Scheduling and Estimating the Cost of Crew Time

In a previous paper, Theory and Application of the Equivalent System Mass Metric, Julie Levri, David Vaccari, and Alan Drysdale developed a method for computing the Equivalent System Mass (ESM) of crew time. ESM is an analog of cost. The suggested approach has been applied but seems to impose too high a cost for small additional requirements for crew time. The proposed method is based on the minimum average cost of crew time. In this work, the scheduling of crew time is examined in more detail, using suggested crew time allocations and daily work schedules. Crew tasks are typically assigned using priorities, which can also be used to construct a crew time demand curve mapping the value or cost per hour versus the total number of hours worked. The cost of additional crew time can be estimated by considering the intersection and shapes of the demand and supply curves. If e assume a mathematical form for the demand curve, a revised method can be developed for computing the cost or ESM of crew time. This method indicates a low cost per hour for small additional requirements for crew time and an increasing cost per hour for larger requirements.

Jones, Harry↗

The structure of the software cost function

It is the purpose of this paper to analyze the structure of the cost estimating relationships that commercial cost models use and to test whether they are viable cost functions.

cost function cost estimating relationship wage ra↗

Handbook for estimating fabrication costs

Guide helps design engineers determine total cost of fabricating electronic equipment. It contains tables of "factors" for determining costs associated with fabrication. "Standards" section includes estimations of time required for procedures ranging from machining, to wiring, to printed-circuit board fabrication.

Freeman, L. M.↗

Project resource reallocation algorithm

A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

Myers, J. E.↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A fixed collector employing reversible vee-trough concentrator and a vacuum tube receiver for high temperature solar energy systems

A solar heat collection system employing non-tracking reflectors integrated with a fixed vacuum tube receiver which achieves modest year-round concentration (about 2) of the sunlight at low capital costs is discussed. The axis of the vee-trough reflector lies in a east-west direction and requires reversal of the reflector surfaces only twice a year without disturbing the receiver tubes and associated plumbing. It collects most of the diffuse flux. The vacuum tube receiver with selective absorber has no convection losses while radiation and conduction losses are minimal. Significant cost reductions are offered since the vee-trough can be fabricated from inexpensive polished or plastic reflector laminated sheet metal covering 2/3 of the collection area, and only about 1/3 of the area is covered with the more expensive vacuum tube receivers. Thermal and economic performance of the vee-trough vacuum tube system, year-round variation of the concentration factor, incident flux, useful heat per unit area at various operation temperatures and energy cost estimates are presented. The electrical energy cost is estimated to be 77 mills/kWh, and the system construction cost is estimated to be $1140/kWe.

Selcuk, M. K.↗

Assessment of industrial applications for fuel cell cogeneration systems

The fuel cell energy systems are designed with and without a utility connection for emergency back-up power. Sale of electricity to the utility during periods of low plant demand is not considered. For each of the three industrial applications, conceptual designs were also developed for conventional utility systems relying on purchased electric power and fossil-fired boilers for steam/hot water. The capital investment for each energy system is estimated. Annual operating costs are also determined for each system. These cost estimates are converted to levelized annual costs by applying appropriate economic factors. The breakeven electricity price that would make fuel cell systems competitive with the conventional systems is plotted as a function of naphtha price. The sensitivity of the breakeven point to capital investment and coal price is also evaluated.

Stickles, R. P.↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

CMC Property Variability and Life Prediction Methods for Turbine Engine Component Application

The ever increasing need for lower density and higher temperature-capable materials for aircraft engines has led to the development of Ceramic Matrix Composites (CMCs). Today's aircraft engines operate with >3000"F gas temperatures at the entrance to the turbine section, but unless heavily cooled, metallic components cannot operate above approx.2000 F. CMCs attempt to push component capability to nearly 2700 F with much less cooling, which can help improve engine efficiency and performance in terms of better fuel efficiency, higher thrust, and reduced emissions. The NASA Glenn Research Center has been researching the benefits of the SiC/SiC CMC for engine applications. A CMC is made up of a matrix material, fibers, and an interphase, which is a protective coating over the fibers. There are several methods or architectures in which the orientation of the fibers can be manipulated to achieve a particular material property objective as well as a particular component geometric shape and size. The required shape manipulation can be a limiting factor in the design and performance of the component if there is a lack of bending capability of the fiber as making the fiber more flexible typically sacrifices strength and other fiber properties. Various analysis codes are available (pcGINA, CEMCAN) that can predict the effective Young's Moduli, thermal conductivities, coefficients of thermal expansion (CTE), and various other properties of a CMC. There are also various analysis codes (NASAlife) that can be used to predict the life of CMCs under expected engine service conditions. The objective of this summer study is to utilize and optimize these codes for examining the tradeoffs between CMC properties and the complex fiber architectures that will be needed for several different component designs. For example, for the pcGINA code, there are six variations of architecture available. Depending on which architecture is analyzed, the user is able to specify the fiber tow size, tow spacing, weave parameter, and angle of orientation of fibers. By holding the volume fraction of the fibers constant, variations in tow spacing can be explored for different architectures. The CMC material properties are usually calculated assuming the component is manufactured perfectly. However, this is typically not the case so that a quantification of the material property variability is needed to account for processing and/or manufacturing imperfections. The overall inputs and outputs are presented using a regression software to rapidly investigate the tradeoffs associated with fiber architecture, material properties, and ultimately cost. This information is then propagated through lifing models and Larson-Miller data to assess timehemperature-dependent CMC strength. In addition, a first order cost estimation will be quantified from a current qualitative perspective. This cost estimation includes the manufacturing challenges, such as tooling, as well as the component cost for a particular application. Ultimately, a cost to performance ratio should be established that compares the effectiveness of CMCs to their current rival, nickel superalloys.

Cheplak, Matthew L.↗

Software Transition Project Retrospectives and the Application of SEL Effort Estimation Model and Boehm's COCOMO to Complex Software Transition Projects

The Multimission Image Processing Subsystem (MIPS) at the Jet Propulsion Laboratory (JPL) has managed transitions of application software sets from one operating system and hardware platform to multiple operating systems and hardware platforms. As a part of these transitions, cost estimates were generated from the personal experience of in-house developers and managers to calculate the total effort required for such projects. Productivity measures have been collected for two such transitions, one very large and the other relatively small in terms of source lines of code. These estimates used a cost estimation model similar to the Software Engineering Laboratory (SEL) Effort Estimation Model. Experience in transitioning software within JPL MIPS have uncovered a high incidence of interface complexity. Interfaces, both internal and external to individual software applications, have contributed to software transition project complexity, and thus to scheduling difficulties and larger than anticipated design work on software to be ported.

SEL Boehm COCOMO↗

Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

Zapata, Edgar↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

09 BIOMASS FUELS↗

Supporting data for Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

Li, Shuyun↗

Launching Science: Science Opportunities Provided by NASA's Constellation System

In 2004 NASA began implementation of the first phases of a new space exploration policy. This implementation effort included the development of a new human-carrying spacecraft, known as Orion; the Altair lunar lander; and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System (described in Chapter 5 of this report). The Altair lunar lander, which is in the very preliminary concept stage, is not discussed in detail in the report. In 2007 NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System. To do so, the NRC established the Committee on Science Opportunities Enabled by NASA's Constellation System. In general, the committee interpreted "Constellation-enabled" broadly, to include not only mission concepts that required Constellation, but also those that could be significantly enhanced by Constellation. The committee intends this report to be a general overview of the topic of science missions that might be enabled by Constellation, a sort of textbook introduction to the subject. The mission concepts that are reviewed in this report should serve as general examples of kinds of missions, and the committee s evaluation should not be construed as an endorsement of the specific teams that developed the mission concepts or of their proposals. Additionally, NASA has a well-developed process for establishing scientific priorities by asking the NRC to conduct a "decadal survey" for a particular discipline. Any scientific mission that eventually uses the Constellation System will have to be properly evaluated by means of this decadal survey process. The committee was impressed with the scientific potential of many of the proposals that it evaluated. However, the committee notes that the Constellation System has been justified by NASA and selected in order to enable human exploration beyond low Earth orbit.not to enable science missions. Virtually all of the science mission concepts that could take advantage of Constellation s unique capabilities are likely to be prohibitively expensive. Several times in the past NASA has begun ambitious space science missions that ultimately proved too expensive for the agency to pursue. Examples include the Voyager-Mars mission and the Prometheus program and its Jupiter Icy Moons Orbiter spacecraft (both examples are discussed in Chapter 1). Finding: The scientific missions reviewed by the committee as appropriate for launch on an Ares V vehicle fall, with few exceptions, into the "flagship" class of missions. The preliminary cost estimates, based on mission concepts that at this time are not very detailed, indicate that the costs of many of the missions analyzed will be above $5 billion (in current dollars). The Ares V costs are not included in these estimates. All of the costs discussed in this report are presented in current-year (2008) dollars, not accounting for potential inflation that could occur between now and the decade in which these missions might be pursued. In general, preliminary cost estimates for proposed missions are, for many reasons, significantly lower than the final costs. Given the large cost estimates for many of the missions assessed in this report, the potentially large impacts on NASA's budget by many of these missions are readily apparent.