Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Construction of the sPHENIX Detector and Status of Its Commissioning

sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that attempts to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction is well advanced and beam commissioning of ATF2 has started in the second half of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, Andrei↗

Investigation and Mitigation of a Prominent Off-Axis Stray Light Path in Rubin Observatory Commissioning

The "scratched tape" stray light feature is the most prominent and prevalent stray light artifact identified during the commissioning of the Vera C. Rubin Observatory. The scratched tape feature originates when light from large off-axis angles (~20 deg) passes between the mid-level and center-section light baffles, reflects off the primary mirror, and illuminates the LSST Camera focal plane. This scenario represented an unobstructed stray light path to the sky during Rubin commissioning due to delays in the integration of the dome slit light-wind screen. This document describes the identification, modeling, characterization, and mitigation of the scratched tape stray light artifact.

Drlica-Wagner, Alex [Fermilab; Chicago U., Astron.↗

Bayesian Inference for Time Trends in Parameter Values: Case Study for the Ageing PSA Network of the European Commission

There is a nearly ubiquitous assumption in PSA that parameter values are at least piecewise-constant in time. As a result, Bayesian inference tends to incorporate many years of plant operation, over which there have been significant changes in plant operational and maintenance practices, plant management, etc. These changes can cause significant changes in parameter values over time; however, failure to perform Bayesian inference in the proper time-dependent framework can mask these changes. Failure to question the assumption of constant parameter values, and failure to perform Bayesian inference in the proper time-dependent framework were noted as important issues in NUREG/CR-6813, performed for the U. S. Nuclear Regulatory Commission’s Advisory Committee on Reactor Safeguards in 2003. That report noted that “industry lacks tools to perform time-trend analysis with Bayesian updating.” This paper describes an application of time-dependent Bayesian inference methods developed for the European Commission Ageing PSA Network. These methods utilize open-source software, implementing Markov chain Monte Carlo sampling. The paper also illustrates the development of a generic prior distribution, which incorporates multiple sources of generic data via weighting factors that address differences in key influences, such as vendor, component boundaries, conditions of the operating environment, etc.

99 GENERAL AND MISCELLANEOUS↗

Aerial Measuring System (AMS)/Israel Atomic Energy Commission (IAEC) Joint Comparison Study Report

Under the 13th Bilateral Meeting to Combat Nuclear Terrorism conducted on January 8–9, 2013, the committee approved the development of a cost-effective proposal to conduct a Comparison Study of the Aerial Measuring System (AMS) of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and Israel Atomic Energy Commission (IAEC). The study was to be held at the Remote Sensing Laboratory (RSL), Nellis Air Force Base, Las Vegas, Nevada, with measurements at the Nevada National Security Site (NNSS). The goal of the AMS and the IAEC joint survey was to compare the responses of the two agencies’ aerial radiation detection systems to varied radioactive surface contamination levels and isotopic composition experienced at the NNSS, and the differing data processing techniques utilized by the respective teams. Considering that for the comparison both teams were using custom designed and built systems, the main focus of the short campaign was to investigate the impact of the detector size and data analysis techniques used by both teams. The AMS system, SPectral Advanced Radiological Computer System, Model A (SPARCS-A), designed and built by RSL, incorporates four different size sodium iodide (NaI) crystals: 1" × 1", 2" × 4" × 4", 2" × 4" ×16", and an “up-looking” 2" × 4" × 4". The Israel AMS System, Air RAM 2000, was designed by the IAEC Nuclear Research Center – Negev (NRCN) and built commercially by ROTEM Industries (Israel) and incorporates two 2" diameter × 2" long NaI crystals. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 24–27, 2013. The Israeli system, Air RAM 2000, was shipped to RSL-Nellis and mounted together with the DOE SPARCS on a DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the NNSS. A 4-person Israeli team from the IAEC NRCN supported the activity together with 11 members of the RSL team, which consisted of pilots, mechanics, scientists, a data analyst, equipment operators, and operation specialists. All planned flight activities followed by scientific discussions on the collected data were completed. For IAEC, the joint survey provided an opportunity to characterize their system’s response to extended sources of various fission products at the NNSS. As both systems play an important role in their respective countries’ (United States and Israel) national framework of radiological emergency response and are subject to multiple mutual cooperation agreements, it was important for each country to obtain more thorough knowledge of how they would employ these important assets and define the roles that they would each play in an actual response.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Commissioning Plan for a Laser Heater for FERMI@elettra

The purpose of a laser heater is to increase the electron beam uncorrelated energy spread as a way to control and ideally suppress the microbunching instability in the linac drive for x-rays FELs. We review the motivations for equipping FERMI with a laser heater and provide a specification for the basics parameters as well as a description of a practical layout including desired diagnostics provisions for both the electron and laser beams. We also outline some useful operational guidelines for commissioning.

43 PARTICLE ACCELERATORS↗

A framework for monitoring-based commissioning: Identifying variables that act as barriers and enablers to the process

The practice of monitoring-based commissioning (MBCx) using energy management and information systems (EMIS) has been shown to enable and help sustain up to 20% energy savings in buildings. Despite research that has quantified the costs, benefits, and energy savings of MBCx, the process remains under-utilized. To understand why MBCx is not more frequently adopted and how to encourage its use, this research synthesizes qualitative data from over 40 organizations, currently engaging in MBCx. The outcome of this research is a framework containing variables that emerged from the qualitative data, marked as barriers or enablers, organized by phases of the MBCx process. The framework is comprised of 51 emergent variables that fall within 13 different categories. The variables that most frequently act as barriers are data configuration, measurement & verification (M&V), developing specifications for EMIS, and data architecture. Although some variables that act as barriers for one organization were identified as enablers for another. For example, payback/ROI was considered a barrier 7 times and an enabler 3 times. One organization had difficulty making the business case for the initial investment for MBCx due to lack of cost information, while another was able to justify large investments with documented savings of previously implemented measures identified through MBCx. The framework formally validates barriers found in previous research, and can be used by practitioners to better understand common experiences with MBCx. This research also highlights the need for a similar collective data set to validate common enablers to MBCx and also the need for empirical research to determine relationships between variables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commissioning the Front End Test Stand High Performance H{sup -} Ion Source at RAL

The RAL Front End Test Stand (FETS) is being constructed to demonstrate a chopped H- beam of up to 60 mA at 3 MeV with 50 p.p.s. and sufficiently high beam quality for future high-power proton accelerators (HPPA). High power proton accelerators with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources, neutrino factories, waste transmuters and tritium production facilities. The aim of the FETS project is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper details the first stage of construction- the installation and commissioning of the ion source. Initial performance figures are reported.

43 PARTICLE ACCELERATORS↗

Commissioning of the ATLAS Liquid Argon Calorimeters

A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Commissioning Of A Three Dimensional Depolarized Neutron Beamline For Studying The Magnetic Correlation Length Of A Magnetic Material At Tsing Hua Open-Pool Reactor

A new three dimensional neutron depolarization beamline was commissioning at W3 beam port of Tsing Hua Open Pool Reactor (THOR, 2 MW) located in Hsinchu, Taiwan. The beamline consists of a pair of Heusler crystals as neutron polarizer and analyzer. Two three-dimensional rotators were placed before and after the sample position. The sample chamber was enclosed in a mu-metal enclosure with a gradient field at incident and exit ports. Typically, 0.237 nm of monoenergetic neutron was selected for experiments. A flipping ratio of 23 can be obtained which corresponds to a polarization ratio of 92% of this beamline. The typical intensity is 400 n/cm{sup 2}s at 1 MW operation. Magnetic correlation lengths of Ni-ferrite powders with different packing densities were measured to understand the characteristics of this beamline. The magnetic correlation lengths were observed to be 2 mum at virgin state and about 3.1 mum at remanent state. This magnetic correlation length in the virgin state is similar than the particle size. No significant change of domain size at packing density up to 60% implies that the domain wall motion is hindered by the porosity of the sample.

36 MATERIALS SCIENCE↗

Commissioning of the cryogenics of the LHC long straight sections

The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most powering interfaces to the LHC are located in these sections where the particle beams are focused and shaped for collision, cleaning and acceleration. The LSSs are constituted of several unique cryogenic devices and systems like electrical feed-boxes, standalone superconducting magnets, superconducting links, RF cavities and final focusing superconducting magnets. This paper presents the cryogenic commissioning and the main results obtained during the first operation of the LHC Long Straight Sections.

43 PARTICLE ACCELERATORS↗

ASSEMBLY, INSTALLATION, AND COMMISSIONING OF THE ATLAS UPGRADE CRYOMODULE

A new cryomodule containing seven low-beta superconducting radio frequency (SRF) cavities has been added to the ATLAS heavy ion linac, providing an additional 15 MV accelerating potential to the existing accelerator. We describe the final stages of cryomodule assembly, commissioning, and installation in the ATLAS accelerator. The clean techniques used to achieve low-particulate rf surfaces are presented, as are the module design features which enable clean assembly and reliable high-gradient operation. The thermal performance of the cryomodule is described, along with performance data for the SRF cavities. Details on subsystem performance including helium and nitrogen systems, vacuum systems, thermal and magnetic shields, slow and fast tuners, and survey/alignment systems are given.

43 PARTICLE ACCELERATORS↗

Commissioning of electron cyclotron emission imaging instrument on the DIII-D tokamak and first data

A new electron cyclotron emission imaging diagnostic has been commissioned on the DIII-D tokamak. Dual detector arrays provide simultaneous two-dimensional images of T{sub e} fluctuations over radially distinct and reconfigurable regions, each with both vertical and radial zoom capability. A total of 320 (20 verticalx16 radial) channels are available. First data from this diagnostic demonstrate the acquisition of coherent electron temperature fluctuations as low as 0.1% with excellent clarity and spatial resolution. Details of the diagnostic features and capabilities are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of Angle Dispersive X-ray Diffraction Beamline on Indus-2

An Angle dispersive x-ray diffraction (ADXRD) beamline on bending magnet source of Indus-2 synchrotron (2.5 GeV, 300 mA) has been commissioned, for the study of single and polycrystalline samples. The beamline optics is based on vertically focusing Pt-coated pre and post mirrors and sagittal focusing Si (311) based double crystal monochromator. Experimental station consists of a six circle diffractometer equipped with scintillation detector and an image plate area detector for powder diffraction. XRD experiments have been performed to study single crystal and polycrystalline samples.

43 PARTICLE ACCELERATORS↗

Conceptual Design, Implementation and Commissioning of Data Acquisition and Control System for Negative Ion Source at IPR

Negative ion Experimental facility has been setup at IPR. The facility consists of a RF based negative ion source (ROBIN)--procured under a license agreement with IPP Garching, as a replica of BATMAN, presently operating in IPP, 100 kW 1 MHz RF generators and a set of low and high voltage power supplies, vacuum system and diagnostics. 35 keV 10A H- beam is expected from this setup. Automated successful operation of the system requires an advanced, rugged, time proven and flexible control system. Further the data generated in the experimental phase needs to be acquired, monitored and analyzed to verify and judge the system performance. In the present test bed, this is done using a combination of PLC based control system and a PXI based data acquisition system. The control system consists of three different Siemens PLC systems viz. (1) S-7 400 PLC as a Master Control, (2) S-7 300 PLC for Vacuum system control and (3) C-7 PLC for RF generator control. Master control PLC directly controls all the subsystems except the Vacuum system and RF generator. The Vacuum system and RF generator have their own dedicated PLCs (S-7 300 and C-7 respectively). Further, these two PLC systems work as a slave for the Master control PLC system. Communication between PLC S-7 400, S-7 300 and central control room computer is done through Industrial Ethernet (IE). Control program and GUI are developed in Siemens Step-7 PLC programming software and Wincc SCADA software, respectively. There are approximately 150 analog and 200 digital control and monitoring signals required to perform complete closed loop control of the system. Since the source floats at high potential ({approx}35 kV); a combination of galvanic and fiber optic isolation has been implemented. PXI based Data Acquisition system (DAS) is a combination of PXI RT (Real time) system, front end signal conditioning electronics, host system and DAQ program. All the acquisition signals coming from various sub-systems are connected and acquired by the PXI RT system, through only fiber optics link for signal conditioning, electrical isolation and better noise immunity. Real time and Host application programs are developed in LabVIEW and the data shall be stored with a facility of online display of selected parameters. Mathematical calculations and report generation will take place at the end of each beam shot. The paper describes in detail about the design approach, implementation strategy, program development, commissioning and operational test result of ROBIN through a data acquisition and control system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A new neutral particle analyzer diagnostic and its first commissioning on HL-2A

A new neutral particle analyzer diagnostic has been developed for HuanLiuqi-2A (commonly referred to as HL-2A), which can provide the neutral particle flux measurement along 11 separate sightlines, simultaneously, within a wider energy range (1-70 keV). It is an electrostatic type analyzer with a removable pinhole and special-shape condenser. The energy analysis can be flexibly achieved by controlling a preset stepwise high voltage on the condenser. It is compact and its field of view covers HL-2A cross section from -33 cm to 33 cm without 'cross-talk.' The energy spectra and ion temperature profile have been obtained during its commissioning.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

AEgIS experiment commissioning at CERN

The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.

74 ATOMIC AND MOLECULAR PHYSICS↗