Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Second-phase Development of the China JinPing Underground Laboratory

During 2013-2015 an expansion of the China JinPing underground Laboratory (CJPL) will be undertaken along a main branch of a bypass tunnel in the JinPing tunnel complex. This second phase of CJPL will increase laboratory space to approximately 96,000 m 3 , which can be compared to the existing CJPL-I volume of ∼ 4,000 m 3 . One design configuration has eight additional hall spaces, each over 60 m long and approximately12 m in width, with overburdens of about 2.4 km of rock, oriented parallel to and away from the main water transport and auto traffic tunnels. There are additional possibilities for further expansions at a nearby second bypass tunnel and along the entrance and exit branches of both bypass tunnels, potentially leading to an expanded CJPL comparable in size to Gran Sasso. Concurrent with the excavation activities, planning is underway for dark matter and other rare- event detectors, as well as for geophysics/engineering and other coupled multi-disciplinary sensors. In the town meeting on 8 September, 2013 at Asilomar, CA, associated with the 13 th International Conference on Topics in Astroparticle and Underground Physics (TAUP), presentations and panel discussions addressed plans for one-ton expansions of the current CJPL germanium detector array of the China Darkmatter EXperiment (CDEX) collaboration and of the duel-phase xenon detector of the Panda-X collaboration, as well as possible new detector initiatives for dark matter studies, low-energy solar neutrino detection, neutrinoless double beta searches, and geoneutrinos. JinPing was also discussed as a site for a low-energy nuclear astrophysics accelerator. Geophysics/engineering opportunities include acoustic and micro-seismic monitoring of rock bursts during and after excavation, coupled-process in situ measurements, local, regional, and global monitoring of seismically induced radon emission, and electromagnetic signals. Additional ideas and projects will likely be developed in the next few years, driven by China’s domestic needs and by international experiments requiring access to very great depths.

58 GEOSCIENCES↗

The decay of wood in landfills in contrasting climates in Australia

Highlights: • We examine decay in wood from landfills in contrasting environments in Australia. • Analysis is based on changes in chemical composition and microscopy. • Climate did not influence levels of decay observed. • Microscopy of retrieved samples revealed most of the decay was aerobic in nature. • Current default factors for wood decay in landfills overestimate methane emissions. - Abstract: Wood products in landfill are commonly assumed to decay within several decades, returning the carbon contained therein to the atmosphere, with about half the carbon released as methane. However, the rate and extent of decay is not well known, as very few studies have examined the decay of wood products in landfills. This study reports on the findings from landfill excavations conducted in the Australian cities of Sydney and Cairns located in temperate and tropical environments, respectively. The objective of this study was to determine whether burial of the wood in warmer, more tropical conditions in Cairns would result in greater levels of decay than occurs in the temperate environment of Sydney. Wood samples recovered after 16–44 years in landfill were examined through physical, chemical and microscopic analyses, and compared with control samples to determine the carbon loss. There was typically little or no decay in the wood samples analysed from the landfill in Sydney. Although there was significant decay in rainforest wood species excavated from Cairns, decay levels for wood types that were common to both Cairns and Sydney landfills were similar. The current Intergovernmental Panel on Climate Change (IPCC, 2006) default decay factor for organic materials in landfills is 50%. In contrast, the carbon loss determined for Pinus radiata recovered from Sydney and Cairns landfills was 7.9% and 4.4%, respectively, and 0% for Agathis sp. This suggests that climate did not influence decay, and that the more extensive levels of decay observed for some wood samples from Cairns indicates that those wood types were more susceptible to biodegradation. Microscopic analyses revealed that most decay patterns observed in samples analysed from Sydney were consistent with aerobic fungal decay. Only a minor portion of the microbial decay was due to erosion bacteria active in anaerobic/near anaerobic environments. The findings of this study strongly suggest that models that adopt current accepted default factors for the decay of wood in landfills greatly overestimate methane emissions.

54 ENVIRONMENTAL SCIENCES↗

Folsom Mammoth Hunters? The Terminal Pleistocene Assemblage From Owl Cave (10BV30), Wasden Site, Idaho

The 1960s and 1970s excavations at Owl Cave (10BV30) recovered mammoth bone and Folsom-like points from the same strata, suggesting evidence for a post-Clovis mammoth kill. However, a synthesis of the excavation data was never published, and the locality has since been purged from the roster of sites with human/extinct megafauna associations. In this paper, we present dates on bone from the oldest stratum, review provenience data, conduct a bone-surface modification study, and present the results of a protein-residue analysis. Our study fails to make the case for mammoth hunting by Folsom peoples. Although two of the point fragments tested positive for horse or elephant protein, recent AMS dates indicate that all of the mammoth remains predate Folsom, and horse remains are absent from the Owl Cave collection. Further, no unambiguously cultural surface modifications were identified on any of the mammoth remains. Given the available data, the Owl Cave deposits are most parsimoniously read as containing a Folsom-age occupation in a buried context, the first of its kind in the desert West, but one nonetheless part of a palimpsest of terminal Pleistocene materials.

99 GENERAL AND MISCELLANEOUS↗

Use of a Dual-Structure Constitutive Model for Predicting the Long-Term Behavior of an Expansive Clay Buffer in a Nuclear Waste Repository

Expansive soils are suitable as backfill and buffer materials in engineered barrier systems to isolate heat-generating nuclear waste in deep geological formations. The canisters containing nuclear waste would be placed in tunnels excavated at a depth of several hundred meters. The expansive soil should provide enough swelling capacity to support the tunnel walls, thereby reducing the impact of the excavation-damaged zone on the long-term mechanical and flow-barrier performance. In addition to their swelling capacity, expansive soils are characterized by accumulating irreversible strain on suction cycles and by effects of microstructural swelling on water permeability that for backfill or buffer materials can significantly delay the time it takes to reach full saturation. In order to simulate these characteristics of expansive soils, a dual-structure constitutive model that includes two porosity levels is necessary. The authors present the formulation of a dual-structure model and describe its implementation into a coupled fluid flow and geomechanical numerical simulator. The authors use the Barcelona Basic Model (BBM), which is an elastoplastic constitutive model for unsaturated soils, to model the macrostructure, and it is assumed that the strains of the microstructure, which are volumetric and elastic, induce plastic strain to the macrostructure. The authors tested and demonstrated the capabilities of the implemented dual-structure model by modeling and reproducing observed behavior in two laboratory tests of expansive clay. As observed in the experiments, the simulations yielded nonreversible strain accumulation with suction cycles and a decreasing swelling capacity with increasing confining stress. Finally, the authors modeled, for the first time using a dual-structure model, the long-term (100,000 years) performance of a generic heat-generating nuclear waste repository with waste emplacement in horizontal tunnels backfilled with expansive clay and hosted in a clay rock formation. The thermo-hydro-mechanical results of the dual-structure model were compared with those of the standard single-structure BBM. The main difference between the simulation results from the two models is that the dual-structure model predicted a time to fully saturate the expansive clay barrier on the order of thousands of years, whereas the standard single-structure BBM yielded a time on the order of tens of years. These examples show that a dual-structure model, such as the one presented here, is necessary to properly model the thermo-hydro-mechanical behavior of expansive soils.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OBSERVATIONAL EVIDENCE FOR AN IMPACT ON THE MAIN-BELT ASTEROID (596) SCHEILA

An unexpected outburst was observed around (596) Scheila in 2010 December. We observed (596) Scheila soon after the impact using ground-based telescopes. We succeeded in the detection of a faint linear tail after 2011 February, which provides a clue to determine the dust ejection date. It is found that the dust particles ranging from 0.1-1 {mu}m to 100 {mu}m were ejected into the interplanetary space impulsively on December 3.5 {+-}1.0 day. The ejecta mass was estimated to be (1.5-4.9)x10{sup 8} kg, suggesting that an equivalent mass of a 500-800 m diameter crater was excavated by the event. We also found that the shape of the light curve changed after the impact event probably because fresh material was excavated around the impact site. We conclude that a decameter-sized asteroid collided with (596) Scheila only eight days before the discovery.

79 ASTRONOMY AND ASTROPHYSICS↗

ESTIMATING THE SIZE OF LATE VENEER IMPACTORS FROM IMPACT-INDUCED MIXING ON MERCURY

Late accretion of a ''veneer'' of compositionally diverse planetesimals may introduce chemical heterogeneity in the mantles of the terrestrial planets. The size of the late veneer objects is an important control on the angular momenta, eccentricities, and inclinations of the terrestrial planets, but current estimates range from meter-scale bodies to objects with diameters of thousands of kilometers. We use a three-dimensional global Monte Carlo model of impact cratering, excavation, and ejecta blanket formation to show that evidence of mantle heterogeneity can be preserved within ejecta blankets of mantle-exhuming impacts on terrestrial planets. Compositionally distinct provinces implanted at the time of the late veneer are most likely to be preserved in bodies whose subsequent geodynamical evolution is limited. Mercury may have avoided intensive mixing by solid-state convection during much of its history. Its subsequent bombardment may have then excavated evidence of primordial mantle heterogeneity introduced by the late veneer. Simple geometric arguments can predict the amount of mantle material in the ejecta blanket of mantle-exhuming impacts, and deviations in composition relative to geometric predictions can constrain the length-scale of chemical heterogeneities in the subsurface. A marked change in the relationship between mantle and ejecta composition occurs when chemically distinct provinces are ∼250 km in diameter; thus, evidence of bombardment by thousand-kilometer-sized objects should be readily apparent from the variation in compositions of ejecta blankets in Mercury's ancient cratered terrains.

79 ASTRONOMY AND ASTROPHYSICS↗

Accumulator Sizing for the Hybrid Hydraulic Electric Architecture (HHEA) Using Dynamic Programming

Abstract The Hybrid Hydraulic Electric Architecture (HHEA) is an approach to electrifying and improving that does not require very large electric machines. The majority power is provided hydraulically via a set of common pressure rails while small electric machines are used to modulate that power to meet exact demand. Each common pressure rail has an accumulator, which keeps the pressure of each rail near constant as long as the volume in the accumulator does not change much. A main pump adds or removes fluid from each accumulator as needed to reduce volume changes in the accumulators. It is the operation of this main pump which is investigated here. In previous analysis it was assumed that the size of the accumulators was large enough to account for any difference in fluid volume without significantly changing the pressure. In this paper, the required accumulator sizes are studied using a dynamic programming approach. At each time step the inlet and outlet of the main pump could be connected to any of the common pressure rails. These decisions for the main pump were optimized to minimize the required accumulator size. Case studies are conducted using drive cycles from a 22-ton excavator, a 20-ton wheel loader and a 5-ton excavator. The machines could be operated with total accumulator sizes of less than 20, 10, and 5 liters respectively. Required accumulator size was found to vary with pump flow rate, the frequency at which the pump/motor was able to change operating conditions, the tolerance level of pressure deviation and the accumulator’s polytropic index.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Radionuclide Transport in Clays

Clay/shale has been considered as potential host rock for geological disposal of high-level nuclear waste throughout the world, because of its low permeability, low diffusion coefficient, high retention capacity for radionuclides, and capability to self-seal fractures induced by tunnel excavation. For example, Callovo-Oxfordian argillites at the Bure site, France (Fouche et al., 2004), Toarcian argillites at the Tournemire site, France (Patriarche et al., 2004), Opalinus Clay at the Mont Terri site, Switzerland (Meier et al., 2000), and Boom clay at the Mol site, Belgium (Barnichon and Volckaert, 2003) have all been under intensive scientific investigation (at both field and laboratory scales) for understanding a variety of rock properties and their relationships to flow and transport processes associated with geological disposal of nuclear waste. Clay/shale formations may be generally classified as indurated or plastic clays (Tsang and Hudson, 2010). The latter (including Boom clay) is a softer material without high cohesion; its deformation is dominantly plastic. During the lifespan of a clay repository, the repository performance is affected by complex thermal, hydrogeological, mechanical, chemical (THMC) processes, such as heat release due to radionuclide decay, multiphase flow, formation of damage zones, radionuclide transport, waste dissolution, and chemical reactions. All these processes are related to each other. An in-depth understanding of these coupled processes is critical for the performance assessment (PA) of the repository. These coupled processes may affect radionuclide transport by changing transport paths (e.g., formation and evolution of excavation damaged zone (EDZ)) and altering flow, mineral, and mechanical properties that are related to radionuclide transport. While radionuclide transport in clay formation has been studied using laboratory tests (e,g, Appelo et al. 2010, Garcia-Gutierrez et al., 2008, Maes et al., 2008), short-term field tests (e.g. Garcia-Gutierrez et al. 2006, Soler et al. 2008, van Loon et al. 2004, Wu et al. 2009) and numerical modeling (de Windt et al. 2003; 2006), the effects of THMC processes on radionuclide transport are not fully investigated. The objectives of the research activity documented in this report are to improve a modeling capability for coupled THMC processes and to use it to evaluate the THMC impacts on radionuclide transport. This research activity addresses several key Features, Events and Processes (FEPs), including FEP 2.2.08, Hydrologic Processes, FEP 2.2.07, Mechanical Processes and FEP 2.2.09, Chemical Process— Transport, by studying near-field coupled THMC processes in clay/shale repositories and their impacts on radionuclide transport. This report documents the progress that has been made in FY12. Section 2 discusses the development of THMC modeling capability. Section 3 reports modeling results of THMC impacts on radionuclide transport. Planned work for the remaining months of FY12 and proposed work for FY13 are presented in Section 4.

54 ENVIRONMENTAL SCIENCES↗

2012 Update to the Site Discharge Pollution Prevention Plan, Rev. 1: Sandia/Mortandad Watershed Receiving Waters: Sandia Canyon, Cañada del Buey, Mortandad Canyon, and Ten-Site Canyon (Vol. 2)

Two historical industrial activity areas are associated with S001, S-SMA-0.25: Sites 03-013(a) and 03-052(f). Solid Waste Management Unit (SWMU) 03-013(a) is a 1500-ft-long corrugated metal pipe (CMP) storm drain that served building 03-0038. The storm drain ran underground around building 03-0038, east along the south side of the Otowi Building (building 03-0261) and connected to four other storm drains before daylighting 100 ft east of the Otowi Building where it became an open concrete- and rock-lined ditch. The open drain continued past transportable office buildings (buildings 03-1616 and 03-1617) and passed beneath streets and sidewalks to a point northeast of the Oppenheimer Study Center (building 03-0207) where it discharged to the SWMU 03-052(f) outfall before draining into Sandia Canyon. Most of the CMP associated with SWMU 03-013(a) was removed in 2004 to accommodate the construction of the National Security Science Building (03-1400) and a new parking structure (03-1402) east of the Otowi Building. The CMP was managed as nonhazardous/nonradioactive industrial waste. Inspection of the drainline trench showed no evidence of a release from the drainpipe. A new storm drainline was installed west of SWMU 03-052(f) to manage storm water runoff from the new parking structure. The new storm drain discharges to SWMU 03-052(f). Potential contaminants associated with industrial materials historically managed at this Site are metals and petroleum products. SWMU 03-052(f) is a formerly permitted outfall (U.S. Environmental Protection Agency [EPA] 03A023) that received wastewater from floor drains [Area of Concern (AOC) 03-013(b)], sinks, water fountains, and a storm drain [SWMU 03-013(a)], which served building 03-0038 until 1987 when the drains in building 03-0038 were rerouted to the Technical Area 03 (TA-03) sanitary sewer system. Stoddard solvents, dry acid, and caustic materials from the maintenance shop were discarded through sinks and floor drains to this outfall. Spent paint solvents and cutting oils contaminated with machined beryllium particles may also have been released to the floor drains during the 1960s and 1970s. In addition, cooling water for welding torches was discharged directly to the drains. The first spill was approximately 200 gal. of a water-waste oil mixture that was discharged when an automatic compressor blowdown mechanism failed. A second spill from a ruptured air-compressor oil line resulted in the release of approximately 1 qt of compressor oil to the drain. This spill produced an oily sheen on the surface of the water at the SWMU 03-052(f) outfall. A third spill occurred when approximately 15 gal. of diesel fuel was released from a ruptured truck fuel line into the utilities construction trench between buildings 03-1793 and 03-1794. On the same day, a clay sewer pipe in the utility trench broke, releasing approximately 2000 gal. of wastewater into the excavation. A sump was used to remove the wastewater from the excavation, and the wastewater was discharged to SWMU 03-052(f). The diesel-contaminated asphalt and soil were removed and disposed of. Runoff from parking lots and the surrounding areas also discharges to the outfall. Outfall 03A023 was removed from the National Pollutant Discharge Elimination System (NPDES) permit on July 11, 1997. Potential contaminants associated with industrial materials historically managed at this Site are volatile organic solvents, petroleum products, and metals included in discharges from the maintenance contractor’s shop in building 03-38 and three reported petroleum hydrocarbon spills.

54 ENVIRONMENTAL SCIENCES↗

Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho

If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.

54 ENVIRONMENTAL SCIENCES↗

Methods for Finding Legacy Wells in Residential and Commercial Areas

In 1919, the enthusiasm surrounding a short-lived gas play in Versailles Borough, Pennsylvania resulted in the drilling of many needless wells. The legacy of this activity exists today in the form of abandoned, unplugged gas wells that are a continuing source of fugitive methane in the midst of a residential and commercial area. Flammable concentrations of methane have been detected near building foundations, which have forced people from their homes and businesses until methane concentrations decreased. Despite mitigation efforts, methane problems persist and have caused some buildings to be permanently abandoned and demolished. This paper describes the use of magnetic and methane sensing methods by the National Energy Technology Laboratory (NETL) to locate abandoned gas wells in Versailles Borough where site access is limited and existing infrastructure can interfere. Here, wells are located between closely spaced houses and beneath buildings and parking lots. Wells are seldom visible, often because wellheads and internal casing strings have been removed, and external casing has been cut off below ground level. The magnetic survey of Versailles Borough identified 53 strong, monopole magnetic anomalies that are presumed to indicate the locations of steel-cased wells. This hypothesis was tested by excavating the location of one strong, monopole magnetic anomaly that was within an area of anomalous methane concentrations. The excavation uncovered an unplugged gas well that was within 0.2 m of the location of the maximum magnetic signal. Truck-mounted methane surveys of Versailles Borough detected numerous methane anomalies that were useful for narrowing search areas. Methane sources identified during truck-mounted surveys included strong methane sources such as sewers and methane mitigation vents. However, inconsistent wind direction and speed, especially between buildings, made locating weaker methane sources (such as leaking wells) difficult. Walking surveys with the methane detector mounted on a cart or wagon were more effective for detecting leaking wells because the instrument’s air inlet was near the ground where: 1) the methane concentration from subsurface sources (including wells) was a maximum, and 2) there was less displacement of methane anomalies from methane sources by air currents. The Versailles Borough survey found 15 methane anomalies that coincided with the location of well-type magnetic anomalies; the methane sources for these anomalies were assumed to be leaking wells. For abandoned well locations where the wellhead and all casing strings have been removed and there is no magnetic anomaly, leaking wellbores can sometimes be detected by methane surveys. Unlike magnetic anomalies, methane anomalies can be: 1) ephemeral, 2) significantly displaced from the well location, and 3) from non-well sources that cannot be discriminated without isotopic analysis. If methane surveys are used for well location, the air inlet to the instrument should be kept as close to the ground as possible to minimize the likelihood of detecting methane from distant, wind-blown sources.

54 ENVIRONMENTAL SCIENCES↗

Considerations of the Differences between Bedded and Domal Salt Pertaining to Disposal of Heat-Generating Nuclear Waste

Salt formations hold promise for eternal removal of nuclear waste from our biosphere. Germany and the United States have ample salt formations for this purpose, ranging from flat-bedded formations to geologically mature dome structures. As both nations revisit nuclear waste disposal options, the choice between bedded, domal, or intermediate pillow formations is once again a contemporary issue. For decades, favorable attributes of salt as a disposal medium have been extoled and evaluated, carefully and thoroughly. Yet, a sense of discovery continues as science and engineering interrogate naturally heterogeneous systems. Salt formations are impermeable to fluids. Excavation-induced fractures heal as seal systems are placed or natural closure progresses toward equilibrium. Engineering required for nuclear waste disposal gains from mining and storage industries, as humans have been mining salt for millennia. This great intellectual warehouse has been honed and distilled, but not perfected, for all nuances of nuclear waste disposal. Nonetheless, nations are able and have already produced suitable license applications for radioactive waste disposal in salt. A remaining conundrum is site location. Salt formations provide isolation and geotechnical barriers reestablish impermeability after waste is placed in the geology. Between excavation and closure, physical, mechanical, thermal, chemical, and hydrological processes ensue. Positive attributes for isolation in salt have many commonalities independent of the geologic setting. In some cases, specific details of the environment will affect the disposal concept and thereby define interaction of features, events and processes, while simultaneously influencing scenario development. Here we identify and discuss high-level differences and similarities of bedded and domal salt formations. Positive geologic and engineering attributes for disposal purposes are more common among salt formations than are significant differences. Developing models, testing material, characterizing processes, and analyzing performance all have overlapping application regardless of the salt formation of interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations of the Differences between Bedded and Domal Salt Pertaining to Disposal of Heat-Generating Nuclear Waste

Salt formations hold promise for eternal removal of nuclear waste from our biosphere. Germany and the United States have ample salt formations for this purpose, ranging from flat-bedded formations to geologically mature dome structures. As both nations revisit nuclear waste disposal options, the choice between bedded, domal, or intermediate pillow formations is once again a contemporary issue. For decades, favorable attributes of salt as a disposal medium have been extoled and evaluated, carefully and thoroughly. Yet, a sense of discovery continues as science and engineering interrogate naturally heterogeneous systems. Salt formations are impermeable to fluids. Excavation-induced fractures heal as seal systems are placed or natural closure progresses toward equilibrium. Engineering required for nuclear waste disposal gains from mining and storage industries, as humans have been mining salt for millennia. This great intellectual warehouse has been honed and distilled, but not perfected, for all nuances of nuclear waste disposal. Nonetheless, nations are able and have already produced suitable license applications for radioactive waste disposal in salt. A remaining conundrum is site location. Salt formations provide isolation, and geotechnical barriers reestablish impermeability after waste is placed in the geology. Between excavation and closure, physical, mechanical, thermal, chemical, and hydrological processes ensue. Positive attributes for isolation in salt have many commonalities independent of the geologic setting. In some cases, specific details of the environment will affect the disposal concept and thereby define interaction of features, events and processes, while simultaneously influencing scenario development. Here we identify and discuss high-level differences and similarities of bedded and domal salt formations. Positive geologic and engineering attributes for disposal purposes are more common among salt formations than are significant differences. Developing models, testing material, characterizing processes, and analyzing performance all have overlapping application regardless of the salt formation of interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation/Fill/Soil Disturbance, Self-Study #31419

This course, Excavation/Fill/Soil Disturbance Self-Study (#31419), presents an overview of the hazards, controls, and requirements that affect safe excavations at Los Alamos National Laboratory (LANL). An overview of the LANL excavation/fill/soil disturbance permit (EXID permit) approval process is also presented, along with potholing requirements for planning and performing excavations at LANL.

99 GENERAL AND MISCELLANEOUS↗

Results of Temporary Shutdown Testing and Groundwater Pump-Testing at Agra, Kansas, February-September 2016 and march 2017, and Assessment of Groundwater and Contaminant Migration

In 2005, the Commodity Credit Corporation/U.S. Department of Agriculture (CCC/USDA) conducted a comprehensive investigation of potential contaminant source areas on, and in the vicinity of, the former CCC/USDA grain storage facility in Agra, Kansas (Argonne 2006). The data collected during this investigation identified three primary source areas for carbon tetrachloride contamination. One source is located on the former CCC/USDA property, and the other two (western and eastern) sources are located on adjacent property owned by Pro-Ag Marketing. The soil source located at the western end of the Pro-Ag property has been identified as the sole source of carbon tetrachloride contamination to the groundwater in this portion of the Agra site, and is not associated with any grain storage activities on the former CCC/USDA property. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in-situ treatment of the carbon tetrachloride in the soils and underlying groundwater. With the approval of the KDHE, operation of the SVE/AS systems began in May 2009, and has generally continued with minimal interruption since that time. Land farming operations to treat contaminated soil excavated from the LDBs were successfully completed in October 2010.

54 ENVIRONMENTAL SCIENCES↗

Review of Time-Series Data for the Agra Interim Measure, Fall 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Agra, Kansas, from the 1950s to the early 1970s. No structures remain on the property, and the land is used for agricultural purposes, specifically wheat production. The property is currently owned by the Kyle Railroad Co. and is leased to Mr. Herb VanEaton. The Pro-Ag Marketing grain storage facility is directly south of the former CCC/USDA facility. In 1985, carbon tetrachloride was detected in groundwater samples collected from Agra public water supply wells PWS-3 and PWS-4, located approximately 2,000 ft south of the former CCC/USDA facility and approximately 1,800 ft south of the Pro-Ag Marketing Facility, at levels below the maximum contaminant level of 5.0 μg/L. In 1986, in response to an increase in carbon tetrachloride to 12 μg/L in well PWS-3, the city was required to remove both PWS-3 and PWS-4 from service. The Agra public water supply system is served by three other wells (PWS-1, PWS-2, and PWS-5) that are outside the area of contamination. In 2005, the Environmental Science Division of Argonne National Laboratory conducted a comprehensive investigation of potential contaminant source areas at Agra, on behalf of the CCC/USDA. Data collected during the 2005 investigation identified three primary source areas for the carbon tetrachloride contamination (Argonne 2006). One source is located on the former CCC/USDA property, and the other two sources are on property owned by Pro-Ag Marketing. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM) in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in situ treatment of the remaining carbon tetrachloride in the soils and groundwater. Construction data for the SVE wells, the AS wells, and groundwater and soil gas observation points installed to monitor the progress of the cleanup (as reported on the Kansas Review of Time-Series Data for the Agra Interim Measure 1-2 Version 01, 10/24/13 WWC-5 forms for these installations) are summarized in Table 1.1. The locations of the wells are shown in Figure 1.1. The IMWP/D was approved by the Kansas Department of Health and Environment in November 2008 (KDHE 2008), and operation of the SVE/AS systems began in May 2009. With the approval of the KDHE (2009), landfarming operations to treat the contaminated soils excavated from the LDBs were completed on October 12, 2010. Since start-up, the IM activities have been documented periodically (Argonne 2009a,b,c; Argonne 2010a,b,c,d, 2011a,b,c, 2012, 2013a,b), in accord with the requirements of the KDHEapproved IMWP/D (Argonne 2008). Each of the reports primarily summarizes the operations and maintenance of the SVE and AS equipment and the results of sampling of the groundwater, soil gas, and system effluents for analyses for volatile organic compounds (VOCs) over a specific 3- to 6-month period. Hence, the focus is the incremental performance of the IM. To complement these documents, this report provides a broader perspective by examining the collective data acquired since start-up on May 29, 2009, and through June 2013. The objectives of this approach are to evaluate possible longer-term trends in (1) the operational characteristics of the remedial systems and (2) the corresponding responses in the subsurface environment and their potential relationships to the progress of the cleanup. To facilitate this investigation, time-series diagrams have been developed to illustrate key parameter data for the SVE and AS systems, as well as sampling and additional supporting data obtained from the monitoring program. An overview of the information compiled is in Section 2. In Section 3, observations drawn from these data are discussed. The principal findings of the evaluation and recommendations for consideration are summarized in Sections 4 and 5, respectively.

54 ENVIRONMENTAL SCIENCES↗

Crystalline Disposal R&D at LBNL: FY20 Progress Report

Within the Spent Fuel & Waste Science and Technology (SFWST) Program, research work continues further with the goal to better understand long-term performance of disposal systems in three main geologic rock types: clay/shale, salt, and crystalline rock. This report documents LBNL’s research activities related to investigations of crystalline host rock according to the scope of two work packages: SF-20LB01030207 “Crystalline International Collaborations – LBNL,” and SF-20LB01030203 “Crystalline Disposal R&D – LBNL.” These research activities correspond are related to key Features, Events, and Processes (FEPs), ranked in importance from medium to high, as listed in Table 7 of the Used Fuel Disposition Campaign Disposal Research and Development Roadmap (FCR&D-USED-2011-000065 REV0) (Nutt, 2011). Specifically, these research activities address FEP 2.2.01, Excavation Disturbed Zone (EZD). The results of these research activities provide important insights into understanding and predicting flow and transport processes that could occur in low-permeability crystalline rocks, in which fractures might serve as main conduits for fluid flow and radionuclide transport. The evolution of the EDZ during the excavation of the tunnel as well as the evolution of microcrack growth within the EDZ after the emplacement of backfill are critical for predicting the long- term behavior of the EDZ. A number of factors including stress, temperature, water activity, capillary pressure, chemistry, and mineralogy can affect the rock evolution, which require advanced experimental tools to study it.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗