concerned with a number of mission scenarios for Aeroassisted Orbital Transfer Vehicles (AOTV) and the impact of potential technology advances in the performance enhancement of the class of AOTV's having a hypersonic lift to drag ratio (L/D) of 0.75 to 1.5. It is found that the synergistic combination of a hypersonic L/D of 1.2, an advanced cryopropelled engine, and an LH2 drop tank (1-1/2 stage) leads to a single 65,000 pound shuttle, two-man geosynchronous mission with 2100 pounds of useful paylod. Additional payload enhancement is possible with AOTV dry weight reductions due to technology advances in the areas of vehicle structures and thermal protection systems and other subsystems.

Florence, D. E.↗

Comparison between Hayabusa 2 Spectral Measurements and Simulations

Recent Hayabusa 2 spectral measurements are compared with state-of-the-art shock-layer radiation simulations resulting from the LAURA/HARA code suite. These simulations include coupled ablation, which accounts for the injection of ablation products into the flowfield, and coupled radiation, which accounts for radiative energy loss in the flowfield. To enable the cou- pled ablation simulations, a best-estimate model is developed for Hayabusa’s carbon-phenolic ablator based on available published information. The comparison between the simulations and measurements focuses on three atomic nitrogen lines, two atomic oxygen lines, one atomic hydrogen line, and the CN Violet band system. Parametric uncertainties are evaluated for these features using a recently developed capability in LAURA/HARA. These uncertainties capture the impact of flowfield and radiation modeling uncertainties on the observed radiation simulations, and include the impact of coupled radiation and ablation product emission. The resulting parametric uncertainties range from 50 to over 100% for the atomic lines, and 80% for CN Violet. Uncertainties in flowfield kinetics and non-Boltzmann modeling provide the dominant contribution to these uncertainties. For the atomic nitrogen and oxygen lines, com- parisons between the nominal simulations and measurements show agreement well within these simulation uncertainty bounds, with the measurements within 20% of the nominal simulation over most of the trajectory, and within 10% at peak emission. This excellent agreement is un- precedented for observed radiation measurements of atomic lines, where previous Stardust and Hayabusa 1 comparisons were significantly worse. The improved agreement for these Hayabusa 2 comparisons is both the result of improved measurement quality and enhanced flowfield and radiation modeling. For the ablation product emission from the 656 nm atomic hydrogen line, the agreement between measurements and simulations is within ±20% for all trajectory points except one outlier. This good comparison is surprising considering this species depends on the ablation rate and is shown to have strong wake contribution, which both contribute to the large ≈±70% parametric uncertainty. For the ablation product emission from CN Violet, the simulations over-predict the measurements by over a factor of two early in the trajectory, with the comparison improving later in the trajectory. This disagreement for CN Violet is consistent with the ≈±80% parametric uncertainty bounds evaluated for the simulations. To utilize the excellent agreement between the atomic line simulations and measurements in the assessment of the radiative heating margin for a future flight vehicle, the flowfield property binning (FPB) approach is applied. Using the Mars Sample Return (MSR) Earth Entry System (EES) as an example, the combination of the excellent Hayabusa comparisons and the FPB analysis justify nearly a 10% reduction in the radiative heating margin from an assumed baseline margin of 30%. This direct quantitative link between observed radiation measurements and the radia- tive heating margin of future flight vehicles demonstrates the value of these observed radiation measurements.

Shock-Layer Radiative Heating↗

ACRV derived transportation system

Alternate means for manned transportation to low earth orbit are being considered by NASA to complement and eventually replace the Space Shuttle. One method of achieving two-way transportation is through the modification of Assured Crew Return Vehicle (ACRV). The ACRV is a manned transportation system designed to bring home Space Station Freedom crews in the event of an emergency or Shuttle standdown. The ACRV is launched in the Space Shuttle-payload bay and is designed for earth return from low earth orbit. A study was performed that addressed the modification of an ACRV into a two-way manned transportation system. The Station Crew Return Alternate Module (SCRAM) configuration was chosen as the reference ACRV vehicle. This paper will discuss the requirements and ground rules used in the study as well as the design modifications made to the ACRV.

Peterson, Wayne L.↗

Aerospace News: Space Shuttle Commemoration. Volume 2, No. 7

The complex space shuttle design was comprised of four components: the external tank, two solid rocket boosters (SRB), and the orbiter vehicle. Six orbiters were used during the life of the program. In order of introduction into the fleet, they were: Enterprise (a test vehicle), Columbia, Challenger, Discovery, Atlantis and Endeavour. The space shuttle had the unique ability to launch into orbit, perform on-orbit tasks, return to earth and land on a runway. It was an orbiting laboratory, International Space Station crew delivery and supply replenisher, satellite launcher and payload delivery vehicle, all in one. Except for the external tank, all components of the space shuttle were designed to be reusable for many flights. ATK s reusable solid rocket motors (RSRM) were designed to be flown, recovered, and the metal components reused 20 times. Following each space shuttle launch, the SRBs would parachute into the ocean and be recovered by the Liberty Star and Freedom Star recovery ships. The recovered boosters would then be received at the Cape Canaveral Air Force Station Hangar AF facility for disassembly and engineering post-flight evaluation. At Hangar AF, the RSRM field joints were demated and the segments prepared to be returned to Utah by railcar. The segments were then shipped to ATK s facilities in Clearfield for additional evaluation prior to washout, disassembly and refurbishment. Later the refurbished metal components would be transported to ATK s Promontory facilities to begin a new cycle. ATK s RSRMs were manufactured in Promontory, Utah. During the Space Shuttle Program, ATK supported NASA s Marshall Space Flight Center whose responsibility was for all propulsion elements on the program, including the main engines and solid rocket motors. On launch day for the space shuttle, ATK s Launch Site Operations employees at Kennedy Space Center (KSC) provided lead engineering support for ground operations and NASA s chief engineer. It was ATK s responsibility to have a representative in Firing Room 2 at KSC in case of potential motor problems. However, the last time ATK was responsible for a space shuttle launch slip was 1989. During launch, engineers were also stationed in Promontory on teleconference with counterparts at KSC in the event their support was required.

Source record↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5),volume 1B, part 1, study results

Significant performance benefits can be realized via aerodynamic breaking and/or aerodynamic maneuvering on return from higher altitude orbits to low Earth orbit. This approach substantially reduces the mission propellant requirements by using the aerodynamic drag, D, to brake the vehicle to near circular velocity and the aerodynamic lift, L, to null out accumulated errors as well as change the orbital inclination to that required for rendezous with the Space Shuttle Orbiter. A study was completed where broad concept evaluations were performed and the technology requirements and sensitivities for aeroassisted Orbital Transfer Vehicles (AOTVs) over a range of vehicle hypersonic L/D from 0.75 to 1.5 were systematically identified and assessed. The AOTV is capable of evolving from an initial delivery only system to one eventually capable of supporting manned roundtrip missions to geosynchronous orbit. Concept screenings were conducted on numerous configurations spanning the L/D = 0.75 to 1.5 range, and several with attractive features were identified. Initial payload capability was evaluated for a baseline of delivery to GEO, six hour polar, and Molniya orbits with return and recovery of the AOTV at LEO. Evolutionary payload requirements that were assessed include a GEO servicing mission and a manned GEO mission.

Source record↗

The Mars Sample Return Project

The Mars Sample Return (MSR) Project is underway. A 2003 mission to be launched on a Delta III Class Vehicle and a 2005 mission launched on an Ariane 5 will culminate in carefully selected Mars samples arriving on Earth in 2008.

Mars↗

Pterodactyl: Thermal Protection System for Integrated Control Design of a Mechanically Deployed Entry Vehicle

The need for precision landing of high mass payloads on Mars and the return of sensitive samples from other planetary bodies to specific locations on Earth is driving the development of an innovative NASA technology referred to as the Deployable Entry Vehicle (DEV). A DEV has the potential to deliver an equivalent science payload with a stowed diameter 3 to 4 times smaller than a traditional rigid capsule configuration. However, the DEV design does not easily lend itself to traditional methods of directional control. The NASA Space Technology Mission Directorate (STMD)’s Pterodactyl project is currently investigating the effectiveness of three different Guidance and Control (G&C) systems – actuated flaps, Center of Gravity (CG) or mass movement, and Reaction Control System (RCS) – for use with a DEV using the Adaptable, Deployable, Entry, and Placement Technology (ADEPT) design. This paper details the Thermal Protection System (TPS) design and associated mass estimation efforts for each of the G&C systems. TPS is needed for the nose cap of the DEV and the flaps of the actuated flap control system. The development of a TPS selection, sizing, and mass estimation method designed to deal with the varying requirements for the G&C options throughout the trajectory is presented. The paper discusses the methods used to i) obtain heating environments throughout the trajectory with respect to the chosen control system and resulting geometry; ii) determine a suitable TPS material; iii) produce TPS thickness estimations; and, iv) determine the final TPS mass estimation based on TPS thickness, vehicle control system, vehicle structure, and vehicle payload.

Hays, Zane B.↗

Orion Optical Navigation Progress Toward Exploration Mission 1

Optical navigation of human spacecraft was proposed on Gemini and implemented successfully on Apollo as a means of autonomously operating the vehicle in the event of lost communication with controllers on Earth. The Orion emergency return system utilizing optical navigation has matured in design over the last several years, and is currently undergoing the final implementation and test phase in preparation for Exploration Mission 1 (EM-1) in 2019. The software development is past its Critical Design Review, and is progressing through test and certification for human rating. The filter architecture uses a square-root-free UDU covariance factorization. Linear Covariance Analysis (LinCov) was used to analyze the measurement models and the measurement error models on a representative EM-1 trajectory. The Orion EM-1 flight camera was calibrated at the Johnson Space Center (JSC) electro-optics lab. To permanently stake the focal length of the camera a 500 mm focal length refractive collimator was used. Two Engineering Design Unit (EDU) cameras and an EDU star tracker were used for a live-sky test in Denver. In-space imagery with high-fidelity truth metadata is rare so these live-sky tests provide one of the closest real-world analogs to operational use. A hardware-in-the-loop test rig was developed in the Johnson Space Center Electro-Optics Lab to exercise the OpNav system prior to integrated testing on the Orion vehicle. The software is verified with synthetic images. Several hundred off-nominal images are also used to analyze robustness and fault detection in the software. These include effects such as stray light, excess radiation damage, and specular reflections, and are used to help verify the tuning parameters chosen for the algorithms such as earth atmosphere bias, minimum pixel intensity, and star detection thresholds.

Holt, Greg N.↗

Direct simulation of rarefied hypersonic flows

As the capability of the space transportation vehicles (STV's) expand to meet the requirements for future space exploration and utilization, the effects of rarefied hypersonic flows will play a more significant role in defining the aerodynamic and aerothermodynamic performance of STV's. This is particularly true of the low lift/drag aeroassisted STV's where aerobraking occurs at relatively high altitudes and high velocity. Because of the limitations of the continuum description as expressed by the Navier-Stokes equations and the difficulties of solving the Boltzmann equation, the particle of molecular approach has been developed over the last three decades for modeling rarefied gas effects. The direct simulation Monte Carlo (DSMC) method of Bird is the most used method today for simulating rarefied flows. The DSMC method provides a direct physical simulation as opposed to a numerical solution of a set of model equations. This is accomplished by developing phenomenological models of the relevant physical events. The DSMC method accounts for translational, thermal, chemical, and radiative nonequilibrium effects. The general features of the DSMC method, the numerical requirements for obtaining meaningful results, the modeling used to simulate high temperature gas effects, and applications of the method to calculate the flow about an aeroassist flight experiment vehicle (AFE) are reviewed. The AFE simulates a geosynchronous return while entering the Earth's upper atmosphere at approximately 10 km/s. Results obtained using a general 3-D code are presented for the more rarefied portion of the atmospheric encounter (altitudes of 200 to 100 km) emphasizing surface, flowfield, and aerodynamic characteristics of the AFE. Finally, results obtained using axisymmetric and 1-D versions of the code are presented for lower altitude conditions.

Moss, James N.↗

Preliminary Results of the Effect of Microgravity on Seated Height

The new vehicle for future space travel to the International Space Station (ISS) and beyond will be highly dependent on the seat layout. A primary concern with the seat layout design of the new vehicle is the amount of seated height growth that occurs in space; this could cause a major accommodation issue. The design of the seats, seat layout, suit fit, and crew accommodation are all critically affected due to the increase in height that occurs in microgravity. The increase in height due to spinal elongation caused by the absence of gravity could lead to inadequate clearances that would have implications for the ability of crewmembers to return safely or to conduct nominal operations during the mission. This study was designed to reduce the risk of inadequate design of the vehicle, environment, tools, equipment, etc. (SHFE risk 2.3.1.1) and safely return crewmembers to earth from low-earth orbit travel, ISS, and beyond. In order to safely return the crewmembers, the design requirements must anticipate microgravity growth, elongation of the spine, bone and muscle loss, fluid shifts, etc. Thus, this study is to determine the amount of torso growth (spinal elongation) for a seated posture during Shuttle and ISS missions. Crewmembers seated heights were collected before, during, and after spaceflight to quantify the amount of growth that occurred as a result of microgravity. The changes in seated height will provide the designers with a design requirement which allows for change in spinal growth for a seated posture. Preliminary results have shown that , during flight, seated height increases by a range of approximately 2-6 percent compared to pre-launch seated height.

Rajulu, Sudhakar↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗

Ion propulsion system design for the Comet Nucleus Sample Return mission

One of the first science missions to use solar electric propulsion (SEP) may be the Comet Nucleus Sample Return (CNSR) mission which is designed to return samples of volatiles and dust from the nucleus of a comet. The use of SEP for CNSR makes the mission affordable and scientifically more attractive because it enables the use of a smaller, lower cost launch vehicle and it significantly reduces the time required to return samples to the Earth.

CNSR↗

Biomedical Results of the Space Shuttle Program

The Space Shuttle Program (SSP), which was triumphantly completed by the flight of STS-135 on July 21, 2011, holds a special place in the history of Human Space Exploration. For the first time, a vehicle was built that could perform multiple flights in space and return to Earth. Many important questions regarding the ability of humans to adapt and function in space have been answered during the 30 years since the SSP was launched and many lessons have been learned. The multidisciplinary studies conducted during this program allowed NASA to define the normal responses and potential pathologic changes of the major physiological systems to short-duration space flights. The program significantly contributed to the development of in-flight medical care capabilities and multiple countermeasures. A comprehensive system of preflight, in-flight, and post-flight monitoring of the astronauts was built. It is important to emphasize that the SSP was essential for building the International Space Station (ISS) that significantly expanded the boundaries of space research, allowing for planning of long-term near-terrestrial and extraterrestrial missions. As the program was coming to completion, a decision was made by the NASA Lyndon B. Johnson Space Center Human Research Program senior management to summarize the medico-biological results of the SSP in one comprehensive edition. This was quite an ambitious goal. It required selection of a group of experts in different areas to become the chapters lead authors. These experts were charged with the task of reviewing what was learned in the consequent fields to make the chapters a comprehensive source of information for planning of research, operational activities, and medical care for future missions. We hope that we were able to accomplish this goal and the book will serve as a reliable reference edition for the international space biomedicine community, for new generation of space researchers and Flight Surgeons, as well as for all those interested in space exploration. As space exploration continues, the major question of whether humans are capable of adapting to long-term presence and adequately functioning in space habitats will remain open for a long time. we expect that the comprehensive review of the medico-biological results of the SSP along with the data collected during the missions on the space stations (the Russian space station _Mir_ and ISS) provides a good starting point in seeking the answer to this question.

Diana Risin↗

Interplanetary Sample Return Missions Using Radioisotope Electric Propulsion

Solar electric propulsion (SEP) is being used for a variety of planetary missions sponsored by ESA, JAXA, and NASA and nuclear electric propulsion (NEP) is being considered for future, flagship-class interplanetary missions. Radioisotope electric propulsion (REP) has recently been shown to effectively complement SEP and NEP for missions to high-AU targets with modest payload requirements. This paper investigates the application of an advanced REP for a sample return from the comet Tempel 1. A set of mission and system parameters are varied with the goal of quantifying their impact on total mission payload. Mission parameters considered include trip-time and Earth return entry interface speed of the sample return system. System parameters considered include launch vehicle, power level of spacecraft at beginning of mission, and thruster specific impulse. For the baseline case of Atlas 401 and REP power level of 750 W, the mission time was 12 years, the payload was 144 kg, and the missions optimized to a single specific impulse generally within Hall ion thruster range. Other cases were investigated in support of graduate studies, and include the larger Atlas 551 launch vehicle and extended power level to 1 kW. The Atlas 551 cases tended to optimize dual specific impulses generally in the Hall ion thruster range for both legs of the mission. A power level of at least 1-kW and trip-time of approximately 11 years was required to obtain a total science payload close to 320 kg for the Atlas 401 launch vehicle. An Atlas 551 launch vehicle yielded a science payload of approximately 540 kg for the case of 1-kW of power and an 11-year trip time, and nearly 250 kg of science payload for the case of 1-kW of power and a 6-year trip time. Results are also reported indicating the performance ramifications of meeting a reduced Earth entry interface velocity constraint.

Williams, R.↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States' human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After over 40 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent and how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort.

Bigler, Mark↗