Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Development of a verification program for deployable truss advanced technology

Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

Dyer, Jack E.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Entry Debris Field Estimation Methods and Application to Compton Gamma Ray Observatory Disposal

For public safety reasons, the Compton Gamma Ray Observatory (CGRO) was intentionally deorbited on June 4, 2000. This deorbit was NASA's first intentional controlled deorbit of a satellite, and more will come including the eventual deorbit of the International Space Station. To maximize public safety, satellite deorbit planning requires conservative estimates of the debris footprint size and location. These estimates are needed to properly design a deorbit sequence that places the debris footprint over unpopulated areas, including protection for deorbit contingencies. This paper details a method for estimating the length (range), width (crossrange), and location of entry and breakup debris footprints. This method utilizes a three degree-of-freedom Monte Carlo simulation incorporating uncertainties in all aspects of the problem, including vehicle and environment uncertainties. The method incorporates a range of debris characteristics based on historical data in addition to any vehicle-specific debris catalog information. This paper describes the method in detail, and presents results of its application as used in planning the deorbit of the CGRO.

Mrozinski, Richard B.↗

Servicing operations for the SIRTF Observatory at the Space Station

This paper describes the servicing requirements, plans, and proposed Space Station-based servicing operations for the Space Infrared Telescope Facility (SIRTF) Observatory. SIRTF is a cryogenically-cooled, long-life, one meter class space telescope which will be operated by NASA as a free-flying observatory for infrared astronomy, in the mid-1990's. To achieve its 5-year lifetime requirement (10 year goal), SIRTF must be replenished periodically with cryogenic helium and have its life-limited modular subsystems replaced; capability for contingency repair of warm components will also be provided in the Observatory design. A general description of the SIRTF Observatory is given, including options for the support systems (spacecraft). The overall servicing philosophy and plans are addressed with scheduling and needed support elements described. A proposed Space Station-based servicing scenario is described, including orbital transfer, servicing and checkout operations. A detailed description and timeline for liquid helium replenishment operations is provided, including a conceptual design and technology development program for the cryogenic helium transfer dewar (tanker). Finally, a preliminary SIRTF spares/logistics philosophy is outlined, including tradeoffs to be considered.

Wiltsee, Christopher B.↗

Planning the Voyager spacecraft's mission to Uranus

The application of the systems engineering process to the planning of the Voyager spacecraft mission is described. The Mission Planning Office prepared guidelines that controlled the use of the project and multimission resources and spacecraft consumables in order to obtain valuable scientific data at an acceptable risk level. Examples of mission planning which are concerned with the design of the Deep Space Network antenna, the uplink window for transmitting computer command subsystem loads, and the contingency and risk assessment functions are presented.

Plagemann, Stephen H.↗

Optimizing Consumable Gas Tank Usage while Maintaining Emergency Reserves Between Two Pressure Control Systems on Gateway

Two of NASA’s Lunar Space Station (Gateway) modules, the Habitation and Logistics Outpost (HALO) and International Habitat (IHAB) contain a pressure control system (PCS) that is used to supply Nitrogen (N2) and Oxygen (O2) to maintain a habitable environment within Gateway, with only one of the PCS active at any given time. To protect the crew during a contingency that is affecting pressure control and therefore gas consumables, Gateway is required to have sufficient amount of reserve consumable gas across the entire habitable Gateway stack of modules until the gas can be replenished by crew changing out a gas tank. This will occur in a non-contingency setting either on the current mission or on the next mission. To access the stack reserve Gateway features a Nitrogen Oxygen Transfer System (NOTS) between HALO and IHAB that allows each module’s PCS to access the gas tanks in the other module. The PCS designs are different between the two modules and lack interchangeable tanks so which module has active PCS must be accounted for in logistics planning. This paper describes the logistics resupply planning analysis used to determine the most efficient use of the tanks within each PCS, and a method for switching which module is active for PCS while maintaining the stack reserve that preserves enough gas to cover contingency cases.

Rachel Anne Sturtz↗

Using remotely sensed information to support landslide hazard and exposure assessment throughout the disaster lifecycle

The global coverage and temporal frequency that satellites provide offers a unique opportunity to estimate landslide hazard and exposure throughout the disaster lifecycle, from pre-event planning and forecasting to post-event mapping and impact assessment, and finally to recovery and mitigation. The relevance of satellite-derived data and model products is largely contingent on the spatiotemporal sampling, the hazard characteristics, and the needs from the research or applications community. This work presents an advanced Landslide Hazard Assessment for Situational Awareness (LHASA) framework that brings together satellite and model products with new machine learning techniques and global inventory data to better model landslide hazard and exposure. We present several new ways to map, model, and assess landslide hazard using a range of satellite data. Two new thrusts of this work are to better account for the exacerbating impacts of fires and to provide a multi-day forecast of potential hazard. Together, these additional components blend information from a suite of satellite and model sources to improve early warning of potentially hazardous areas, identify landslide occurrence and impacts in near real-time, and better characterize the spatiotemporal patterns of landslide hazard and exposure more broadly for future awareness and planning. This suite of tools and products is open to the public and provides information to better assess the potential occurrence and impacts of landslides within different regions of the world. This presentation explores both the architecture behind this framework and examples of how the model components and products have been used by different stakeholders around the world.

Thomas Stanley↗

Supervisory Control with Dual Tasking in Post G-Transition Vehicle Landings

BACKGROUND Landing during exploration spaceflight may consist of both planned automated supervisory control and unplanned crew override. Supervisory control, particularly when performed under cognitive load with additional monitoring tasks, is essential for ensuring overall mission success during landing contingencies. Evaluating performance in a relevant Human Landing System (HLS) supervisory landing task after long-duration microgravity exposure can help identify potential risks from human error and sensorimotor alterations. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. Although training and landing aids facilitate successful landings despite disorientation, these adaptive changes may heighten cognitive demand, which must be considered in the landing strategy. It is important to characterize these effects as soon as possible following the G-transition while the sensorimotor system remains in a state of adaptive flux to inform appropriate countermeasures. METHODS A Multi-attribute Lunar Table Battery (MALTB) task was developed for an iOS tablet device to provide flexible crew testing and training capabilities in-flight and on the ground. Elements of the tablet task were derived from the Multi-Attribute Task Battery (MATB, Cegarra et al. 2020). The task requires crew members to study a map of a planned landing site and memorizing the terrain and surface landmarks to inform potential divert maneuvers during landing. The user will oversee a series of approaches through touchdown simulations on the tablet with an external camera view of the Lunar surface. The primary responsibility of the crew member will be to execute a divert if the guidance recommended site is erroneous (e.g., the guidance projected landing target is not within 10m of the planned landing site center), or the projected landing site is no longer suitable due to surface obstacles. Considering vehicle maneuverability and fuel reserves, the divert capabilities will diminish as the task progresses. In cases where a divert is initiated, a new landing target will need to be designated by the user and will be evaluated for the proximity to the original pre-planned site. A secondary operational monitoring task will challenge the user's cognitive reserve by requiring the user to maintain several gauges within acceptable limits and respond to a visual indicator while completing the landing approach. Outcome measures include distance from the planned landing site to the user-initiate divert landing location, ground slope at the new landing site, time to divert, the ability to accomplish the secondary monitoring tasks, and perceived workload. The tablet task is being evaluated in a ground-based study to determine the learning effect of first-time users. The tablet task will be utilized in a flight study to test performance multiple times postflight. Future potential testing in-flight have been identified for capsules with iOS tablet devices. Multi-attribute Lunar Table Battery Task MALTB comprises video footage of thirty distinct landing conditions. The landing scenarios feature various landing sites (n = 3), hazardous object sizes (n = 6), sun azimuth degrees (n = 4), camera modes (i.e., fixed or gimbaled), and navigation bias (i.e., true or false). Each seventy second trial uses a sixty-degree constant glideslope trajectory. The application architecture and layout include user identification setup and data storing, a guided walkthrough of the task and interface components, practice mode for task familiarization, and a modified Bedford workload scale administered following task completion. The time-based dependent measures are saved locally to the iOS Files application and post-processing scripts have been developed to evaluate the remaining measures of performance. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the landing risks associated with sensorimotor alterations. ACKNOWLEDGEMENTS: This project is funded by NASA’s Human Research Program Human Health Countermeasures Element. REFERENCES Cegarra J, Valery B, Avril E, Calmettes C, Navarro J (2020) OpenMATB: A Multi-Attribute Task Battery promoting task customization, software extensibility and experiment replicability. Behav Res Methods 52:1980-1990 doi: 10.3758/s13428-020-01364-w

Matthew McDonnell↗

Benchmark Problem Development for Testing Maturity of Intelligent Contingency Management Tools

This paper presents a process used to develop appropriate scenarios and metrics for evaluating the maturity of intelligent contingency management algorithms. A benchmark scenario is a reference point against which something can be measured, compared, or assessed. Creating an accurate benchmark requires considerable research and expertise. The scenario itself is an artificial representation of a real-world event, designed to achieve a set of learning objectives through experiential learning. Designing an effective benchmark simulation scenario requires careful planning, including identification of clear objectives; capability assessment of the algorithm/tool being evaluated; assessment of necessary levels of fidelity; development of a process flow map of events and event interactions; and identification of metrics that map back to objectives. Thus, a benchmark scenarios for contingency management might consist of one or several commonly used functions taken from real world applications, used for evaluation, characterization and performance measurement of a contingency management algorithm. Behavior of the contingency management algorithm under different environmental conditions should then be able to be predicted using a set of benchmark functions. The paper describes the resulting benchmark problem as an illustration of the application of this process.

Jon Holbrook↗

Bi-Level Adaptive Storage Expansion Strategy for Microgrids Using Deep Reinforcement Learning

Battery energy storage (BES) is a versatile resource for the secure and economic operation of microgrids (MGs). Prevailing stochastic optimization-based approaches for BES expansion planning for MGs are computationally complicated. This work proposes a data-driven bi-level multi-period BES expansion planning framework to determine the siting, sizing, and timing of BES installations. The proposed planning framework unifies deep reinforcement learning (DRL) and linear programming, thereby decoupling the determinations for the integer and continuous decision variables in two time scales, respectively. In the upper level, a rainbow DRL agent with quantile regression is trained to provide dynamic planning policies to accommodate stochastic renewable energy resources (RESs), load, and battery price changes efficiently. Further, the lower level computes the optimal operation of MGs with frequency constraints to hedge the islanding contingency. The two levels communicate with one another by exchanging storage configuration and operating expenses in order to accomplish the shared goal of minimizing investment and operation costs. Comparative case studies on an MG are carried out to demonstrate the superiority of the proposed DRL-based solution to the mixed-integer linear programming counterpart on efficiency, scalability, and adaptability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design Guidelines for Deployable Wind Turbines for Defense and Disaster Response Missions

Access to on-site electrical energy is critical to ensuring a successful military or humanitarian response to conflicts and disasters. These missions typically rely on access to liquid fuel that could be vulnerable to disruption or attack during transport. Generating power on location with wind technology—whether at a contingency base or disaster response coordination point—can reduce this risk and enhance mission reach by diversifying energy sources. Common characteristics of these missions are short planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. These design drivers depart from features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This paper serves as a summary of the full report, Design Guidelines for Deployable Wind Turbines for Military Operational Energy Applications (Sandia report SAND2021-14581 R [1]), which presents the best currently available design guidance for deployable wind turbines to facilitate the effective development and acquisition of technology solutions to support mission success.

17 WIND ENERGY↗

Notional Airspace Operations Demonstration Plan

The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in the NAS Preliminary planning for a notional mission to achieve the objectives and goals has been prepared. The planning is intended to serve as a guide for detailed planning of the AOD.

Trongale, Nicholas A.↗

Effect of Carbon Dioxide Exposure on Physical and Cognitive Performance in A Simulated Spaceflight Contingency Scenario

INTRODUCTION: Carbon dioxide (CO2) produced by astronauts inside space suits can accumulate to levels that may affect health and performance. The human health and performance risks associated with different levels of CO2 exposure in the flight environment remain an area of debate. The purpose of this study is to characterize the limit of acceptable performance (cognitive and physical) decrements and symptom severity for mission operations when subjected to elevated inspired CO2 levels in simulated contingency lunar extravehicular activity (EVA) scenarios. METHODS: This study will create a simulation of a 1-hour, ~2km contingency EVA walk back to a habitat, incorporating a passive treadmill and a fully immersive virtual reality (VR) simulation of a lunar EVA environment. Subjects will be asked to walk on a treadmill while breathing partial pressures of CO2 of 0, 5, 10, 15, 20, 25, 30mmHg for 1 hour at a time. Cognitive performance will be quantified using validated cognitive tests and measures of functional task performance embedded within the VR environment. Test subject symptoms and self-assessment of performance will be evaluated via survey. RESULTS: This study currently has approval from NASA’s Institutional Review Board and has completed the Test Readiness Review process. Next steps for this research study include test subject recruitment, data collection, and analysis. Data collection is planned for calendar year 2023 and 2024. DISCUSSION: This study will provide valuable information regarding how various partial pressures of CO2 exposure impact acute health, as well as cognitive and physical performance during simulated contingency lunar EVA. This information will enable assessment of health and performance risk associated with spacesuit systems and operations concepts for future exploration missions as well as informing definition of future standards and requirements.

D. M. Nusbaum↗

Effect of Carbon Dioxide Exposure on Physical and Cognitive Performance in A Simulated Spaceflight Contingency Scenario

INTRODUCTION: Carbon dioxide (CO2) produced by astronauts inside space suits can accumulate to levels that may affect health and performance. The human health and performance risks associated with different levels of CO2 exposure in the flight environment remain an area of debate. The purpose of this study is to characterize the limit of acceptable performance (cognitive and physical) decrements and symptom severity for mission operations when subjected to elevated inspired CO2 levels in simulated contingency lunar extravehicular activity (EVA) scenarios. METHODS: This study will create a simulation of a 1-hour, ~2km contingency EVA walk back to a habitat, incorporating a passive treadmill and a fully immersive virtual reality (VR) simulation of a lunar EVA environment. Subjects will be asked to walk on a treadmill while breathing partial pressures of CO2 of 0, 5, 10, 15, 20, 25, 30mmHg for 1 hour at a time. Cognitive performance will be quantified using validated cognitive tests and measures of functional task performance embedded within the VR environment. Test subject symptoms and self-assessment of performance will be evaluated via survey. RESULTS: This study currently has approval from NASA’s Institutional Review Board and has completed the Test Readiness Review process. Next steps for this research study include test subject recruitment, data collection, and analysis. Data collection is planned for calendar year 2023 and 2024. DISCUSSION: This study will provide valuable information regarding how various partial pressures of CO2 exposure impact acute health, as well as cognitive and physical performance during simulated contingency lunar EVA. This information will enable assessment of health and performance risk associated with spacesuit systems and operations concepts for future exploration missions as well as informing definition of future standards and requirements.

carbon dioxide↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

Testing Enabling Technologies for Safe UAS Urban Operations

A set of more than 100 flight operations were conducted at NASA Langley Research Center using small UAS (sUAS) to demonstrate, test, and evaluate a set of technologies and an overarching air-ground system concept aimed at enabling safety. The research vehicle was tracked continuously during nominal traversal of planned flight paths while autonomously operating over moderately populated land. For selected flights, off-nominal risks were introduced, including vehicle-to-vehicle (V2V) encounters. Three contingency maneuvers were demonstrated that provide safe responses. These maneuvers made use of an integrated air/ground platform and two on-board autonomous capabilities. Flight data was monitored and recorded with multiple ground systems and was forwarded in real time to a UAS traffic management (UTM) server for airspace coordination and supervision.

Moore, Andrew J.↗

Active rendezvous between a low-earth orbit user spacecraft and the Space Transportation System (STS) shuttle

Active rendezvous of an unmanned spacecraft with the Space Transportation System (STS) Shuttle is considered. The various operational constraints facing both the maneuvering spacecraft and the Shuttle during such a rendezvous sequence are discussed. Specifically, the actively rendezvousing user spacecraft must arrive in the generic Shuttle control box at a specified time after Shuttle launch. In so doing it must at no point violate Shuttle separation requirements. In addition, the spacecraft must be able to initiate the transfer sequence from any point in its orbit. The four-burn rendezvous sequence incorporating two Hohmann transfers and an intermediate phasing orbit as a low-energy solution satisfying the above requirements are discussed. The general characteristics of the four-burn sequence are discussed, with emphasis placed on phase orbit altitude and delta-velocity requirements. The planning and execution of such a sequence in the operational environment are then considered. Factor crucial in maintaining the safety of both spacecraft, such as spacecraft separation and contingency analysis, are considered in detail.

Hooper, H. L.↗