Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Buildings Integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

An evaluation of the demand response potential of integrated dynamic window and HVAC systems

Demand response (DR) increases the flexibility and reliability of the electricity grid as use of intermittent renewable energy sources increases. HVAC and envelope DR measures present the largest aggregate energy and peak demand savings potential of all commercial building end uses because their net demand savings occur during critical peak demand periods. Controllable envelope measures include switchable electrochromic windows, operable window attachments such as outdoor louvers, roller shades, and awnings, as well as other innovative facade technologies that can modulate both solar heat gain and daylight admission over a broad solar-optical range. This study evaluated the technical potential of DR-enabled dynamic windows to reduce critical peak demand for a prototypical medium office building situated in all 16 U.S. climates. Model predictive control (MPC) algorithms were designed to minimize electricity cost in daylit perimeter office zones through control of an electrochromic window with and without HVAC thermostat setpoint control. Conventional and time-of-use rates were used to shape the degree of DR. Median annual peak demand savings with window and thermostat control across all climate zones were 24.3 kW (4.4 W/m 2 ) per building or 15.9 W/m 2 for non-north perimeter zones. Resource adequacy at the whole building level was estimated to be 13.1 to 43.4 $/kW per year over the 30-year life of the installation. Co-benefits were increased energy efficiency, and reduced electricity cost and emissions. Visual and thermal comfort requirements were met at all times. Dynamic facades controlled by MPC have substantial technical potential for DR across all U.S. climates and warrant serious consideration for inclusion in DR portfolios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

Design of machine learning models with domain experts for automated sensor selection for energy fault detection

Data-driven techniques that extract insights from sensor data reduce the cost of improving system energy performance through fault detection and system health monitoring. To lower cost barriers to widespread deployment, a methodology is proposed that takes advantage of existing sensor data, encodes expert knowledge about the application system to create ‘virtual sensors’ and applies statistical and mathematical methods to reduce the time required for manual configurations. The approach combines sensor data points with encoded expert knowledge that is generic to the application system but independent of a particular deployment, thereby reducing the need to tailor to individual deployments. Additionally, this paper not only presents a method that detects faults from measured energy data, but also (1) describes an engagement method with experts in the energy system domain to identify data, (2) integrates domain knowledge with the data, (3) automatically selects from among the large pool of potential input data, and (4) uses machine learning to automatically build a data-driven fault detection model. Demonstration on a commercial building chiller plant shows that only a small number of virtual sensors is necessary for fault detection with high accuracy rates. This corresponds to the use of only five out of 52 original sensor data points features. With as few as four features, classification F1 scores exceed 90% on the training set and 80% on the testing set. The results are implementable and realizable using off-the-shelf tools. The goal is to design with domain experts an energy monitoring system that can be configured once and then widely deployed with little additional cost or effort.

47 OTHER INSTRUMENTATION↗

Integrated and Advanced Lighting Controls: The Next Frontier in Energy Savings?

Lighting energy use has significantly declined as a portion of overall building energy usage due largely to the uptake of more efficient light-emitting diode technology. Although the per unit cost of lighting controls has declined, the installation and use of lighting controls are low and the installation and use of advanced controls are abysmally low. Increased use of advanced and connected lighting controls, and the ability to integrate lighting with other building systems (e.g., heat and air, plug loads, miscellaneous loads) that make the building “smarter,” offer the potential for additional energy savings. Studies into the performance of new, advanced lighting control technologies in commercial buildings have generated new findings. Although each field evaluation has interesting results individually, an analysis of their collective findings across a spectrum of commercial building types will help establish the current state of the technology and implications related to market readiness. This paper will analyze results from available field evaluation studies (recently completed as well as ongoing) of retrofit sites and share findings and insights including: • The amount of energy savings that may be expected from these systems. • Cost effectiveness, monetization, and cost points of these systems. • Ideal characteristics of these systems the most viable. • Lessons learned from the installation, commissioning, and occupant response of these systems. The results will support Department of Energy research investments and help inform efficiency programs of the potential of these emerging technologies and how they may fit within the clean energy future.

Myer, Michael↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Design for Verification: Using Design Patterns to Build Reliable Systems

Components so far have been mainly used in commercial software development to reduce time to market. While some effort has been spent on formal aspects of components, most of this was done in the context of programming language or operating system framework integration. As a consequence, increased reliability of composed systems is mainly regarded as a side effect of a more rigid testing of pre-fabricated components. In contrast to this, Design for Verification (D4V) puts the focus on component specific property guarantees, which are used to design systems with high reliability requirements. D4V components are domain specific design pattern instances with well-defined property guarantees and usage rules, which are suitable for automatic verification. The guaranteed properties are explicitly used to select components according to key system requirements. The D4V hypothesis is that the same general architecture and design principles leading to good modularity, extensibility and complexity/functionality ratio can be adapted to overcome some of the limitations of conventional reliability assurance measures, such as too large a state space or too many execution paths.

Mehlitz, Peter C.↗

Open-source simulation platform for air source heat pump integrated with thermal energy storage

Here, this article introduces a modular simulation platform for assessing thermal energy storage (TES) integrated with air source heat pumps (ASHP). The Python platform is an open-source library that includes classes for modeling air-air and air-water heat pumps, TES devices, and the heating load of residential buildings. To validate the ASHP model, the study utilized experimental data obtained from a commercial heat pump evaluated at the National Renewable Energy Laboratory (NREL). The results indicate a mean deviation of 0.7% for COP across the operating range, with a maximum relative deviation of 12.6%. In terms of system heating capacity, the model had an average deviation of 4.3% compared to experimental results, with a maximum deviation of 8.2%. Three classes were implemented for modeling distinct types of TES devices: a generic TES based on energy balances, a sensible isothermal water tank, and a stratified water tank. Details of the mathematical models are provided, along with their respective strengths and limitations. An example is provided showcasing the integration of a residential 10 kWh thermal storage unit with an ASHP operating in Denver, CO. The comparison of two different discharge criteria for the TES unit highlights the importance of control strategies in the system performance.

25 ENERGY STORAGE↗

Light-scattering properties of a woven shade-screen material used for daylighting and solar heat-gain control

Shade-screens are widely used in commercial buildings as a way to limit the amount of direct sunlight that can disturb people in the building. The shade screens also reduce the solar heat-gain through glazing the system. Modern energy and daylighting analysis software such as EnergyPlus and Radiance require complete scattering properties of the scattering materials in the system. In this paper a shade screen used in the LBNL daylighting testbed is characterized using a photogoniometer and a normal angle of incidence integrating sphere. The data is used to create a complete bi-directional scattering distribution function (BSDF) that can be used in simulation programs. The resulting BSDF is compared to a model BADFs, both directly and by calculating the solar heat-gain coefficient for a dual pane system using Window 6.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Energy Dispatch Controller for Fuel Cell-Integrated Multi-Zone Building

Stationary fuel cells provide potential opportunities for energy savings when integrated with buildings. Through smart dispatch of both electrical power and heat generated by the fuel cells and managing the building loads, the buildings can achieve more efficient operation. In this paper, we develop an optimal energy dispatch controller to operate a fuel cell-integrated building. The controller leverages the inherent thermal storage and the dispatchable fuel cell to reduce its operating cost and to allow the building to participate in grid services. The proposed controller is implemented on two types of commercial buildings, a large office building and a large hotel, and the effectiveness of the controller is demonstrated through simulations. The results also indicate that the potential saving varies significantly with different system parameters, including season, fuel prices, and equipment sizing, which provide helpful insights for building operators and other stake holders.

39 EE - Hydrogen and Fuel Cell Technologies (EE-3F↗

High Performance Circulator Pump Demonstration

In commercial buildings, smaller circulator pumps are typically overlooked for energy efficiency upgrades due to their smaller size (typically less than 2.5 hp) and due to the lack of commercially available products that can simultaneously provide a combination of integrated controls and variable speed operation that is required to achieve acceptable energy savings and life cycle cost effectiveness. This General Services Administration (GSA) Green Proving Ground (GPG) project assessed the performance of a new high performance circulator pump (HPCP) at one heating hot water (HHW) application and two domestic hot water (DHW) application at the Denver Federal Center in Denver, Colorado.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FutureGen 2.0 Monitoring Systems Design Basis and Technology Selection: Geohydrologic, Geochemical and Geophysical Considerations

Advances in carbon capture and storage (CCS) technology show promise for addressing carbon dioxide (CO 2 ) emissions and global climate change concerns related to coal-fueled energy. The FutureGen 2.0 Project is intended to demonstrate 1) the technical feasibility of oxy-combustion technology as an approach for implementing carbon capture at new and existing coal-fueled energy facilities, and 2) utility-scale integration of transport and permanent storage of captured CO 2 in a deep geologic formation. Development of the FutureGen 2.0 CO 2 storage site is part of a larger project to design, build, and operate a commercial-scale CCS system capable of capturing, treating, and storing the CO 2 off-gas from a 168-MW(e) gross capacity oxy-combustion coal-fueled power plant located in Meredosia, Illinois—a first-of-its-kind, near-zero emissions coal-fueled power plant with CCS. In cooperation with the U.S. Department of Energy, the FutureGen 2.0 project partners will repower a previously retired oil-fired power plant with oxy-combustion technology to capture approximately 1.1 million metric tons of CO 2 each year—more than 90 percent of the plant’s carbon emissions. Emissions such as sulfur oxides, nitrogen oxides, and mercury will be reduced to near-zero levels. Safe and proven pipeline technology will be used to transport the CO 2 to the storage site and inject it deep into the subsurface through a network of deep-injection wells for long-term storage through geologic sequestration. An evaluation that considered pertinent hydrologic, geochemical, and geophysical processes was performed during development of the testing and monitoring program for the FutureGen 2.0 project. This evaluation informed the technology screening process and, in conjunction with project- and regulation-driven monitoring objectives, was the basis for monitoring technology selection. A summary of the overall monitoring approach adopted by the FutureGen 2.0 project, and a detailed description of the testing and monitoring activities that the FutureGen Industrial Alliance, Inc. will undertake at the FutureGen 2.0 storage site near Jacksonville, Illinois, are documented in a project-maintained testing and monitoring plan. All testing and monitoring activities will be performed in accordance with Title 40 of the Code of Federal Regulations (CFR) Sections 146.89, 146.90, and 146.91 (40 CFR §146.89, 146.90, and 146.91) to verify that the storage site is operating as permitted and is not endangering any underground sources of drinking water (USDWs).

54 ENVIRONMENTAL SCIENCES↗

High-Performance Integrated Window and Façade Solutions for California

The researchers developed a new generation of high-performance façade systems and supporting design and management tools to support industry in meeting California’s greenhouse gas reduction targets, reduce energy consumption, and enable an adaptable response to minimize real-time demands on the electricity grid. The project resulted in five outcomes: (1) The research team developed an R-5, 1-inch thick, triplepane, insulating glass unit with a novel low-conductance aluminum frame. This technology can help significantly reduce residential cooling and heating loads, particularly during the evening. (2) The team developed a prototype of a windowintegrated local ventilation and energy recovery device that provides clean, dry fresh air through the façade with minimal energy requirements. (3) A daylight-redirecting louver system was prototyped to redirect sunlight 15–40 feet from the window. Simulations estimated that lighting energy use could be reduced by 35–54 percent without glare. (4) A control system incorporating physics-based equations and a mathematical solver was prototyped and field tested to demonstrate feasibility. Simulations estimated that total electricity costs could be reduced by 9-28 percent on sunny summer days through adaptive control of operable shading and daylighting components and the thermostat compared to state-of-the-art automatic façade controls in commercial building perimeter zones. (5) Supporting models and tools needed by industry for technology R&D and market transformation activities were validated. Attaining California’s clean energy goals require making a fundamental shift from today’s ad-hoc assemblages of static components to turnkey, intelligent, responsive, integrated building façade systems. These systems offered significant reductions in energy use, peak demand, and operating cost in California.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Satellite and Ground System Solutions at Your Fingertips

In the summer of 1998, the blockbuster action movie Armageddon captivated audiences with a thrilling doomsday plot about a meteor the size of Texas that was racing towards the Earth. Though the premise of the movie was purely fictional, the unfortunate reality is that near-Earth asteroids such as the one portrayed in the film do exist. On December 23, 2004, NASA announced that an asteroid it anticipated to pass near the Earth on April 13, 2029, had been assigned the highest score to date on the universally used Torino Impact Hazard Scale. At first, the flyby distance for the asteroid, dubbed MN4, was uncertain and an Earth impact could not be ruled out. The odds of impact were initially believed to be 1 in 300, high enough to merit special monitoring by astronomers around the world, but were then escalated to 1 in 37 on December 27. NASA officials noted, however, that these odds should not be of public concern, since they were likely to change on a day-to-day basis as new data were received. The officials were correct in their assertion, as any chances of an impact with Earth in 2029 were completely ruled out later that same day. Integral Systems, Inc., a leading provider of satellite ground systems and the first company to offer an integrated suite of commercial-off-the-shelf software products for satellite command and control, is helping NASA keep a careful watch for any close-encountering asteroids with its tracking technology. The company supported the first NASA Discovery mission, the Near Earth Asteroid Rendezvous (NEAR) program, back in 1996, and has expanded its business by building more ground systems for a greater variety of satellites than any other company in the world. (NASA has since launched seven more Discovery missions, with the eighth lifting off earlier this year.) The experience gained from the company s participation in developing satellite command and control ground systems for the NEAR program has bolstered its flagship product line, the EPOCH Integrated Product Suite (IPS), first featured in Spinoff 1997, and led to the creation of its latest product, the Skylight Direct Broadcast Ground Terminal.

Source record↗

NASA Astronauts on Soyuz: Experience and Lessons for the Future

The U. S., Russia, and, China have each addressed the question of human-rating spacecraft. NASA's operational experience with human-rating primarily resides with Mercury, Gemini, Apollo, Space Shuttle, and International Space Station. NASA s latest developmental experience includes Constellation, X38, X33, and the Orbital Space Plane. If domestic commercial crew vehicles are used to transport astronauts to and from space, Soyuz is another example of methods that could be used to human-rate a spacecraft and to work with commercial spacecraft providers. For Soyuz, NASA's normal assurance practices were adapted. Building on NASA's Soyuz experience, this report contends all past, present, and future vehicles rely on a range of methods and techniques for human-rating assurance, the components of which include: requirements, conceptual development, prototype evaluations, configuration management, formal development reviews (safety, design, operations), component/system ground-testing, integrated flight tests, independent assessments, and launch readiness reviews. When constraints (cost, schedule, international) limit the depth/breadth of one or more preferred assurance means, ways are found to bolster the remaining areas. This report provides information exemplifying the above safety assurance model for consideration with commercial or foreign-government-designed spacecraft. Topics addressed include: U.S./Soviet-Russian government/agency agreements and engineering/safety assessments performed with lessons learned in historic U.S./Russian joint space ventures

Source record↗

Fit2Fly: A Proof of Concept for Testing the Commercial Feasibility of Unmanned Aerial System Operations

As autonomous Unmanned Aerial Systems (UAS) become more prevalent, improvements in airworthiness assessments, data security, establishing vehicle trust, and more will become necessary to make fleet operations of these systems routine. Currently, these are verified for every UAS vehicle through a time-intensive manual inspection performed by human individuals. This process becomes infeasible when introduced into large-scale operations, so the Fit2Fly project is attempting to address these concerns. Fit2Fly is a multi-year project with a large scope, so we chose to narrow our focus to building a proof-of-concept feasibility simulation in tandem with physical UAS demonstration. This work resulted in a software simulation capable of running asynchronous commercial operations with persistent data modeling in coordination with several autonomous drones using integrated radio and GPS configurations.

Ryan Bonk↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗