Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Canopy reflectance spectroscopy, thermal images and digital photographs, San Lorenzo, Panama, 2020

This data package comprises reflectance spectra, thermal and visible images of top of canopy tree crowns at the San Lorenzo Protected Area, Panama. Data were collected using the Smithsonian Tropical Research Institute (STRI) canopy access crane, from positions approximately 4 m above the target tree canopy. Canopy reflectance spectra were collected using an HR-1024i full range spectroradiometer (350–2500 nm, SVC, Poughkeepsie, NY, USA) with a 14-degree lens. Canopy thermal images were captured using an 8640-S series USB Calibrated Thermal Camera (ICI International, Beaumont, TX, USA). Visible images were collected using an AW130 waterproof/shockproof camera (Nikon, Tokyo, Japan). Data were collected on three days, on 16 canopies from 10 tree species. On both January 30, 2020, and February 27, 2020, we collected spectra at three time points, in the morning, midday, and afternoon. On February 18, 2020, we collected data around midday only. Due to technical issues, digital photography was collected on 30 January only. This dataset includes unprocessed data only, including spectral data (.sig or .sed), thermal images (.i16), and photographs (.raw), a detailed method description (.pdf), species information (.csv) and ESS-DIVE file-level metadata (FLMD.csv).

54 ENVIRONMENTAL SCIENCES↗

Leaf gas exchange, leaf water potential and spectral reflectance, BIONTE, Brazil, 2023

Leaf traits measured at the top of the canopy on 30 tree species in the BIONTE experimental forest, near Manaus, Brazil, at three time points during August to November, 2023. The aim of this study was to test the relationship between leaf water use efficiency and wood density. Leaf gas exchange was measured on top-of-canopy leaves accessed by an articulated boom lift. Response curves (A-Ci and A-Q), and dark adapted respiration were measured on cut branches. Survey gas exchange measurements were performed on attached leaves at various times during the day. Following gas exchange, leaves were harvested, and measured for leaf water potential and spectral reflectance. Data in this data package is presented in csv files, with metadata in csv and descriptive experimental protocols as pdf. Gas exchange data and metadata meets the requirements of the ESS-DIVE reporting format for leaf-level gas exchange data and metadata.

54 ENVIRONMENTAL SCIENCES↗

Mu2e Electrostatic Septa Volumetric Exchange of FC-40 Dielectric in High Radiation Environments

Two electrostatic septa (ESS) are being designed for the slow extraction of 8 GeV proton beam for the Mu2e experiment at Fermilab. Special attention is given to the high voltage feedthrough (HVF), which energizes the cathode creating the bending field. The FC-40 dielectric fluid, surrounding the HV cable breaks down from radiation exposure, which reduces its insulating capabilities. The new HVF design focuses on effective replacement of the exposed fluid and eliminating the stagnant areas of low exchange rate. A preliminary test using a fully transparent prototype HVF and water was conducted to understand the volumetric exchange rate of the high radiation region. Here we discuss the results of these tests and further studies using the FC-40.

43 PARTICLE ACCELERATORS↗

Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities

A total of 35 Superconducting SSR2 spoke cavities will be installed in the PIP II SRF linac at Fermilab and a total of 8 prototype SSR2 cavities will be manufactured for the prototype cryomodule. In this paper, the mechanical design and fabrication aspects of the prototype jacketed SSR2 cavity will be presented. RF and mechanical design activities were conducted in parallel directly on the jacketed cavity in order to minimize the number of design iterations. Also, the lessons learned from other spoke cavities experiences (i.e. SSR1 at Fermilab and ESS double spoke at IPNO) were considered since the early stage of the design.

43 PARTICLE ACCELERATORS↗

Sample Results From The Extraction, Scrub, And Strip Test For The Blended NGS Solvent

This report summarizes the results of the extraction, scrub, and strip testing for the September 2013 sampling of the Next Generation Solvent (NGS) Blended solvent from the Modular Caustic Side-Solvent Extraction Unit (MCU) Solvent Hold Tank. MCU is in the process of transitioning from the BOBCalixC6 solvent to the NGS Blend solvent. As part of that transition, MCU has intentionally created a blended solvent to be processed using the Salt Batch program. This sample represents the first sample received from that blended solvent. There were two ESS tests performed where NGS blended solvent performance was assessed using either the Tank 21 material utilized in the Salt Batch 7 analyses or a simulant waste material used in the V-5/V-10 contactor testing. This report tabulates the temperature corrected cesium distribution, or D Cs values, step recovery percentage, and actual temperatures recorded during the experiment. This report also identifies the sample receipt date, preparation method, and analysis performed in the accumulation of the listed values. The calculated extraction D Cs values using the Tank 21H material and simulant are 59.4 and 53.8, respectively. The DCs values for two scrub and three strip processes for the Tank 21 material are 4.58, 2.91, 0.00184, 0.0252, and 0.00575, respectively. The D-values for two scrub and three strip processes for the simulant are 3.47, 2.18, 0.00468, 0.00057, and 0.00572, respectively. These values are similar to previous measurements of Salt Batch 7 feed with lab-prepared blended solvent. These numbers are considered compatible to allow simulant testing to be completed in place of actual waste due to the limited availability of feed material.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Sample results from the interim salt disposition program macrobatch 8 tank 21H qualification MST solids sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for Interim Salt Disposition Program (ISDP) processing. As part of this qualification work, SRNL performed an Actinide Removal Process (ARP) and several Extraction, Scrub, Strip (ESS) tests. This document reports characterization of the monosodium titanate (MST) solids from the ARP test. The results of these analyses are reported and are within historical precedent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quasi-Static Indentation Analysis of Carbon-Fiber Laminates.

A series of quasi - static indentation experiments are conducted on carbon fiber reinforced polymer laminates with a systematic variation of thicknesses and fixture boundary conditions. Different deformation mechanisms and their resulting damage mechanisms are activated b y changing the thickn ess and boundary conditions. The quasi - static indentation experiments have been shown to achieve damage mechanisms similar to impact and penetration, however without strain rate effects. The low rate allows for the detailed analysis on the load response. Moreover, interrupted tests allow for the incremental analysis of various damage mechanisms and pr ogressions. The experimentally tested specimens are non - destructively evaluated (NDE) with optical imaging, ultrasonics and computed tomography. The load displacement responses and the NDE are then utilized in numerical simulations for the purpose of model validation and vetting. The accompanying numerical simulation work serves two purposes. First, the results further reveal the time sequence of events and the meaning behind load dro ps not clear from NDE . Second, the simulations demonstrate insufficiencies in the code and can then direct future efforts for development.

36 MATERIALS SCIENCE↗

Results from the interim salt disposition program macrobatch 10 tank 21 H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High power ring methods and accelerator driven subcritical reactor application

High power proton accelerators allow providing, by spallation reaction, the neutron fluxes necessary in the synthesis of fissile material, starting from Uranium 238 or Thorium 232. This is the basis of the concept of sub-critical operation of a reactor, for energy production or nuclear waste transmutation, with the objective of achieving cleaner, safer and more efficient process than today’s technologies allow. Designing, building and operating a proton accelerator in the 500-1000 MeV energy range, CW regime, MW power class still remains a challenge nowadays. There is a limited number of installations at present achieving beam characteristics in that class, e.g., PSI in Villigen, 590 MeV CW beam from a cyclotron, SNS in Oakland, 1 GeV pulsed beam from a linear accelerator, in addition to projects as the ESS in Europe, a 5 MW beam from a linear accelerator. Furthermore, coupling an accelerator to a sub-critical nuclear reactor is a challenging proposition: some of the key issues/requirements are the design of a spallation target to withstand high power densities as well as ensure the safety of the installation. These two domains are the grounds of the PhD work: the focus is on the high power ring methods in the frame of the KURRI FFAG collaboration in Japan: upgrade of the installation towards high intensity is crucial to demonstrate the high beam power capability of FFAG. Thus, modeling of the beam dynamics and benchmarking of different codes was undertaken to validate the simulation results. Experimental results revealed some major losses that need to be understood and eventually overcome. By developing analytical models that account for the field defects, one identified major sources of imperfection in the design of scaling FFAG that explain the important tune variations resulting in the crossing of several betatron resonances. A new formula is derived to compute the tunes and properties established that characterize the effect of the field imperfections on the transverse beam dynamics. The results obtained allow to develop a correction scheme to minimize the tune variations of the FFAG. This is the cornerstone of a new fixed tune non-scaling FFAG that represents a potential candidate for high power applications. As part of the developments towards high power at the KURRI FFAG, beam dynamics studies have to account for space charge effects. In that framework, models have been installed in the tracking code ZGOUBI to account for the self-interaction of the particles in the accelerator. Application to the FFAG studies is shown. Finally, one focused on the ADSR concept as a candidate to solve the problem of nuclear waste. In order to establish the accelerator requirements, one compared the performance of ADSR with other conventional critical reactors by means of the levelized cost of energy. A general comparison between the different accelerator technologies that can satisfy these requirements is finally presented. In summary, the main drawback of the ADSR technology is the high Levelized Cost Of Energy compared to other advanced reactor concepts that do not employ an accelerator. Nowadays, this is a show-stopper for any industrial application aiming at producing energy (without dealing with the waste problem). Besides, the reactor is not intrinsically safer than critical reactor concepts, given the complexity of managing the target interface between the accelerator and the reactor core.

43 PARTICLE ACCELERATORS↗

Final Report: Archiving Data to Support Data Synthesis of DOE Sponsored Elevated CO 2 Experiments

Over the last three decades DOE made a large investment in field-scale experiments in order to understand the role of terrestrial ecosystems in the global carbon cycle, and forecast how carbon cycling will change over the next century. The Smithsonian Environmental Research Center received one of the first awards in this program and managed two long-term studies (25 years and 10 years) with a total of approximately $10 million of support from DOE, and many more millions leveraged from the Smithsonian Institution and agencies such as NSF. The present DOE grant was based on the premise that such a large investment demands a proper synthesis effort so that the full potential of these experiments are realized through data analysis and modeling. The goal of the this grant was to archive legacy data from two major elevated carbon dioxide experiments in DOE databases, and to engage in synthesis activities using these data. Both goals were met. All datasets deemed a high priority for data synthesis and modeling were prepared for archiving and analysis. Many of these datasets were deposited in DOE’s CDIAC, while others are being held at the Oak Ridge National Lab and the Smithsonian Institution until they can be received by DOE’s new ESS-DIVE system at Berkeley Lab. Most of the effort was invested in researching and re-constituting high-quality data sets from a 30-year elevated CO 2 experiment. Using these data, the grant produced products that are already benefiting climate change science, including the publication of new coastal wetland allometry equations based on 9,771 observations, public posting of dozens of datasets, metadata and supporting codes from long-term experiments at the Global Change Research Wetland, and publication of two synthetic data papers on scrub oak forest responses to elevated CO 2 . In addition, three papers are in review or nearing submission reporting unexpected long-term patterns in ecosystem responses to elevated CO 2 and nitrogen in a coastal wetland.

54 ENVIRONMENTAL SCIENCES↗

Safety Outreach and Incident Response Stakeholder Strategy

The objective of this document is to set out a strategy to reach all stakeholders that can impact the timely deployment of safe stationary energy storage systems in the built environment with information on ESS technology and safety that is relevant to their role in deployment of the technology.

25 ENERGY STORAGE↗

DOE OE Energy Storage Systems Safety Roadmap Focus on Proposed Changes to the ICC International Codes Special Briefing Paper — Unofficial Hearing Results April 2018

The goal of the DOE OE ESS Safety Roadmap1 is to foster confidence in the safety and reliability of energy storage systems (ESSs). Three interrelated objectives support the realization of that goal: research, codes and standards, and communication/coordination. The objective focused on codes and standards is - To apply research and development (R&D) to support efforts that are focused on ensuring that codes and standards are available to enable the safe implementation of ESSs in a comprehensive, non-discriminatory and science-based manner. The purpose of this special briefing paper is to support the above objective by providing information about current and upcoming efforts being conducted by U.S. standards developing organizations, specifically code changes associated with the 2018 Group A International Codes (I-Codes) of the International Code Council (ICC) that are relevant to ESSs.

25 ENERGY STORAGE↗

Energy Storage Data Submission Guidelines

In order to consider and understand emerging energy storage technologies, data analysis can be executed to ascertain proper operation and performance. The technical benefits of rigorous testing and data analysis are important for the customer, the planner, developer, and system operator: the end-user has a safe, reliable system that performs predictably on a macro level. The test-and-analyze approach to verifying performance of energy storage devices, equipment, and systems integration into the grid improves the understanding of the value of energy storage over time from the economic vantage point. Demonstrating the lifecycle value of energy storage begins with the data the provider supplies for analysis. After review of energy storage data received from several providers, it has become clear that some ESS data is inconsistent and incomplete - thus leading to a question of the inefficacy of the data when it comes time to analyze it. This paper will review and propose general guidelines such as sampling rates and data points that providers must supply in order for robust data analysis to take place. Consistent guidelines are the basis of the proper protocol to (a) reduce time it takes data to reach those who are providing analyses; (b) allow them to better understand the energy storage installations; and (c) provide high quality analysis of the installation. This paper intends to serve as a starting point for what data points should be provided when monitoring. As battery technologies continue to advance and the industry expands, this paper will be updated to remain current.

25 ENERGY STORAGE↗

Energy Storage System Guide for Compliance with Safety Codes and Standards

Codes, standards and regulations (CSR) governing the design, construction, installation, commissioning and operation of the built environment are intended to protect the public health, safety and welfare. While these documents change over time to address new technology and new safety challenges there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until they are adopted. Until existing model codes and standards are updated or new ones developed and then adopted, one seeking to deploy energy storage technologies or needing to verify an installation’s safety may be challenged in applying current CSRs to an energy storage system (ESS).

25 ENERGY STORAGE↗

Optimal Distribution System Voltage Regulation using State Estimation and DER Grid-Support Functions

Increasing solar energy penetrations may create challenges for distribution system operations because production variability can lead to large voltage deviations or protection system miscoordination. Instituting advanced management systems on distribution systems is one promising method for combating these challenges by intelligently controlling distribution assets to regulate voltage and ensure protection safety margins. While it is generally not the case today, greater deployment of power system sensors and interoperable distributed energy resources (DER)e.g., photovoltaic (PV) inverters, energy storage systems (ESS), electric vehicles (EVs)will enable situational awareness, control, and optimization of distribution systems. In this work, a control system was created which measures power system parameters to estimate the status of a feeder, forecasts the distribution state over a short-term horizon, and issues optimal set point commands to distribution-connected equipment to regulate voltage and protect the system. This two-year project integrated multiple research innovations into a management system designed to safely allow PV penetrations of 50% or greater. The integrated software was demonstrated through extensive real-time (RT) and power hardware-in-the-loop studies and a field demonstration on a live power system with a 684 kVA PV system.

24 POWER TRANSMISSION AND DISTRIBUTION↗