Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Application of Time-Lapse Seismic Monitoring for the Control and Optimization of CO2 Enhanced Oil Recovery Operations

This project, 'Application of Time-Lapse Seismic Monitoring for the Control and Optimization of CO{sub 2} Enhanced Oil Recovery Operations', investigated the potential for monitoring CO{sub 2} floods in carbonate reservoirs through the use of standard p-wave seismic data. This primarily involved the use of 4D seismic (time lapse seismic) in an attempt to observe and map the movement of the injected CO{sub 2} through a carbonate reservoir. The differences between certain seismic attributes, such as amplitude, were used for this purpose. This technique has recently been shown to be effective in CO{sub 2} monitoring in Enhanced Oil Recovery (EOR) projects, such as Weyborne. This study was conducted in the Charlton 30/31 field in the northern Michigan Basin, which is a Silurian pinnacle reef that completed its primary production in 1997 and was scheduled for enhanced oil recovery using injected CO{sub 2}. Prior to injection an initial 'Base' 3D survey was obtained over the field and was then processed and interpreted. CO{sub 2} injection within the main portion of the reef was conducted intermittently during 13 months starting in August 2005. During this time, 29,000 tons of CO{sub 2} was injected into the Guelph formation, historically known as the Niagaran Brown formation. By September 2006, the reservoir pressure within the reef had risen to approximately 2000 lbs and oil and water production from the one producing well within the field had increased significantly. The determination of the reservoir's porosity distribution, a critical aspect of reservoir characterization and simulation, proved to be a significant portion of this project. In order to relate the differences observed between the seismic attributes seen on the multiple 3D seismic surveys and the actual location of the CO{sub 2}, a predictive reservoir simulation model was developed based on seismic attributes obtained from the base 3D seismic survey and available well data. This simulation predicted that the CO{sub 2} injected into the reef would remain in the northern portion of the field. Two new wells, the State Charlton 4-30 and the Larsen 3-31, were drilled into the field in 2006 and 2008 respectively and supported this assessment. A second (or 'Monitor') 3D seismic survey was acquired during September 2007 over most of the field and duplicated the first (Base) survey, as much as possible. However, as the simulation and new well data available at that time indicated that the CO{sub 2} was concentrated in the northern portion of the field, the second seismic survey was not acquired over the extreme southern end of the area covered by the original (or Base) 3D survey. Basic processing was performed on the second 3D seismic survey and, finally, 4D processing methods were applied to both the Base and the Monitor surveys. In addition to this 3D data, a shear wave seismic data set was obtained at the same time. Interpretation of the 4D seismic data indicated that a significant amplitude change, not attributable to differences in acquisition or processing, existed at the locations within the reef predicted by the reservoir simulation. The reservoir simulation was based on the porosity distribution obtained from seismic attributes from the Base 3D survey. Using this validated reservoir simulation the location of oil within the reef at the time the Monitor survey was obtained and recommendations made for the drilling of additional EOR wells. The economic impact of this project has been estimated in terms of both enhanced oil recovery and CO{sub 2} sequestration potential. In the northern Michigan Basin alone, the Niagaran reef play is comprised of over 700 Niagaran reefs with reservoirs already depleted by primary production. Potentially there is over 1 billion bbls of oil (original oil in place minus primary recovery) remains in the reefs in Michigan, much of which could be more efficiently mobilized utilizing techniques similar to those employed in this study.

02 PETROLEUM↗

Carbon Capture and Sequestration from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO 2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO 2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO 2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO 2 from the project and inject the CO 2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO 2 , in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE's target of capturing one million tons of CO 2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2.

08 HYDROGEN↗

Multiscale Assessment of Caprock Integrity for Geologic Carbon Storage in the Pennsylvanian Farnsworth Unit, Texas, USA

Leakage pathways through caprock lithologies for underground storage of CO2 and/or enhanced oil recovery (EOR) include intrusion into nano-pore mudstones, flow within fractures and faults, and larger-scale sedimentary heterogeneity (e.g., stacked channel deposits). To assess multiscale sealing integrity of the caprock system that overlies the Morrow B sandstone reservoir, Farnsworth Unit (FWU), Texas, USA, we combine pore-to-core observations, laboratory testing, well logging results, and noble gas analysis. A cluster analysis combining gamma ray, compressional slowness, and other logs was combined with caliper responses and triaxial rock mechanics testing to define eleven lithologic classes across the upper Morrow shale and Thirteen Finger limestone caprock units, with estimations of dynamic elastic moduli and fracture breakdown pressures (minimum horizontal stress gradients) for each class. Mercury porosimetry determinations of CO2 column heights in sealing formations yield values exceeding reservoir height. Noble gas profiles provide a “geologic time-integrated” assessment of fluid flow across the reservoir-caprock system, with Morrow B reservoir measurements consistent with decades-long EOR water-flooding, and upper Morrow shale and lower Thirteen Finger limestone values being consistent with long-term geohydrologic isolation. Together, these data suggest an excellent sealing capacity for the FWU and provide limits for injection pressure increases accompanying carbon storage activities.

58 GEOSCIENCES↗

Application of Electromagnetic Methods for Reservoir Monitoring with Emphasis on Carbon Capture, Utilization, and Storage

The Controlled-Source ElectroMagnetic (CSEM) method provides crucial information about reservoir fluids and their spatial distribution. Carbon dioxide (CO2) storage, enhanced oil recovery (EOR), geothermal exploration, and lithium exploration are ideal applications for the CSEM method. The versatility of CSEM permits its customization to specific reservoir objectives by selecting the appropriate components of a multi-component system. To effectively tailor the CSEM approach, it is essential to determine whether the primary target reservoir is resistive or conductive. This task is relatively straightforward in CO2 monitoring, where the injected fluid is resistive. However, for scenarios involving brine-saturated (water-wet) or oil-wet (carbon capture, utilization, and storage—CCUS) reservoirs, consideration must also be given to conductive reservoir components. The optimization of data acquisition before the survey involves analyzing target parameters and the sensitivity of multi-component CSEM. This optimization process typically includes on-site noise measurements and 3D anisotropic modeling. Based on our experience, subsequent surveys tend to proceed smoothly, yielding robust measurements that align with scientific objectives. Other critical aspects to be considered are using magnetotelluric (MT) measurements to define the overall background resistivities and integrating real-time quality assurance during data acquisition with 3D modeling. This integration allows the fine tuning of acquisition parameters such as acquisition time and necessary repeats. As a result, data can be examined in real-time to assess subsurface information content while the acquisition is ongoing. Consequently, high-quality data sets are usually obtained for subsequent processing and initial interpretation with minimal user intervention. The implementation of sensitivity analysis during the inversion process plays a pivotal role in ensuring that the acquired data accurately respond to the target reservoirs’ expected depth range. To elucidate these concepts, we present an illustrative example from a CO2 storage site in North Dakota, USA, wherein the long-offset transient electromagnetic method (LOTEM), a variation of the CSEM method, and the MT method were utilized. This example showcases how surface measurements attain appropriately upscaled log-scale sensitivity. Furthermore, the sensitivity of the CSEM and MT methods was examined in other case histories, where the target reservoirs exhibited conductive properties, such as those encountered in enhanced oil recovery (EOR), geothermal, and lithium exploration applications. The same equipment specifications were utilized for CSEM and MT surveys across all case studies.

Barajas-Olalde, César↗

BEAM-FORMING ERRORS IN MURCHISON WIDEFIELD ARRAY PHASED ARRAY ANTENNAS AND THEIR EFFECTS ON EPOCH OF REIONIZATION SCIENCE

Accurate antenna beam models are critical for radio observations aiming to isolate the redshifted 21 cm spectral line emission from the Dark Ages and the Epoch of Reionization (EOR) and unlock the scientific potential of 21 cm cosmology. Past work has focused on characterizing mean antenna beam models using either satellite signals or astronomical sources as calibrators, but antenna-to-antenna variation due to imperfect instrumentation has remained unexplored. We characterize this variation for the Murchison Widefield Array (MWA) through laboratory measurements and simulations, finding typical deviations of the order of ±10%–20% near the edges of the main lobe and in the sidelobes. We consider the ramifications of these results for image- and power spectrum-based science. In particular, we simulate visibilities measured by a 100 m baseline and find that using an otherwise perfect foreground model, unmodeled beam-forming errors severely limit foreground subtraction accuracy within the region of Fourier space contaminated by foreground emission (the “wedge”). This region likely contains much of the cosmological signal, and accessing it will require measurement of per-antenna beam patterns. However, unmodeled beam-forming errors do not contaminate the Fourier space region expected to be free of foreground contamination (the “EOR window”), showing that foreground avoidance remains a viable strategy.

79 ASTRONOMY AND ASTROPHYSICS↗

PRECISE MEASUREMENT OF THE REIONIZATION OPTICAL DEPTH FROM THE GLOBAL 21 cm SIGNAL ACCOUNTING FOR COSMIC HEATING

As a result of our limited data on reionization, the total optical depth for electron scattering, τ, limits precision measurements of cosmological parameters from the Cosmic Microwave Background (CMB). It was recently shown that the predicted 21 cm signal of neutral hydrogen contains enough information to reconstruct τ with sub-percent accuracy, assuming that the neutral gas was much hotter than the CMB throughout the entire epoch of reionization (EoR). Here we relax this assumption and use the global 21 cm signal alone to extract τ for realistic X-ray heating scenarios. We test our model-independent approach using mock data for a wide range of ionization and heating histories and show that an accurate measurement of the reionization optical depth at a sub-percent level is possible in most of the considered scenarios even when heating is not saturated during the EoR, assuming that the foregrounds are mitigated. However, we find that in cases where heating sources had hard X-ray spectra and their luminosity was close to or lower than what is predicted based on low-redshift observations, the global 21 cm signal alone is not a good tracer of the reionization history.

79 ASTRONOMY AND ASTROPHYSICS↗

THE HYDROGEN EPOCH OF REIONIZATION ARRAY DISH. II. CHARACTERIZATION OF SPECTRAL STRUCTURE WITH ELECTROMAGNETIC SIMULATIONS AND ITS SCIENCE IMPLICATIONS

We use time-domain electromagnetic simulations to determine the spectral characteristics of the Hydrogen Epoch of Reionization Arrays (HERA) antenna. These simulations are part of a multi-faceted campaign to determine the effectiveness of the dish’s design for obtaining a detection of redshifted 21 cm emission from the epoch of reionization. Our simulations show the existence of reflections between HERA’s suspended feed and its parabolic dish reflector that fall below -40 dB at 150 ns and, for reasonable impedance matches, have a negligible impact on HERA’s ability to constrain EoR parameters. It follows that despite the reflections they introduce, dishes are effective for increasing the sensitivity of EoR experiments at a relatively low cost. We find that electromagnetic resonances in the HERA feed’s cylindrical skirt, which is intended to reduce cross coupling and beam ellipticity, introduces significant power at large delays (-40 dB at 200 ns), which can lead to some loss of measurable Fourier modes and a modest reduction in sensitivity. Even in the presence of this structure, we find that the spectral response of the antenna is sufficiently smooth for delay filtering to contain foreground emission at line-of-sight wave numbers below k {sub ∥} ≲ 0.2 h Mpc{sup -1}, in the region where the current PAPER experiment operates. Incorporating these results into a Fisher Matrix analysis, we find that the spectral structure observed in our simulations has only a small effect on the tight constraints HERA can achieve on parameters associated with the astrophysics of reionization.

79 ASTRONOMY AND ASTROPHYSICS↗

Delay spectrum with phase-tracking arrays: extracting the H i power spectrum from the epoch of reionization

The detection of redshifted 21 cm emission from the epoch of reionization (EoR) is a challenging task owing to strong foregrounds that dominate the signal. In this paper, we propose a general method, based on the delay spectrum approach, to extract H i power spectra that are applicable to tracking observations using an imaging radio interferometer ('Delay Spectrum with Imaging Arrays'). Our method is based on modeling the H i signal taking into account the impact of wide field effects such as the w-term, which are then used as appropriate weights in cross-correlating the measured visibilities. Our method is applicable to any radio interferometer that tracks a phase center and could be utilized for arrays such as the Murchison Widefield Array (MWA), Low Frequency Array (LOFAR), Giant Meterwave Radio Telescope (GMRT), Donald C. Backer Precision Array for Probing the Epoch of Reionization (PAPER), and HERA. In the literature the delay spectrum approach has been implemented for near-redundant baselines using drift scan observations. In this paper we explore the scheme for non-redundant tracking arrays. This is the first application of delay spectrum methodology to such data to extract the H i signal. We analyze 3 hr of MWA tracking data on the EoR1 field. We present both two-dimensional (k{sub ∥},k{sub ⊥}) and one-dimensional (k) power spectra from the analysis. Our results are in agreement with the findings of other pipelines developed to analyze the MWA EoR data.

79 ASTRONOMY AND ASTROPHYSICS↗

Foreground and Sensitivity Analysis for Broadband (2D) 21 cm–Lyα and 21 cm–Hα Correlation Experiments Probing the Epoch of Reionization

A detection of the predicted anticorrelation between 21 cm and either Lyα or Hα from the epoch of reionization (EOR) would be a powerful probe of the first galaxies. While 3D intensity maps isolate foregrounds in low-k{sub ∥} modes, infrared surveys cannot yet match the field of view and redshift resolution of radio intensity mapping experiments. In contrast, 2D (i.e., broadband) infrared intensity maps can be measured with current experiments and are limited by foregrounds instead of photon or thermal noise. We show that 2D experiments can measure most of the 3D fluctuation power at k<0.2 Mpc{sup −1} while preserving its correlation properties. However, we show that foregrounds pose two challenges: (1) simple geometric effects produce percent-level correlations between radio and infrared fluxes, even if their luminosities are uncorrelated; and (2) radio and infrared foreground residuals contribute sample variance noise to the cross spectrum. The first challenge demands better foreground masking and subtraction, while the second demands large fields of view to average away uncorrelated radio and infrared power. Using radio observations from the Murchison Widefield Array and near-infrared observations from the Asteroid Terrestrial-impact Last Alert System, we set an upper limit on residual foregrounds of the 21 cm–Lyα cross-power spectrum at z∼7 of Δ{sup 2}<181 (kJy sr{sup −1} mK) (95%) at ℓ∼800. We predict levels of foreground correlation and sample variance noise in future experiments, showing that higher-resolution surveys such as LOFAR, SKA-LOW, and the Dark Energy Survey can start to probe models of the 21 cm–Lyα EOR cross spectrum.

79 ASTRONOMY AND ASTROPHYSICS↗

Deep Realistic Extragalactic Model (DREaM) Galaxy Catalogs: Predictions for a Roman Ultra-deep Field

In the next decade, deep galaxy surveys from telescopes such as the James Webb Space Telescope and Roman Space Telescope will provide transformational data sets that will greatly enhance the understanding of galaxy formation during the epoch of reionization (EoR). In this work, we present the Deep Realistic Extragalactic Model (DREaM) for creating synthetic galaxy catalogs. Our model combines dark matter simulations, subhalo abundance matching and empirical models, and includes galaxy positions, morphologies, and spectral energy distributions. The resulting synthetic catalog extends to redshifts z ~ 12, and galaxy masses log 10 (M/M ⊙ ) = 5 covering an area of 1 deg 2 on the sky. We use DREaM to explore the science returns of a 1 deg 2 Roman ultra-deep field (UDF), and to provide a resource for optimizing ultra-deep survey designs. We find that a Roman UDF to ~30 m AB will potentially detect more than 10 6 M UV < -17 galaxies, with more than 10 4 at redshifts z > 7, offering an unparalleled data set for constraining galaxy properties during the EoR. Our synthetic catalogs and simulated images are made publicly available to provide the community with a tool to prepare for upcoming data.

79 ASTRONOMY AND ASTROPHYSICS↗

Using Gravitational Lensing to Probe for Candidate Quintessential Galaxies in the Epoch of Reionization

Abstract Understanding the properties of the first generation of galaxies is an ongoing challenge in observational astrophysics. James Webb Space Telescope deep-field observations have led to the identification of large numbers of galaxies within the Epoch of Reionization (EoR); however, it remains observationally challenging to study the detailed properties of the most numerous, faint high- z galaxies without strong gravitational lensing. To this end, we present five m AB ≃ 24 galaxies, all projected behind the cores of massive clusters where high lensing magnifications significantly (≳1.5 mag) boost their observed brightness. These galaxies are each characterized by a drop-off in their spectra between the near-IR and optical wavelengths, suggesting the presence of a Lyman break at z > 6. The bright sources enable precise dropout color constraints. We combine the dropout data with follow-up imaging to constrain continuum slopes redward of their breaks. Using the open-source spectral energy distribution modeling software Prospector , we characterize two of these galaxies as probable high- z ( z ∼ 6.5–7) and three as probable low- z ( z ∼ 2) sources, demonstrating that for very bright ( m AB < 24) dropout candidates even limited photometric data have good power to distinguish between high- z galaxies and red or dusty low- z galaxies. The two candidate high- z dropouts are comparably bright to the brightest galaxies identified at such redshifts in deep fields, but due to lensing magnifications are intrinsically fainter by at least 1.5 mag. If confirmed, these galaxies represent exciting laboratories for performing detailed follow-up studies of galaxy properties within the EoR.

Roberson, Joshua [University of Cincinnati] (ORCID↗

Design and benefits of a multibeam Earth Observing Radar

The oceanographic rationale is described for continuing to advance the state of the art in satellite radar altimetry, and the expected capabilities of a multibeam Earth Observing Radar are noted. At the end of this decade, there is the possibility that altimeters may be in orbit aboard the American TOPEX, the ESA ERS-1, and the French SPOT satellites at the same time. The TOPEX version will be the most precise altimeter yet built. Global ocean circulation will be measured by using TOPEX to monitor the elevation changes across the ocean basins due to oceanic currents. It will then be possible to monitor the 'mean' circulation patterns in the oceans. The multiple beams of EOR might be used to measure the curvature of the topographic surface. The use of curvature is especially beneficial because it is directly related to ocean circulation, which is a function only of the Laplacian of the topographic height field in a given area. With the EOR, that height field will be known and ocean circulation can be immediately computed.

Parsons, C. L.↗

Project Columbiad: Mission to the Moon. Book 1: Executive Summary. Volume 1: Mission trade studies and requirements. Volume 2: Subsystem trade studies and selection

In response to the Report of the Advisory Committee on the future of the U.S. Space Program and a request from NASA's Exploration Office, the MIT Hunsaker Aerospace Corporation (HAC) conducted a feasibility study, known as Project Columbiad, on reestablishing human presence on the Moon before the year 2000. The mission criteria established were to transport a four person crew to the lunar surface at any latitude and back to Earth with a 14-28 day stay on the lunar surface. Safety followed by cost of the Columbiad Mission were the top level priorities of HAC. The resulting design has a precursor mission that emplaces the required surface payloads before the piloted mission arrives. Both the precursor and piloted missions require two National Launch System (NLS) launches. Both the precursor and piloted mission have an Earth orbit rendezvous (EOR) with a direct transit to the Moon post-EOR. The piloted mission returns to Earth via a direct transit. Included among the surface payloads preemplaced are a habitat, solar power plant (including fuel cells for the lunar night), lunar rover, and mechanisms used to cover the habitat with regolith (lunar soil) in order to protect the crew members from severe solar flare radiation.

Clarke, Michael↗

Project Columbiad: Reestablishment of human presence on the Moon

In response to the Report of the Advisory Committee on the future of the U.S. Space Program and a request from NASA's Exploration Office, the MIT Hunsaker Aerospace Corporation (HAC) conducted a feasibility study, known as Project Columbiad, on reestablishing human presence on the Moon before the year 2000. The mission criteria established were to transport a four person crew to the lunar surface at any latitude and back to Earth with a 14-28 day stay on the lunar surface. Safety followed by cost of the Columbiad Mission were the top level priorities of HAC. The resulting design has a precursor mission that emplaces the required surface payloads before the piloted mission arrives. Both the precursor and piloted missions require two National Launch System (NLS) launches. Both the precursor and piloted missions have an Earth orbit rendezvous (EOR) with a direct transit to the Moon post-EOR. The piloted mission returns to Earth via a direct transit. Included among the surface payloads preemplaced are a habitat, solar power plant (including fuel cells for the lunar night), lunar rover, and mecanisms used to cover the habitat with regolith (lunar soil) in order to protect the crew members from severe solar flare radiation.

Shea, Joseph↗

Platinum Supported on NbRuyOz as Electrocatalyst for Ethanol Oxidation in Acid and Alkaline Fuel Cells

Platinum supported on a mixed metal oxide, NbRu{sub y}O{sub z} (8Nb:1Ru), was evaluated as an electrocatalyst for the ethanol oxidation reaction (EOR) in 0.1 M HClO{sub 4} and 1 M KOH. The support was synthesized from a liquid precursor solution of metal chlorides that was aerosolized and thermally decomposed into a powder via the spray pyrolysis (SP) process. Two samples were of primary interest: 30%Pt deposited onto the support by dry impregnation and 60%Pt as part of the precursor solution that underwent in situ SP Pt dispersion. TEM, SEM, and XRD were used to confirm morphology and deposition of Pt. XPS and XAS studies confirmed elemental distribution and oxidation state of Pt catalyst. In situ IRRAS studies in 0.1 M HClO{sub 4} show that these electrocatalysts are capable of facilitating the complete oxidation pathway of EOR, involving scission of the C-C bond and CO oxidation.

30 DIRECT ENERGY CONVERSION↗

SUBTASK 2.19 – OPERATIONAL FLEXIBILITY OF CO2 TRANSPORT AND STORAGE

Carbon dioxide (CO2) is produced in large quantities during electricity generation and by industrial processes. These CO2 streams vary in terms of both composition and mass flow rate, sometimes substantially. The impact of a varying CO2 stream on pipeline and storage operation is not fully understood in terms of either operability or infrastructure robustness. This study was performed to summarize basic background from the literature on the topic of operational flexibility of CO2 transport and storage, but the primary focus was on compiling real-world lessons learned about flexible operation of CO2 pipelines and storage from both large-scale field demonstrations and commercial operating experience. Modeling and pilot-scale results of research in this area were included to illustrate some of the questions that exist relative to operation of carbon capture and storage (CCS) projects with variable CO2 streams. It is hoped that this report’s real-world findings provide readers with useful information on the topic of transport and storage of variable CO2 streams. The real-world results were obtained from two sources. The first source consisted of five full-scale, commercial transport–storage projects: Sleipner, Snøhvit, In Salah, Weyburn, and Illinois Basin–Decatur. These scenarios were reviewed to determine the information that is available about CO2 stream variability/intermittency on these demonstration-scale projects. The five projects all experienced mass flow variability or an interruption in flow. In each case, pipeline and/or injection engineers were able to accommodate any issues that arose. Significant variability in composition has not been an issue at these five sites. The second source of real- world results was telephone interviews conducted with experts in CO2 pipeline transport, injection, and storage during which commercial anecdotal information was acquired to augment that found during the literature search of the five full-scale projects. The experts represented a range of disciplines and hailed from North America and Europe. Major findings of the study are that compression and transport of CO2 for enhanced oil recovery (EOR) purposes in the United States has shown that impurities are not likely to cause transport problems if CO2 stream composition standards are maintained and pressures are kept at 10.3 MPa or higher. Cyclic, or otherwise intermittent, CO2 supplies historically have not impacted in-field distribution pipeline networks, wellbore integrity, or reservoir conditions. The U.S. EOR industry has demonstrated that it is possible to adapt to variability and intermittency in CO2 supply through flexible operation of the pipeline and geologic storage facility. This CO2 transport and injection experience represents knowledge that can be applied in future CCS projects. A number of gaps in knowledge were identified that may benefit from future research and development, further enhancing the possibility for widespread application of CCS. This project was funded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FC26-08NT43291. Nonfederal funding was provided by the IEA Greenhouse Gas R&D Programme.

Jensen, Melanie↗

Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

Mattes, Karl↗

Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

Mattes, Karl↗